HomeMy WebLinkAbout2002-08-12 02-311 ORDERItem No. 02-311
Date: August 12, 2002
Item/Subject Order, Authorizing Contract Award to the lane Construction Corporation
for the 2002 Street Rehabilitation and Paving Contract
Responsible Department Engineering
Commentary:
On August J, 2002, bids were receivetl for our annual Street Rehabilitation and Paving Program for the
upcoming year. The attached Omer authorizes contract award to the low bidder, Lane Construction. A
tabulation of bids Is attached.
Department Head
City Manager
Associated Information: Omer, Map
Legal
r
X Passage
_ RM Reading Page _ of
Referral
02-311
_`X;- Assigned Co Councilor Parrlugton Aagaat 12. 2002
o.�
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award to The Lane Construction Corporation
for the 2002 Street Rehabilitation and Paving Contract
By the Oly CouncA of me Csry of&ngor
ORDERED,
THAT the City Manager is hereby authorized and directed to execute a contract
with The Lane Construction Corporation in the amount of $586,541.54 far the
2002 Street Rehabilltabon and Paving Projects.
IN cin COUNCIL
Avguat 12, 2002
Motion Made 6 Seconded
for Passage
Pease1R
02-311
ORDER
Title.AUNoziziug contract Award to Use
Leve Construction Corporation for the
2002 Street Pbabilitation east Paving
Contract
Assigned to
(e� Councilor
CITY OF BANGOR
BIDTABOLATION BM Opening: noNTI02
PAVING CITY STREET -CONTRACT 2002
Page 1 &I
Lane Construction
Meriden, CT
ibgBeat
ITEM
DESCRIPTION
QTY
UNIT
UNIT
PRICE
TOTAL
PRICE
TOTAL
PRICE
1.
Bit. Concete- conventional m4
ell
TONS
28.26
235788.54
289,3]0.00
2.
Bit. Concrete - superyeve mw
8,000
TONS
28.59
159,540.00
180,000.00
3,
Cold Planning Pavement SUltace
1,000
BY
1.20
1,200.00
1,00
2,000.00
4.
Bituminous Tack
4,300
GAL
1.30
5,580.00
8,600.00
5.
In Place Reclamation
1,000
BY
1.10
1,100.00
2,(00.00
6.
UquiE Cal Chloride
1,000
GAL
1.50
1,500.00
2,000.00
T.
Adj. Of Catch Basins,Manholes
0
FA
2 .W
4,690.00
10'aarl
e.
Bt. Marking(A7mwns&WOMs"ONLY)
700
SF
500
3.500.00
3,500.00
9.
SL Marking 4" White &Yellow Lines)
900
LF
0.65
585.00
2,700.00
10.
St. Marking (Shop Bars&Crosswalks
11500
SF
375
5.62500
3,000.00
PARKING LOTS
418,428.54
483,1]0.00
11.
Bit. Concrete- Conventional Mb
3,572
TON B
3400
121.44800
3000
107,160W
12.
Bituminous Tack
1.300
GAL
130
1,690.00
200
2,W000
SIDEWALKS
123,138.00
109,TW.W
13.
Bituminous Concrete -Conventional
i 985TONS
45.00
44.32500
30.00
29,550.00
14
Bituminous Tack
WO
GAL
1.30
650.00
2.00
1,00000
48975.00
30,550.00
TOTALAMOUNTBID:
$586,541.54
$
623.480.00
Page 1 &I