Loading...
HomeMy WebLinkAbout2000-08-14 00-301 ORDERCOUNCIL ACTION Date: aummt Ib. 20M Item No.: 00_301 Rem/Subject Granting Underground Utility Location Permitto Bangor HydroElectric Company- Hammond Street Side Walk Responsible Department: Engineering Commentary: The attached Order is a routine action granting an underground utility location permit to Bangor Hydro Electric Company for the extension of an electrical duct bank on Hammond Street from North High Street to the upper side of the parking for Momma's Kitchen Restaurant The extension to the duct is required to provide power to the Peoples Heritage Bank on the turner of Hammond and Columbia Streets. This change in service from overhead to underground is due to the renovation of the Hammond Street sidewalk between Columbia Street and North High Street. Maine Public Utilities Commission regulations require Council approval of such installations in public ways. Approval is recommended. A copy of the permit application and sketch is attached. m Hmd Managers Comments: ItI� Associated Information: Ua,d,tal fft Budget Approval: Firwlce D" Legal Approval: Introduced For: (N`k Passage First Reading Refenal Page of n K �Vn Wcowcilw Fav h,m August 14, 2000 CITY OF BANGOR (TITLE.) Order, Granting Underground! Utility Location Permit W Bangor Hydm Elechic Oompany- Hammond Street Sidewalk 6y b)e GifYC04W1 aFNre City Ofawgo%. ORDERED, THAT THAT the attached underground utility location permit is hereby granted to Bangor Hydro Electric Company, provided that all work is done In accordance with applicable City codes and ordinances and any additional requirements of the City Engineer. Note: Following are th public streets referred to: 1. Hammond Street from North High Sheet extending southeasterly approximately 110 feet. A copy of the utility location permit application and sketch Is attached. NO PUBLIC NOTICE OF THIS APPLICATION WILL BE MADE. IH CITY COUNCIL A st 14. 2000 Passed ST IN TFd%Oraatiag Underground Utility Location Permit to Bangor Hydro electro Cowpavy - Ha®oad Street Sidewalk July 23, 2000 City of Bangor City Counsel 73 Harlow Street Bangor, Maine 04401 Re: Hammond StreetSide Walk Bangor Hydro Electric requires the extension of its electrical duct bank on Hamrtl0tld Street from North High Streetto the upper side ofthe parking forthe Mama`s Kitchen Restaurant The extension to the duct is required to provide power to On, Peoples Heritage Bank on thecomer of Harntllond and Colombia Streets. The new electrical dud bank will allow, Bangor Hydro Electric to some existing castanets on Hammond Stred via the BHE's underground system. Tbis change N service from overhead to underground is due to the renovation of the sidewalk by the City of Baugm on Hammond Street between Columbia Street and North High Streets. A reference drawivgisprovided. Adetailed as built will be forwarded to the City of Bangor upon completion ofthe installation. Sincerely, mys Electrical Engineer lI/a G� 00-301 MUNICIPAL UNDERGROUND PERMIT To Bangor Hydro -Electric Company: Being the duly appointed appropriate municipal officials of the municipality of BANGOR, by our signature shown below, we have no objection to the Installation of an underground primary or secondary electric duct bank extending from the sidewalk to the duct bank being located within the bounds of the hAAAONq ST mad/street In the town/cityof 6AN Got Said electric duct is installed to provide electric service at 12 :5�O volts, is owned by Bangor Hydro-Elearlc Company and Is to provide service to Bangor Hydro Electric Company and/or MUNICIPAL OFFICIALS: Dear Municipal Officials: The above -referenced underground installations to were completed on 20� Signed, Engineer/Engineering Technician Bangor Hydro -Electric Company 8-5" conduits H� 1-4' conduit X HH17 wam� M�,.MMA's KITCHEN -4" 10' X 16' VAULT 3-4' conduits PLAN # 1 (3-4" conduits) 03 PLAN # 2 -4" conduits