HomeMy WebLinkAbout2001-07-23 01-293 ORDERCOUNCIL AMON
Date: July 23, 2001 Item No.: 01-293
It=VSubjec i Granting Utility Location Permit to Bangor Gas Company, LLC
Bangor Mall Boulevard from Hope Road to 900' West of Hogan Read.
Responsible Department: Engineering
Commentary:
Bangor Gas Company has submitted an application and location plans for installation of gas
distribution lines in the following street: Bangor Mall Boulevard from Hogan Road to 900' West
of Hagan Road. Approval of the utility location permit is subject to further review by
Engineering prior to issuance of Street Opening Permits from the Engineering Department for
construction.
No separate public notice of this application is to be made.
Dgmrtmem ff N
Manager's Comments: `l A , , f„ a
C IJHCH�D�
d'ry Moiwge.
Asseciamd Information: 0AJ l`"f
Budget Approval:
��UU
Fiwrtce Direc(g
Legal Approval:
ono.
Introduced For: tuysm
❑X Passage
❑ First Reading
❑ Referrel Page Of
01-293
Assigned to Councilor crest cy July 23, 2001
CITY OF BANGOR
(TITLE.) (Orber------ ...-...--
Gra0Dangerlilylolvd Permita Road Gas Company, CLEC
Bangor Mab Blvd. from Rogan Road N 900' West of Hogan Road
Ity the CRh (7emcil of City ofBanyor:
ORDERED,
TMT The attached application brvurellation of gas distribution lines on Bangor Mall
Boulevard from Hogan Road W 900' west of Hogan Road is hereby granted,
provided that au the work is done in accordance with applicable City cods and
ordinances and any additional requGermum of the City Engineer.
No separate public notice of this application is to be made.
IN CITY COURUL
July ", 2001
CLEMK
01-293
ORDER
Title, Ctootio, Utility Locative Pattit t0
Boner Gas Company, LLC - Bangor Ball Blvd.
from Baem Road to 900' Nest. of eogm Uosd
Miguel to
G. �. .....aonciLoa..:.....n..
C
A(iz
01-293
LOCATION PERMIT APPLICATION
FOR
BURIED NATURAL GAS PIPELINE
To the Bangor City Council
Bangor Gas Company, UC respectively requests permission to place and maintain
buried pipes, valves, caps, valve boxes, manholes, tracer wires, warning tapes other
fixtures in, along, under and across portions of the surface of the public streets and
highways as further described in the attached table titled `Location Permit ]bequest".
The above referenced pipes and other fixtures will be placed in accordance with the
enclosed plan shells. The plans are prepared on Base Maps generated from aerial
photography. The aerial photography was taken on November 18, 1998.
Incojunction with this location application, Bangor Gas Company, LLC also re<luests
permission to place and maintain the previously described pipes and other fixtures in,
along, under and across the above intersecting public ways for the purpose of making
connections with such other portions of the natural gas distribution system and buildings
as maybe desired for the purpose of distributing natural gas.
Respectively. submitted by
Bangor Gas Company, UC
July
y���111, 22000011
City ofBangor Location Permit Approval
Date:
01-293
LOCATION PERMIT REQUEST
FORTHE
INSTALLATION OF NATURAL GAS DISTRURUION MAINS
WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OF THE
CITY OF BANGOR
As an integral part of the development of the natural gas distribution system for
the Town of Old Town, Bangor Gas proposed to install polyethylene natural gas
system piping within the road and street right -of --ways according to the table
included below. The pipe mazerial will be PE 2406, medium density polyethylene
gas pipe. The pipe color will be yellow, in compliance with the national color
code standards for utilities. The pipe will be installed by branchless andror
conventional open -cut ditch methods as best suit each location. All gas mains
will be installed at a minimum depth of dome feet fellow the finished surface
guide. Refer m the slashed plans for details of the proposed construction.
Proposed Location Summary Table
Location
From
To
Drawing
Sheet
Linear
Feet
Bangor
Mall Blvd.
Hogan
Road
900' West
of Hogan
Road
OG357
900'