HomeMy WebLinkAbout2000-06-26 00-263 ORDERItem/Subjeet: ORDER CONSTITUTING DECLARATION OF OFFICIAL INTENT
PURSUANT TO TREASURY REGULATION 5 1.150-2
Rempoasible Department: Finance
documentary, The attached o=des declares the city's intent to finance, an
s
tax exempt Meis, construction and/or remediation projects t Fruit Street
School. The project's currently estimated met is $1.4 million, of which the
state has indicated its intention to fund $500 thousand. Additionally, the
second $500 thoueaM is anticipated to be financed on a no -interest basis by
the state. expenditures over the a of these two amounts are to be financed
terms by the city Order whatever itucan in this case, the issuance of tax
exempt debt as part of cot annual bond issue next January. 4 e order
authorizes the issuance of up to $2 million as a precaution, although it is
currently anticipated that tax exempt financing of only some $400 thousand
will ultimately be necessary.
DEPARTNFNT XFAD
Mmaeer'e .1C�ad1n/t�e:' 0� I I)bbOAhra ,end dar'r4 tf+`��
AL-W.W G1 I:`�WNS WaaN�.Y
9be� Bawd
CITY R
Aewdated Information: Order, public entice project
description attached.
Budget Approval:
FURACE DIRECTS
ragal approval:
Introduced Far
— Passage
x First Reading Pagv�f
Referral to Finance Committee
COUNCIL ACTION
Date:
06-26-00
Item
No
00-263
Item/Subjeet: ORDER CONSTITUTING DECLARATION OF OFFICIAL INTENT
PURSUANT TO TREASURY REGULATION 5 1.150-2
Rempoasible Department: Finance
documentary, The attached o=des declares the city's intent to finance, an
s
tax exempt Meis, construction and/or remediation projects t Fruit Street
School. The project's currently estimated met is $1.4 million, of which the
state has indicated its intention to fund $500 thousand. Additionally, the
second $500 thoueaM is anticipated to be financed on a no -interest basis by
the state. expenditures over the a of these two amounts are to be financed
terms by the city Order whatever itucan in this case, the issuance of tax
exempt debt as part of cot annual bond issue next January. 4 e order
authorizes the issuance of up to $2 million as a precaution, although it is
currently anticipated that tax exempt financing of only some $400 thousand
will ultimately be necessary.
DEPARTNFNT XFAD
Mmaeer'e .1C�ad1n/t�e:' 0� I I)bbOAhra ,end dar'r4 tf+`��
AL-W.W G1 I:`�WNS WaaN�.Y
9be� Bawd
CITY R
Aewdated Information: Order, public entice project
description attached.
Budget Approval:
FURACE DIRECTS
ragal approval:
Introduced Far
— Passage
x First Reading Pagv�f
Referral to Finance Committee
Assign;dto Councilor alamhette June 26. 2000
CITY OF BANGOR
(TITIE.)Order, ORDER CONSTITUTING DECLARATION OF OFFICIAL INTENT
PURSUANT TO TREASURY REGULATION § 1.150-2
Me Meaty G wndl of the Ery of Sengor.
ORDERED;
THAT
WHEREAS, the City of Bangor, Maine (the'Issuer") currently Intends to proceed wIth the
projects described below (the "Projects"); and
WHEREAS, the Issuer intends to finance the cost; of the Projects through the issuance of
bonds or notes in anticipation thenaM; and
WHEREAS, certain of the costs of the Projects may be paid by the Issuer imor M the Issuance
of such bonds or notes but are intended th be reimbursed from the proceeds thereof; and
WHEREAS, Treasury Regulation 51.15)-2 requires that an 1%uer declare Its official intent hs
reimburse expendRums with proceeds of bomowirgs within 60 days of the date of e>mendaure;
NOW, THEREFORE, the Issuer does hereby declare its official intent as follows:
1. Declaration of The Issuer reasonably evects to reimburse egrerMiWres
made on the Pmjttts with the proceeds of bonds or notes in anticipation thereof to be issued by the
Issuer In Me ma nmum principal amount of $2,000,000.
2, Guananal Deseciptlean of Pmmaftv to which Reimbursement Rel The
following is a masanabty accurate general functional desorption of the Projects with respect to which
reimbursement will be made:
Fruit Street Projects:
a. Site Drainage Including sown drains and Paving to slope water away from the building
b. Ventilation of boiler room and heating Trenches
c. Exterior Renovations including masonry repairs, siding antl Mndow replacements
d. Roof repairs Including a new roof on gym
e. Interior abatement— complete demolition of Interior and asbestos abatement of Roar the
00-263
E Interior Renovations — Including elecbical renovations, calling replacement, fioodng
replacement, interior wall replacement, cabinets and sheMng, and light replacements
g. Contingency
h. Engineering
1. Abatementdesign and monitoring
I Public Availabllih of Official intent This Declaration of Official lnlent shall be
maintained as a public remrd of the Issuer and shall be maintained and otl n ise supevised by E
Clark on behalf of the Issuer. This Declaration of Official Intent shall be available for public Inspection
at the office of the Clerk during normal business hours of the Issuer.
0. Tssasnry Reaulati This is a dedaation of official intent pursuant to the
mculrements of Treasury Regulation § 1.150-2.
S. Authority for Declaration. This dedaatlon is adopted pursuant to the following
action of the Issuer: Order adopted by as City Coundf.
IO un WONCIL
lone 26. 2000
Notion for Passage Node and
Passed
oaf . VIA
Sol
00-263
ORDER
TIUI. cocetitutiug Declaration of
Official Intent Persona[ t0 Treasary
Regulations 81.150-2
To. Ronald Helm, Finance Director
From: Alan F. Kochis, Direptor of Business Services
Date: lune 2, 2000
Re: Fruit Se project
...........................................................................
The Fruit St renovation project started on May 12° with an mnicipated completion date
of August 20'". Essentially we are rebuilding the interior of the school to rectify, air
quality problems caused by water infiltration. All outside work is to address the moisture
infiltration issues. The scope ofthe work and anticipated cons are outlined below.
1. Site Drainage Issues $50,000
This includes storm drains and paving to slope water away from the building
2. Ventilation $10,000
Ventilation of boiler room and heating months
3. Fanner renovations $100,000
Includes masonry repairs, siding and window replacemems.
4. Roof reports $157,000
Includes new roof on gym and repairs to other areas
5. Interior abatement $221,000
Complete demolition of interior and asbestos abatement of floor file.
6. Interior renovations 5560,000
Includes electrical renovations, ceiling rephmement, Flooring replacement, interior
wall replacement, "Wrote and shelving and light replacements
7 Contingency $186,000
8. Engineering $69,000
9. Abatement design and Monitoring $37,500
Total Project $1,392,000
I am anticipating the final war to be closer to 13 million however in a project of this
type, hidden problems can surface at any time.