Loading...
HomeMy WebLinkAbout2001-06-11 01-249 ORDERCOUNCIL ACTION Done, issue 11, 200A Tremble. 01-269 IteMSubjece Contract Award for Terminal Apron ReconsLLvction Phase 2 & 3 Responable DepmlmenL Airpm/Puchasing Commentary: Gn May 16, 2001 the City received one bid for the reconstruction of the mainal apron; Phase 2 & 3. The bid was from Lane Corvatmction Corpormtion for $1,399,940.00 for phase 2 and $868,580.00 for phase 3. These bid mounts have been reviewed by the Airport and are within the mrd construction budget of $2,246,520.00. Phase 2i being paid with Passenger Facility Charge (PFC) Funds and Phase 3 is funded with 90% Federal, 5% State and 5% City funds (AIP 29). The AIP 29 Gram has $1,453,324.00 allocated to the project and these foods will be provided after the bid is awarded by the City Council. The recommendation m award the contract to Lane Construction Corporation was reviewed by the Finance Committee on May 23, 2001 and referred to the City Council with a recommendation for approval. Departrnent Head M agets Comments: City Manager Associated Information: Finance Committee Recommendation ard bid tabulation Budget Approval: Finan Director Legal Approval: ty 8o lclstz mvoaucea Per: x passage_ past taming_ tceterrai CITYOFBANGOR AWARD RECOMMENDATION BID ITEM(S): Terminal Aomn Remnstal Phase 2 & 3 DEPARTMENT: BUDGET REFERENCE Requisition No.: NIA Account Number:8580-910D8]00(Phase 2) Budgeted Amount:$ Available Balance: $1.6)0.2JBOWPhase 2) Total Amount of Award Recommended: $_21265,520 -or Vendors Recommended: Lane Construction Coro Number of Bids Sent: 12 Number of Bids Received: 1 Date AdverNsetl: ADdl25.2001 Bid Opening Date: May 162001 Past Expedencewith Vendm:X ExceAent_Good _Fair Poor No Prior Experience If aro experience, references checked or other method of vendor reliability established OTHER COMMENTS: Award the contact for Phase 2 & 3 of the apron reconstruction to Lane Construction Corp., of Meriden, Cr, the only bidder at $1,3]],990.00 for Phase 2 and $8611 for Phase 3. Phase 2 is being paid with Passenger Facility Charge (PFC) F an Ph 3 is ndm with 90% Federal, 5% State and 5% City funds. This contract st mnfir he City Council as it exceeds $100,000.00. APPROVALS CWr COUNCIL FINANCE COM Data: Mav 23. 2001 "DrojectFu'nifds d under the ALP 29 Grant which has $1,500,000.00 allocated to the ll be provided after the bid is awarded by the City Council. 01-249 CIWOFBANGOR BIDTABULATION Bid Opening: 05/1661 TERMINAL APRON RECONSTRUCTION PHASE 2 Page i oft Lane Constmctiom Com, Madden, CT ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 1. Engineers Field Office 1 LS 9000000 9000050 2. Consimcion 9amcades 1 LS 8,00000 8000.00 3. BIL Concrete Sawed Control Jdng 18,400 LF 100 18,400.50 4. Contaminated Soil RBmovaVReplace. 210 CY 4200 81820.00 S. Portland Cement Commode Milling 12,500 BY 4.50 56,256A0 6. Bit. Concrete Pavement Milling 0 BY 4.00 7, Fiber Glass Hydrant Fuel Sm. Pit 0 LS 40.000.00 8. Flowage Fill 200 CY 11000 22,006.00 9, Unclassified Excavation 6.20D CY 6.00 37,200.00 10. Roh Excavator 105 CY 70.00 7,350.00 11. UnsultaNe Material RemJReplace 525 CY 2500 13.125.00 12 BIR. Concrete Pavement Removal 1,250 BY 350 4,37500 13, PCC Pavement Removal 4,700 SY 1200 56.400.00 14. Ewsting SWCWre Removal 2 FA 500.00 1,000.00 15. Eveing Pipe &Duct Removal 95 LF 25.00 2.37500 16. Trapmen 0rain Removal 0 1 LF 50.00 17, Subbase Course 630 CY 20.00 12,60000 18. Crushed Aggregate Base Course 1,350 CY 3400 45,800.00 19, Bituminous Concrete Pavement 4,600 TON 38.40 176,640.00 20. Pmtland Cement Concrete Pavement 6,200 BY 6800 421.600.00 21. PCCSai Cut Join 2,600 It 3.00 7,800.00 22. PCC Spall Repair 800 SF 25.00 20,00000 23. Bilummous Prime Coat 0 GAL 800 24. Biluminous Tazh Coat 3,200 GAL 2.20 7,04000 25, Joint Sealing Filler 24,000 LF 100 24,000.00 26. Slung Seal ISOM BY 1.80 2880000 27, 12' Reinforced! Concrete Pipe 53 LF 45.00 2,385.00 28. 18' ReMm2tl Comorete Pipe 256 LF 50.00 12,800.00 29. 24' Felnlprced Concrete Pipe 132 LF 60.00 7,92000 W. 30' Renforoed Concrete Pipe 0 LF 75.00 31. 36' Pewterer! Comcrek Pipe 320 LF 8500 27,200.00 N. Teat Far 1 EA 2,000.00 2,000.00 33. 6'UntlaMrdM prime 1,100 LF 3300 37.120.00 U. Undendrain Cleanout 4 EA 1,200.00 4,80000 35. 6Diameter Manhde 4 EA 4,00000 16,000.00 M. 8Diameter Manhole 1 EA WSW 5,500.00 37. 7'Diameter Magda 1 EA 7.500.00 7,50000 38. TrerM Drain 550 LF 330.00 181,500.00 39. Bare CoppelCwn 200 LF 120 240.00 40, Grond Rod with Receptacle 6 EA 550.00 3130000 41 RI id SWN Cond In Existing PCC 0 LF 17.00 42 Rig.3kel Cond Below New PCO 0 LF 1500 TOTALAMWNTBID: $ 1,377,840.00 Page i oft 01-249 CRY OF BANGOR BIDTABOLATION Bid Opening: OU16101 TERMINAL APRON RECONSTRUCTION PHASE 3 Page 10 1 Lane Conatm Mention, CT ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 1. EngineersFieMOfice 1 LS 25.000.03 25,000.00 2. Construction BaMcades 1 LS 2,000.83 2,00000 3. Bit Concrete Served Control Joint 8.850 LF 1.03 8,050.00 4. Contaminatetl SOU RemnvallRepRce. IA50 CY 4200 44,100.00 5. Forland Cemant CdwaPo Milling T 6,700 3Y 450 30.150.00 6. Bit. Concrete Remmers Milling T 140 BY 4.00 55000 7, FiberGlass Hydrant Fuel Bonn. Pit 1 LS 40,000.00 40,000.00 8. Flowable FIII 100 CY 110.00 11.000.00 9. Undercut Exclusion L000 CY 6.00 6,00000 10. Rock Excenation 105 CY 70.00 7,350.00 11. Unsuitable Material Rem.tReorce 525 CY 1 25.00 13,125.00 12. Mt. Concrete Pavement Removal 500 SY 1 350 1.750.00 13, JPCC Pavement Removal 4.600 BY 12.00 55,200.00 14. EwaBng Swclure Farmhand 1 EA 50000 500.00 1S fxl8lang%e&Oud Removal 11 LF 25.00 9500 16, Trench Drain Removal 570 LF 50.00 20,50000 17. Subbase Course 210 CY 20.00 4,200.00 V5. Orralr� R� Cbg� +�,2f0 6Y 3'300 40,'mcmi 19, Bituminous Concrete Pavement 2,300 TON 3340 06,320.00 20. Portland Cement Ccrwete Pavement 5.000 Sy 6800 340.000.00 21. PCCSaw Cut JoinR 2,100 LF 300 6.300.00 22. PCG Such Repair 520 SF 25.00 13,000.00 23. Bituminous Prima Coat 105 GAL 8.00 840.00 24. Bituminous TVQCoal 1,600 GAL 2.20 3.52000 25. Joint Seafinq Filer 13.000 LF 1.00 13,000.00 26. 31uny Sed 7,900 BY 1.80 14.90.00 27. 12" ReiMorce! Concrete Pipe 0 LF 45.00 28. 18"Reinkmed Concrete Plpe 0 LF 50.00 29. 24'ReIMOrced Concrete Pipe 0 LF 60.00 30, 30" Reinforced Concrete Pigs 107 LF 75.00 14.025.00 31, 36' Reinforced Concrete Pipe 37 LF 85.00 3,145.00 32. TestPie 2 EA 2,000.00 4,000.00 33. 6-UndeNrain Pipe 580 LF 32.00 18,560.80 34. Undwdrain Cleanout 2 EA 1,200.00 2A0000 35. 5' Diameter Manhole 0 EA 4,000.00 36. 6' Diameter Manhole 1 EA E500.00 5,500.00 37. TDiamater Manhole 1 EA 7,500.00 7,50000 38. Trench Drain 0 LF 330.00 39. Bare Copper Counterpoise 100 LF 120 120.00 4a, Gtord Rad warn Rece cls 8 EA 550.00 4,400.00 41 Rigid Steel Dead. In Exisen PCC 460 LF 17.00 7.82000 42. Rig. SRN Send. Babes New PCC 170 LF 15.00 2,550.00 TOTALAMOUNTBID. $050,580.00 Page 10 1 �'4 Aw�edrocounri�or rarriuecou dune it. zoos CITY OF BANGOR (TmeJ Order, Authonzing Contract Award to lane Construction Corporation for the Terminal Apron Reconstruction Phase 2 & 3 By fore Ofycmx#ofthe oiyorawg n. ORDERED, THAT David N.Pellegrino, Purchasing Agent is hereby authorized to execute contract in the amount of $2,246,520.00 with Lane Construction Corporation for the Terminal Apron Reconstruction, Phase 2 & 3, at Bangor International Airport. IN CIIS COUNCIL June 11, 2001 Notiw N e and Seconded ( p 01-269 eneeed aaNx f (TRLEJ n^N R (:oasttoctim Cot oration�fot tM iexmi A H cooatNct n PLeae 2 b 3 Mslgned NCWncRor CYtc�IEHJ