Loading...
HomeMy WebLinkAbout2001-05-30 01-224 ORDER—COUNCIL ACTION Date: May 23, 2001 Item NoI-2u Item/Subject: Contract Award for Nighttime Construction of the Pre-cast Concrete portion oflhe Pickering Square Parking Garage Expansion. Responsible Department: Purchasing/Economic Development Commentary: On April 9,2001 the City Council approved a contract award to Shearon Limited of St.john, New Brunswick, for the pre-cast portion of the Pickering Square Parking Garage Expansion in the amount of $1,201,000.00. In the bidding documents bid amounts were requested far both daytime and nighttime construction-see attached Strescon bid. At the time ofaward it was not certain that nighttime construction would be required and the contract was awarded for the daytime construction amount. The Award Recommendation was made with the stipulation that if nighttime construction was required, the additional cost of $105,000.00 would be incorporated by Change Order. During the pre-construction conference held on May 10, 2001 it became very clear that, due to safety considerations, nighttime construction would be necessary. Since the pre-cast portion of the garage expansion will be assigned to a general contractor and since the pre-cast contract has yet to be executed, this Cornet Order will simply change the bid award amount to the higher cmnnmt mnonnl al' $1,306,000.00 to reflect nighttime construction. n D tH Managers Comments: ^rn,�n^^��./ City Manager Associated Information: Finance Committee Recommendation and bid tabulation Budget Approval: Finance Director Legal Approval: City Solicitor introduced For X Passage_ First Reading_ Referral A ign WCooncilw Farrl gtm May 30, 2001 CITY OF BANGOR (TIRE.) Order, Authorizing the City Manager to Exercise the Contract Option for Nighttime Camtructlon of the Precast Concrete Portion of the Parking Garage E%pansion. By the QZyOxvx#offt OW of&lWr. DRDERED, THAT The Gly Manager is hereby authorized to execute a contract with Strescon Urnited in the amount of $1,306,000 for the nighttime construction of the precast portion of the Pickering Square Paridng Garage Expansion. IN CITY COUNCIL May 30. 2001 Motio for Passage Made and Seconded Passed x cLMNM (TRLE,)^athoriefag the City Mawger to Eae[c3se the Contract Uptian for Mighttfm Construction of the Precast generate Portion of the parkIng Garage ion Assigned! In COUaCI1or rr -wa4G. 01-224 Pickering Ssraw Garage Expaovion Wogoq Mame File No. 11127 SECTION 00300-Bm FORM (REVISED AND REISSUED BY ADDENDUM NO. 1) A. Proposal of $TRSSCOX t IM 0 (hereinRer called "BMD""", orgamad aM rating under the laws of the Sate of Maine, doing business as STRESMR LIMIT80 '. To the CITY OF MR" (hereinafter , rolled "OWNER"). B. Eidd M pdggs forach of theel listed b LDAY TIME CONCTRU TION/ EMcUON N compliance with your Advedurrunat for Bids, BMDER hereby proposes to pert all WORK for the couslruc0on of Pickering SquarePerking Gamge Expanian - Prcast Concrete Package donne du ter Inn Iro n strict accmdence with the BWDMG AND CONTRACT D(RA)MENTS prepared by design terns, within the line set forth Herein for the following prices: On Site Work (Name of SubConhacar) STRESCON LIMITED Dollms$1,201 000,00 Genml Conmuction (Name ofGeneml Conhaam) TO Be NgMED LATER Dollars$ 2. NIGHT TIME CONSTRU ION/ ERIGEMON In controliance Mth MEAd f B'd BB)D R h b n WORK f the f R kin k' Ex Precas P kin d ri. hm_ ISS_ the BMDM CONTRACT MCUmllls A 9 velvaism oy oesixter ormen wittersfroth Urcmn fier the foNow On Site Work M f�rtmrct STRE 11 LMITED II 81 000 W GencalC (N f 1 M BE NAMED LITER X11 ' Insert "a coryonnon","a pmntership",or'an individual", as applicable. C. By submission of this BM, each BODER certifies, end in the car of ajoint BM each party therao certi0cs as to its own organ cation, that this BW has been astissd at mdependcntly, without M"I BID FORM 011300-1