HomeMy WebLinkAbout2001-06-25 01-252 ORDERCOUNCIL ACTION
Date: arms, 25, 2001 Item No.: 01-252
Itone Subject Authorizing Execution ofAgmenentwith MDOTSpeuelProvisions,
Union Street- Project #STP -9152(00)X.
Responsible Departnem: Engineering
Commentary:
The attached Order authorizes execution of a routine agreement with MDOT, which involves
special provisions for moving construction materials and equipment on City Streets m
conjunction with the upcoming Union Street paving project The primary provisions of the
Agreement are twofold: 1) the City to grant permits to move equipment which exemds legal
limits on City Street (which is routinely done) and 2) the Contractor may be required to post a
bond of up to $9,000 per traveled mile of City strerds to cover possible damage.
We have executed similar agreements on a number of previous MDOT projects. Execution of the
agreement is recommended. A copy u attached.
,,,.#Head
Manager's Comments r, �. _,.f
M ^^
Ciry Nonage.
Associated lnformetiosi:(JAgµ,
Budget Approval:
FinameDuWar
Legal Approval:
iN Sa(t Itw
Introduced For: 6
Passage
First Reading
Refemd - Page of
01-252
AeaiprcJ to Coumior Tremble June 21s 2001
:I pp CITY OF BANGOR
(TITLE.) WYDBTa AaOonzing City Manager to Pueute Agreement W16 MUDT=p a1P'
inions,
Union Street, - Project #STP -9152(00)X.
By the City CeumnQ of the Goy ofD�
ORDERED,
MT the City Manager is hereby authorized and drectel to execute and Agreement -
wititthe Maine Department of Transportation regarding special construction
provisions for transportation of construction equipment and materials in
conjunction with the Onion Street paving project.
A copy of &a agreement is attached.
IN Clu C009CI1.
June 25. 2001
Passed
u ri7 C
01-252
ORDER
Title.gptIorizivg City Manager to Execute
Agreement with IEIOi- Special Kovlslons.
Union Street - EraJect ISi 152(00)E
......................................
�iped to
//10nm
.........1 ..................
® /y, Counciloan
Retum completed form to: 01-252
Maine Department of Transportation
ATTN.: Mr. Bruce R. Carter, Contracts Engineer
#16 State House Station, Child Street
Augusta, Maine 04333-0016
Project No. STP -9152(00)X
The. undersigned Municipal Officers of the City of Bangor agree that a permit will be
issued to the Contractor for the purpose of hauling loads in excess of the limits specified
in Title 29, M.R.S.A. on Municipal roads as described in the'Constmction Area" and that
single move,permits will be issued for moving Contractor's construction equipment used
on the project which exceeds the legal limits (backhoes, bulldozers, etc.) to sources of
construction materials over municipal ways reasonably within the area of the project.
In the event that it is necessary to transport gravel, borrow or other construction material
in legally registered vehicles carrying legal loads over municipal ways, a Contractor's
Bond of not more than Mine Thousand Dollars ($9,000.00) per kilometer of traveled
length may be required by the municipality; the exact amount of said bond to be
determined prior to use of my municipal way.
The maximum speed limit for trucks on any municipal way will be forty (40) km per hour
unless a higher legal limit is specifically agreed upon, in writing, by the Municipal
officers.
CITY OF BANGOR
By the Municipal Officials
Project No. STP -9152(00)X
SPECIAEPROVISION
CONSTRUCTION AREA
A Construction Ares located in the City of Bangar has been established by the Maine Department of Transportation
in accordance with provisions of Title 29, Section II03, Maine Revised Statutes Annotated.
The section of highway under construction in Penobscot county on Union St. beginning at ffammond
St. and sktending easterly 0.55 km (0.34 mi).
The State Department of Transportation or the State's Engineer my issue permits for stated periads of time for
moving construction equipment without loads, low -bed trailers with overloads, over -height, over -width or over-Ieng0o
equipment or materials over all State maintained sections described in the "Construction Area" above and in addition
may issue parmim for stated periods of time for moving overweight vehicles and loads over the section described in (a)
above. The right to revoke such a pemrit at any time is reserved by the State Department of Transportation and the
issuance of such permits shall be subject to any Special Provisions or Supplemental Specifications written for this
project.
A Temporary Permit for each move may be issued by the State Department of Transportation ca the State's Engineer
for moving Contractor's cousnuction equipment used on the project which exceeds Ne legal limits (shovels,
bulldozers, etc.) to sources of construction material over highways maintained by the State reasonably within the area
of the pmjset
The Municipal Officers for Ne City of Bangor agreed Out a permit will be issued to the Contractor for the purpose of
hauling loads in excess of the limits as specified in Title 29, Maine Revised Statues Annotated, on the town ways as
described in the "Construction Area" and that single move parries will he issued for moving Contractor's construction
equipment used on me project which exceeds the legal limits (shovels, bulldozers, em.) to somas of construction
material over town ways reasonably within the area of the project.
In the event it is necessary to transport gravel, borrow, or other construction material in legally registered vehicles
carrying legal loads over tawn ways, aCmrtrac[m's Bond of nor moa than Nine Thousand ($9,000.00) per kilometer
of traveled length may be required by the town, the exact amount of said bond to be determined prior to use of any
Own way,
The maximum speed limits Or trucks an any town way will be Lorry (40) km per hour (25 mph], unless ahigher legal
limit is specifically agmand upon in writing by the Municipal Officers concerned.
LOCATION MAP
a 1 z
Scale in Kilometers
7i . IU . ., q► �� �i
Illll�ll'111,�i1�
LOCATION MAP
a 1 z
Scale in Kilometers