HomeMy WebLinkAbout2017-06-12 17-196 ORDERCOUNCIL ACTION
Item No. 17-196
Date: June 12, 2017
ORDER, Authorizing Bid Award in the Amount of $986,124 to Lane
Construction for Broadway Resurfacing
Responsible Department: Engineering
Commentary:
On May 17, 2017, the City received two (2) bids to resurface Broadway from Husson Avenue to
Center Street. The bid prices ranged from $986,124 to $992,979 (see attached bid tabulation).
The recommendation is to award the bid to the low bidder, Lane Construction in the amount of
$986,124.
BACTS funding assigned to this project is $150,000 less than required. This BACTS project is
funded 80% federal, 10% state and 10% locally. Additional funds are likely with the closing of two
other City of Bangor BACTS projects. However, in order for this project to move forward, the City
must commit to the additional $150,000 in funding. This funding is available within the Broadway
Corridor project.
This item was recommended by the Finance Committee on June 5, 2017.The contract award
recommendation must be reviewed approved by the City Council as it is over $100,000.
Manager's Comments:
Associated Information:
Bid Tabulation
Budget Approval:
Legal Approval:
Introduced for
X Passage
First Reading
Referral
Department Head
City Manager
Finance Director
Page _ of _
Assigned to Councilor Sprague
CITY OF BANGOR
17-196
JUNE 12, 2017
(TITLE.) Order, Authorizing Bid Award in the Amount of $986,124 to Lane
Construction for Broadway Resurfacing
By the City Council of the City of Bangor.•
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
with Lane Construction in the amount of $986,124 for Broadway resurfacing from
Husson Avenue to Center Street.
IN CITY COUNCIL
JUNE 12, 2017
CO 17-196
PASSED
CITY CLERK
City of Bangor Bid Tabulation
Bid: Broadway Resurfacing III Project
Bid Opening: 2pm, Wednesday, May 17th, 2017
17-196
JUNE 12, 2017
T
P_TL
DJff&L ON
Lane Construction
Corporation
UNIT
E AMOUNT
Pike Industries,
Inc.
MMITYRICE AMOUNT
1
202.202
REMOVING PAVEMENT SURFACE
SY
25333
$4.00
$101,332.00
$2.00
$50,666.00
2
202.203
PAVEMENT BUTT JOINTS
SY
270
$16.00
$4,320.00
0
$5 400.00
3
203.20
COMMON EXCAVATION
CY
35
$138.00
$4.,830.00
0
$3 850.00
4
304.14
AGGREGATE BASE COURSE - GRAVEL
CY
70
$98.00
$6,860.00
0
5 600.00
5
403.213
1/2" HOT MIX ASPHALT - BASE
TON
12
$695.00
$8,340.00
0
$2,220.00
6
403.208
1/2" HOT MIX ASPHALT - SURFACE
TON
3100
93.00
$288,300.00
0
365 800.00
7
403.209
3/8" HOT MIX ASPHALT SW DRIVES INCIDENTALS
TON
134
160.00
$21,440.00
00
24 790.00
vnt3
8
403.211
HMA - 1/2" LEVELING COARSE
TON
750
98.00
$73,500.00
0
$84 000.00
9
409.15
BITUMINOUS TACK COAT APPLIED
GAL
1270
9.00
$11,430.00
00
$12 700.00
10
604.092
CATCH BASIN TYPE Bl -C
EACH
4
$6,000.00
$24,000.00
00
21900.00
11
604.164
REBUILD CATCH BASIN
EACH
2
$6,000.00
$12,000.00
$0
$10 950.00
12
604.18
ADJUSTING MH AND CB TO GRADE
EACH
25
$1,200.00
$30,000.00
$0
$28 750.00
13
608.26
PRECAST TRUNCATED DOMES DETECTION SW RAMPS
SF
465
$95.00
$44 175.00
.00
$37 200.00
14
609.11
VERT. CURB TYPE 1 - GRANITE
LF
334
$66.00
$22,044.00
$40.00
$13,360.00
15
609.15
SLOPED CURB TYPE 1
LF
292
$78.00
$22,776.00
$40.00
$11,680.00
16
609.38
VERT. CURB TYPE 1 - GRANITE/ REMOVE & RESET
LF
1144
$58.00
$66,352.00
$24.00
$27,456.00
17
615.07
LOAM
CY
20
$140.00
$2,800.00
$275.00
$5,500.00
18
618.13
SEEDING METHOD NO. 1
UNIT
3
$500.00
$1,500.00
$960.00
$2,880.00
19
619.12
MULCH
UNIT
3
$500.00
$1,500.00
960.00
$2,880.00.
20
626.22
2" PVC U.G. CONDUIT
LF
100
$50.00
$5,000.00
$45.00
$4,500.00
21
626.34
CONC. FOUNDATIONS - PEDESTRIAN SIGNAL
EACH
2
$1 000.00
$3,000.00
22
627.711
4" WHITE OR YELLOW PAVEMENT MARKING LINE
LF
18616
$0.30
$5,584.80
$0.15
$2,792.40
23
627.75
WHITE OR YELLOW PAVEMENT AND CURB MARKING
SF
8120
$2.001
$16,240.00
$1.66
$13,479.20
24
629.05
HAND LABOR
MH
110
$50.00
$500.00
$30.00
$300.00
25
631.12
ALL PURPOSE EXCAVATOR
MH
10
$220.00
$2,200.00
$225.00.
$2,250.00
26
631.172
TRUCK - LARGE
MH
10
$90.00
$900.00
$100.00
$1,000.00
27
643.80
PEDESTRIAN SIGNAL UPGRADES
LS
1
$35.,000.00
$35,000.00
$24,000.00
$24,000.00
28
652.36
MAINTENANCE OF TRAFFIC
LS
1
$95,000.00
$95,000.00
$147,075.00
$147,075.00
29
652.38
FLAGGER
MH
1200
12L6.00
$31,2001.00
25.00
INA-0,00
SUSTOTAL
$941,123.80
$945,978.60
30
1659.10
MOBILIZATION 5%
LS
11
45 000.0045
000.0
47 000.00
$47.000.00
TOTAL
$986,123.801
$992,978.60