Loading...
HomeMy WebLinkAbout2000-07-10 00-282 ORDERCOUNCH. AMON Daze: July 10, 2000 Itav No. 00-282 IteaNSubject Contract Award for All? No. 27, SMOCS, Rehab., Light & Mmk Taxiway 'X'& "1" Responsible Department: AvporVArzchasing Commentary: On June 28, 2000 the City received one bid to rehabilitate, light & mark taxiway "A!'& `T' and to install a Surface Movement Guidance and Control System. (AIP No. 27) the bid was from Lane Contraction Corporlation hr $1,174,416.00. 90% of this project will be paid with FAA, AT funding, 5%with the State DOT funding and 5% with Airport funds. A total of $2,205,556.00 is available forts project and AIF 28, Snow Removal equipment Storage Facility. Both projects came in over their estinutedpwject amounts, and the additiovat funds ro3uvedto contpletethe projects will be covered with next year's funding allocation from the FAA and Maine Deparhnent of Transportation. The recommendation to award the contact to Lane Constmction Corporation was reviewed by the Finance Comndtee on July 5, 2000 and referred to the City Council with a recommendation for approval. Dep He Manager's Conuvents: CRYManager Associated Information: Finance Committee Recommendation and bid tabulation Budget Approval: FinanceDctor Legal Approval: s 0-11 -clur Introduced For: X Passage_firaReadmg_Refmal 0O 282 M gaedmC aor s emblc .July to, 2000 CITY OF BANGOR (TITLE.)(PriteIt....___Awborivug.Cnnnac[.AwaM.mI.ene Cnnshugiun Corp...taRehatri4tak.. Light & Mark Taxiway "N'& "1" By the City CeuseU of Bu My of Bangor: ORDERED, 2n2 David N. Pellegrino, Purchasing Agenda hereby authorized to execute a contract with Lane Construction Corporation in the amount of $1,174,416.00, to Rehabilitate, Light & Mark Taxiway "Ao& "Jo at Bangorinternational Airport(A No. 27). IP ClW COIfCEL July 10, 2000 motiou for Passage Made and Seconded Passed ucm C 00-282 ORDER Title, Authorizing Contract Award to Lane Construction Corp. toRebabilitate, Light 6 Mark Taxiway "A" 6 "8' ...................................... ... ............................. (?� ^ C A dgnea to p�. •ANnu4(....... ..... Councilman 00-282 Cl" OF BANGOR BIG TABULATION Bid Opening: 06GLAX) AIP%27-INSTALL SMGCS. REHAB. LIGHT & MARK TAXIWAY W & "J" Page .I of 3 Lain Construction Corp. Needed. CT ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE L Engineers Ford OlOce I EA 75,000.00 75000.00 2. Portland Cement Concrete ruffling 6,700 SY 4.60 30,820.00 3, Bit. Cone over PCC Milling 2,600 BY 3.85 10,010.00 4. BH Corande Sasses Control Joint 1,000 LF 1.25 1,250.00 5. Crack Sling 1,000 LF 0.75 750.00 6, Pavement Stress Rarievmg Interhand 9,8005Y 500 49,000.00 7. Store 0 Me All Lighting Vault ILS 55,OW.00 55,000.00 8, New Flush Taxiway Cddedine Lights 17 EA 3.000.00 51,00.00 9. New Flush Rumvery Guard Light 70 EA 3,400.00 238,000.00 10. Eldoded Runway Guard Light 14 EA 2,800.00 39,200.00 11 11. Runway Guard Light Controls stem 1 LS 140,000.00 140,000.00 12. Crack& Beat PCO Pavement 9,8005Y 4.50 44,10.00 13. Unchanged Excavation 1,20 CY 850 10,200.00 IC Trach Rock Excavation 170 CY 100.00 2720.00 15. Bituminous Pavement Removal 6.70 BY 375 25,125.00 16. Existing Structure Removal 17 EA 415.00 7,055.00 17. Adjust Existing Structure to Grade 3 EA 475.00 1,425.00 10. Subbase Course 500 CY 20.00 10,000.00 19: Slone Check Dam 5 EA 125.00 625.00 20. Black& Gravel Drop lNet Filler 1 EA 350.00 350.00 21. Silt Fence 1,100 LF 1.60 1,760.00 22. R rass Seed 100 LB 1.25 125.00 23. Crushed Aggregate Base Course LISS CY 30.00 34.5000 24. Brune us Concrete Pavement 3,100 TON 4100 127.100.00 it 25. Bituminous Concrete Leveling Course 460 TON 41.00 18,86000 26. iffiturninousPirmseCcat 2,600GAL 4.25 11,050.00 27. BXuminous Tack Coal 3,100 GAL 4.50 13,950.00 28, Taxiway Painting 8.000 BE 1.00 8,000.00 29. 1 T DIa. Reinforced Concrete Pipe 250 LF 50.00 14,500.00 30. Catch Barin IEA 4,25000 4,250.00 31. Install Underground Cable forAmme; 53,000 LF 0.66 34,450.00 32. 2' 1-WayConoete Encased Dud BW LF 6.50 5,200.00 33. 2.1 -Way Unand sed Dud 2,800 LF 5.00 14,00000 34. Electrical Hancl ides 7 EA 600.00 4,200.00 35. Duct MaMers 5 E 150.00 750.0 36. Regid Steel Conduit ar POC Fevdrent 1,700 LF 10.0 30.600.OD 37. Nen Taxiway Sign t EA 10,000.00 10,000.00 38. Seraching 6,300 BY 0.221 ,38800 39. Topsoil4" Deep 6,300 SY 3.75 23.625 00 TOTALAdOUNTSID: 1,174,418.00 Page .I of 3 00-282 CITY OF BANGOR BIDTABULATION Blit Opening: - 0621A00 AIP 627ANSTALL BMCCS. REHAB. LIGHT & MARK TAXIWAY "A" B "J" AOOITIVE ALTERNATE NO.1 Lane Consimc0on Corp. Mail CT ITEM DESCRIPTION QTY UNIT UNITTOTAL PRICE PRICE 1. Engineer's Field Office 1 L 2,00000 2,000.00 2 Portland Cement Concrete Millin 3,300 BY 3A0 11,220.00 3. Bit. Cane over PME11,mg 51800 SY 3.00 1 1],400.00 4. BX Concrete Sawed CcrNi Joint 550 LF 1.60 I 8110.00 54 Check Sealing 1,000 LF 0.75 750.00 6. Pavement Stares Herearing Interlayer 9,000 BY 5.50 49,500.00 ]. Crack& But PCC Pavement 9,000 BY 4.50 40,500.00 8. Undesssed Excavation 800 CY 8.50 6,800.00 9, Bituminous Pavement Removal 1,500 SV 3.25 4,87500 10. Adjust Evading Sbucture to Grade 2 E 600.00 1,20ODD 11, Subbase Comae 100 CY 16.00 1,60000 12. Some Check Dam 5 E 12500 825.00 13. Block & Gravel Basin Sediment Filter 3 U 350.00 1,050.00 14. Bilt Fence 550 LF 1,60 000.00 15. Rye0ras5 Seed 100 LB 1.25 125.00 16. Excelsior Massing 300 SY 1.50 450.00 17. Crushed Aggregate Base Course 170 CY 3000 5,1011.00 10. Bituminous Concrete Pavement 1,900 TON 41 00 ]],900.00 19. Bituminous Concrete Leveling Course 650 TON 4100 26,65000 20. Bituminous PrMe Coal 820 GAL 425 3A8500 21. Biluminoua Tack Cast 2,900 GAL 4.50 13,OW.din 22. Taxiway Painting 9.000 SF 0.50 4,500.00 23. Seetlin 2,]00 SY 0.28 ]56.00 24. T apllin9 2,]OO SY I 3 0D I B,100 W TOTAL ALTERNATENO. 1 BIO: $2)9,396.00 Page 2 or ] OS -262 BiDTABULATIGN BIE Openiig: 0121m AIP 127ANSTALL SMGCS. REHAB. LIGHT B MARK TAXIWAY "A" 8 "J• TOTAL BASE BID ALTERNATED 810 ITEMS: Lane Canatrucdlon Cary. Meri4an, CT ITEM DESCRIPTION OTY UNI UNIT PRICE OTA PRICE 1. Reinfametl GrdInterlayer Swo 5Y 7.40 1 72,52000 2. New Spars Taxies CeMeNIreLM SEA E 66,fi00.00 550.00 2,75000 3. New S RumGuaN L hl FN. 5 EA 550.00 2.750.00 TOTALAMOUNTBID'. $ 70,02000 TOTAL ADDITIVE ALTERNATED NO.4 ALTERNATE BID ITEMS: L"reConstruction Cop. Miv= CT ITEM DESCRIPTION ON UNI UNIT PRICE TOTAL PRICE 1. Reinforcea GrM Inkrlayer I 9,000 SY TAO 66,600.00 TOTAL AMOUNT BID: E 66,fi00.00 Pape3 of 3