HomeMy WebLinkAbout2000-07-10 00-282 ORDERCOUNCH. AMON
Daze: July 10, 2000 Itav No. 00-282
IteaNSubject Contract Award for All? No. 27, SMOCS, Rehab., Light & Mmk Taxiway 'X'& "1"
Responsible Department: AvporVArzchasing
Commentary:
On June 28, 2000 the City received one bid to rehabilitate, light & mark taxiway "A!'& `T' and to
install a Surface Movement Guidance and Control System. (AIP No. 27) the bid was from Lane
Contraction Corporlation hr $1,174,416.00.
90% of this project will be paid with FAA, AT funding, 5%with the State DOT funding and 5% with
Airport funds. A total of $2,205,556.00 is available forts project and AIF 28, Snow Removal
equipment Storage Facility. Both projects came in over their estinutedpwject amounts, and the
additiovat funds ro3uvedto contpletethe projects will be covered with next year's funding allocation
from the FAA and Maine Deparhnent of Transportation.
The recommendation to award the contact to Lane Constmction Corporation was reviewed by the
Finance Comndtee on July 5, 2000 and referred to the City Council with a recommendation for
approval.
Dep He
Manager's Conuvents:
CRYManager
Associated Information: Finance Committee Recommendation and bid tabulation
Budget Approval:
FinanceDctor
Legal Approval:
s 0-11 -clur
Introduced For: X Passage_firaReadmg_Refmal
0O 282
M gaedmC aor s emblc .July to, 2000
CITY OF BANGOR
(TITLE.)(PriteIt....___Awborivug.Cnnnac[.AwaM.mI.ene Cnnshugiun Corp...taRehatri4tak..
Light & Mark Taxiway "N'& "1"
By the City CeuseU of Bu My of Bangor:
ORDERED,
2n2 David N. Pellegrino, Purchasing Agenda hereby authorized to execute a contract
with Lane Construction Corporation in the amount of $1,174,416.00, to Rehabilitate, Light &
Mark Taxiway "Ao& "Jo at Bangorinternational Airport(A No. 27).
IP ClW COIfCEL
July 10, 2000
motiou for Passage Made and
Seconded
Passed
ucm C
00-282
ORDER
Title, Authorizing Contract Award to Lane
Construction Corp. toRebabilitate, Light 6
Mark Taxiway "A" 6 "8'
......................................
... .............................
(?� ^ C
A dgnea to
p�. •ANnu4(.......
.....
Councilman
00-282
Cl" OF BANGOR
BIG TABULATION Bid Opening: 06GLAX)
AIP%27-INSTALL SMGCS. REHAB. LIGHT & MARK TAXIWAY W & "J"
Page .I of 3
Lain Construction Corp.
Needed. CT
ITEM
DESCRIPTION
QTY UNIT
UNIT
PRICE
TOTAL
PRICE
L
Engineers Ford OlOce
I EA
75,000.00
75000.00
2.
Portland Cement Concrete ruffling
6,700 SY
4.60
30,820.00
3,
Bit. Cone over PCC Milling
2,600 BY
3.85
10,010.00
4.
BH Corande Sasses Control Joint
1,000 LF
1.25
1,250.00
5.
Crack Sling
1,000 LF
0.75
750.00
6,
Pavement Stress Rarievmg Interhand
9,8005Y
500
49,000.00
7.
Store 0 Me All Lighting Vault
ILS
55,OW.00
55,000.00
8,
New Flush Taxiway Cddedine Lights
17 EA
3.000.00
51,00.00
9.
New Flush Rumvery Guard Light
70 EA
3,400.00
238,000.00
10.
Eldoded Runway Guard Light
14 EA
2,800.00
39,200.00 11
11.
Runway Guard Light Controls stem
1 LS
140,000.00
140,000.00
12.
Crack& Beat PCO Pavement
9,8005Y
4.50
44,10.00
13.
Unchanged Excavation
1,20 CY
850
10,200.00
IC
Trach Rock Excavation
170 CY
100.00
2720.00
15.
Bituminous Pavement Removal
6.70 BY
375
25,125.00
16.
Existing Structure Removal
17 EA
415.00
7,055.00
17.
Adjust Existing Structure to Grade
3 EA
475.00
1,425.00
10.
Subbase Course
500 CY
20.00
10,000.00
19:
Slone Check Dam
5 EA
125.00
625.00
20.
Black& Gravel Drop lNet Filler
1 EA
350.00
350.00
21.
Silt Fence
1,100 LF
1.60
1,760.00
22.
R rass Seed
100 LB
1.25
125.00
23.
Crushed Aggregate Base Course
LISS CY
30.00
34.5000
24.
Brune us Concrete Pavement
3,100 TON
4100
127.100.00 it
25.
Bituminous Concrete Leveling Course
460 TON
41.00
18,86000
26.
iffiturninousPirmseCcat
2,600GAL
4.25
11,050.00
27.
BXuminous Tack Coal
3,100 GAL
4.50
13,950.00
28,
Taxiway Painting
8.000 BE
1.00
8,000.00
29.
1 T DIa. Reinforced Concrete Pipe
250 LF
50.00
14,500.00
30.
Catch Barin
IEA
4,25000
4,250.00
31.
Install Underground Cable forAmme;
53,000 LF
0.66
34,450.00
32.
2' 1-WayConoete Encased Dud
BW LF
6.50
5,200.00
33.
2.1 -Way Unand sed Dud
2,800 LF
5.00
14,00000
34.
Electrical Hancl ides
7 EA
600.00
4,200.00
35.
Duct MaMers
5 E
150.00
750.0
36.
Regid Steel Conduit ar POC Fevdrent
1,700 LF
10.0
30.600.OD
37.
Nen Taxiway Sign
t EA
10,000.00
10,000.00
38.
Seraching
6,300 BY
0.221
,38800
39.
Topsoil4" Deep
6,300 SY
3.75
23.625 00
TOTALAdOUNTSID:
1,174,418.00
Page .I of 3
00-282
CITY OF BANGOR
BIDTABULATION Blit Opening: - 0621A00
AIP 627ANSTALL BMCCS. REHAB. LIGHT & MARK TAXIWAY "A" B "J"
AOOITIVE ALTERNATE NO.1
Lane Consimc0on Corp.
Mail CT
ITEM
DESCRIPTION
QTY UNIT
UNITTOTAL
PRICE
PRICE
1.
Engineer's Field Office
1 L
2,00000
2,000.00
2
Portland Cement Concrete Millin
3,300 BY
3A0
11,220.00
3.
Bit. Cane over PME11,mg
51800 SY
3.00
1 1],400.00
4.
BX Concrete Sawed CcrNi Joint
550 LF
1.60
I 8110.00
54
Check Sealing
1,000 LF
0.75
750.00
6.
Pavement Stares Herearing Interlayer
9,000 BY
5.50
49,500.00
].
Crack& But PCC Pavement
9,000 BY
4.50
40,500.00
8.
Undesssed Excavation
800 CY
8.50
6,800.00
9,
Bituminous Pavement Removal
1,500 SV
3.25
4,87500
10.
Adjust Evading Sbucture to Grade
2 E
600.00
1,20ODD
11,
Subbase Comae
100 CY
16.00
1,60000
12.
Some Check Dam
5 E
12500
825.00
13.
Block & Gravel Basin Sediment Filter
3 U
350.00
1,050.00
14.
Bilt Fence
550 LF
1,60
000.00
15.
Rye0ras5 Seed
100 LB
1.25
125.00
16.
Excelsior Massing
300 SY
1.50
450.00
17.
Crushed Aggregate Base Course
170 CY
3000
5,1011.00
10.
Bituminous Concrete Pavement
1,900 TON
41 00
]],900.00
19.
Bituminous Concrete Leveling Course
650 TON
4100
26,65000
20.
Bituminous PrMe Coal
820 GAL
425
3A8500
21.
Biluminoua Tack Cast
2,900 GAL
4.50
13,OW.din
22.
Taxiway Painting
9.000 SF
0.50
4,500.00
23.
Seetlin
2,]00 SY
0.28
]56.00
24.
T apllin9
2,]OO SY
I 3 0D I
B,100 W
TOTAL ALTERNATENO. 1 BIO:
$2)9,396.00
Page 2 or ]
OS -262
BiDTABULATIGN BIE Openiig: 0121m
AIP 127ANSTALL SMGCS. REHAB. LIGHT B MARK TAXIWAY "A" 8 "J•
TOTAL BASE BID ALTERNATED 810 ITEMS:
Lane Canatrucdlon Cary.
Meri4an, CT
ITEM
DESCRIPTION
OTY
UNI
UNIT
PRICE
OTA
PRICE
1.
Reinfametl GrdInterlayer
Swo
5Y
7.40
1 72,52000
2.
New Spars Taxies CeMeNIreLM
SEA
E 66,fi00.00
550.00
2,75000
3.
New S RumGuaN L hl FN.
5
EA
550.00
2.750.00
TOTALAMOUNTBID'.
$ 70,02000
TOTAL ADDITIVE ALTERNATED NO.4 ALTERNATE BID ITEMS:
L"reConstruction Cop.
Miv= CT
ITEM
DESCRIPTION
ON
UNI
UNIT
PRICE
TOTAL
PRICE
1.
Reinforcea GrM Inkrlayer
I 9,000
SY
TAO
66,600.00
TOTAL AMOUNT BID:
E 66,fi00.00
Pape3 of 3