HomeMy WebLinkAbout2000-07-24 00-286 ORDERCOUNCIL AMON
Date: .y Item No.: 00-286
Item/Subjmt Granting Municipal Underground Utility Location Permit to Bangor Hydro
Electric—MDOT6 anUa Street Bridge Project.
Responsible Department Engineering
Commentary:
The Maine Public Utilities Commission mquires that a ability location permit be obtained for portions of
undergiound electrical services locived whttan a public right-of-way. The attached Order is a routine
action which would gram the required permit for "nasion of underground electric conduit on Franklin
Street ne ssary Par the hmOT FranHin Street Bridge Reconstruction Project which is civically
underwaye
Approval is recommended.
aementHead
Mevagels Commats:
�(y C�NM �/r[I✓�
Assocratd lnformatl n//
",
Budget Approval:
Finance Duvr
Legal Approval:
S ic'
0uc or.
Passage
❑ First Reading
0 Referral Page of
AsaiBedw Comcilor Parnh® July 24, 2000
CITY OF BANGOR
(TITLE) Order,
Granting llanicipal Undergroual Utility Location Permit to Banger Hydro
Electric - Franklin Street.
DRDEREDr
TEAT the attached udlity location permit is hereby granted w Bangor Hydro Electic
Company for the instatlatin of underground electrical conduit on Franklin Street provided that all work
be done in accordance with City of Bangor Street Opeaing Regulations, all applicable laws, oniineocev
and codes, and subject to any additional requirements of the City Engincer. A copy of the pnmit
application is anached.
NO PUBLIC NOTICE OF THIS APPLICATION WILL BE MADE
IS CITY COUNCIL 06-286
July 26. 2000
passed 0 N U e R
Title, Granting Numiclpal Underground
Utility location Permit to Bangor
C1T[ Hydro Electric - Praaklln street
( lW,IN m
Bangor Hydro
A La re I rpr 0 .rANY
July 18,2000
City of Bangor
City Counsel
73 Harlow Street
Bangor, Maine 04401
Re: Franklin Street Bridge Repair (MDO'f)
Bangor Hydro Electric rNuhes the extension of its electrical duct bunk
running on Franklin Street from Hammel Street to approximately 10 tcet
beyond the Pierce Block on Franklin Street. The extensionto the duct is required to
provide power to Reed& Reed Construction m support of Us MDOT Project. The new
electrical duct bank will extend the existing duct bank to a new vault to be located in the
area of the Hammond Street approach slab. Additionally, conduits will ma across the
Franklin Street Bridge to a new vault on the Harlow Street side of the bridge in the area
of the Harlow Street approach slab. A reference drawing is provided. A detailed as built
will be forwarded m the City of Bangor upon completion of the installation.
Sincerely,
A6rlf jj
Electrical Engineer. 11
A932 W=044v20912
BmVrH
ELECTRIC ® o
Notice of Construction
Bangor Hydro, in conjunction with MDOT and Reed and Reed Construction, will
be excavating the road and sidewalk between the Franklin Street Bridge and the
corner of the Pierce Block. Tentative construction schedule is Wednesday, July
19, 2000 through Friday, July 21, 2000. This work is necessary to support MOOT
Improvement.
Thank you for your cooperation in this natter.
Alan Solrys, Project Engineer
Bangor Hydro-Elecuic Company
973-2503
3I Sx SEEM -IC, PAY 4l2 -Po Im 01902-0923