HomeMy WebLinkAbout2002-06-24 02-261 ORDERItem No. 02-261
Date: June 24, 2002
Item/Subject Order, Authorizing Execution of Contract with CH2M-Rill for Engineering
Services for the Emeri Generator Project at the Wastewater
Treatment Plant
Responsible Department: Engineering
This project will provide emergenry back-up power to operate the treatment plant in th event of a power
(allure. Additionally, the generators may he operated dunng periods of high demand, proviiding road savings
in the purchase of electricity. CH2M-Hill designed the treatment plant and has provided additional services
W the qty over the past decade. Engineering and Treatment Plant Staff recommend approval.
Depadment H
Manager's Comments:
City Manager
Associated Information: Council Order, Outline Scope of Services, Proposed Fees
Finance Director
Obk Solichor
Irjtytlbcedfor
3 Passage
_ First Reading Page_ of _
Referral
OL -261
a ^i. AssignW to Councilor 4mble June 26, 2002
ffii CITY OF BANGOR
(TITLE.) Order, Authorizing Execution of Contract with CH2M-Hill for Engineering
Services for the Emergency Generator Project at the Wastewater
Treatment Plant
By Me 01y Counal of Me Oty of8xgor
ORDERED,
WHEREAS, the City of Bangor Issued a Request for Qualifications for Engineering
Services for the Emergency and Supplemental Power Generation Project at the
Bangor Wastewater Treatment Plant, and
WHEREAS, CH2M-HIII was determined to be the most qualified of the seven
responding firms, and
WHEREAS, the City Finance Committee granted permission on May 22, 2002 to
enter into negotiations with 0H214-HIII for the purpose of defining a detailed scope
of work and engineering fee for the project, and
WHEREAS, CH2M-HIII has met with City Staff to discuss the project and has
submitted the detailed scope of work and engineering fee, and
WHEREAS, Staff concurs with the scope of work and proposed fee, now
THEREFORE, Be it ordered by the City Council of the City of Bangor, that tate City
Manager is hereby authorized and directed, on behalf of the City of Bangor, to
execute a contract for Engineering Services for the Emergency Generator at the
Wastewater Treatment Plant with CH211-XIII.
M CITY COMM
Scow 24, 2002
Passed
p 02-261
n R D a n
(TITLE,) Authorizing EaecuCion Of
Contractt 9i11 for Eogiveeilag
Couvices for the Emergency Generator
Pleni
P lgneclW Councilor A AY.
02-261
June 17,2002
Mr. john Murphy, P.E.
Assistant City Engineer
City of Bangor
n Harlow Street
Bangor,ME 04401
Subject Proposed Scope of Services and Compeaation For Emergenryand Eapplemmfal
Power Upgrades at Bangor WRAF
MW
'me attached is ourproposed Scope of Services (Atiuhmenfa A) and Compensation
(Anactament B) for the Emergency and Supplemmtal Power Upgrades Project. We are
looking forward to working with the City of Bangor on flus project and in helping the
Bangor WPAF staff to reduce energy costs all provide added Be bilitywiM the electrical
system We have included within the scope of services our understanding of the work to be
mmple of that is defined at this time. The scope of services was based in part on the May
211t, M02maetmg at do WPAF a'the Woodall & Cannot report entitled "Wastewater
Treatment Facility Power Supply Options", dated March 2002
We have numbered the scope items and broken deem down on a task by tusk basis as
follows: Technical Memorandum/Prelimhary Design, Permitting, Final Design, Bidding
Assistance and Services During Construction (Field Inspection, Office Services, PI.0
Programming and Startup).
Tho following is abrief summary of do scope for the project
Emergency and Supplemental Power upgrades
Task 1- Technical Memorandum/ Preliminary Design
We will prepare a technical memomndvm on the alteratives discussed at tine May 21+
meeting earl provide our recoraunmdations based on a workshop anbe held to discuss the
issues. We will then prepare a preliminary design notebook for dee project to further
develop the building layout, electrical modifications and functions. An engineers estimate
of probable conshachon cost will be prepared.
Task2—Permitting
We wit, work with fla Maine Deportment of Envirmwental Protectimn (MEDFP) fora Minor
Source MEDEP Air Emission Uum ee and a Building Permit as well as any additional
penums; required for siring fhe facility. Due to the urnkmwn nature of (he level of effort for
His task we have provided costs on a time and materials basis with a cost not w exceed
without written audnmriaation by doe Cry of Bangor. We will work with fie City
Up .<r,<
CF12lUlHILL
June 17,2002
Mr. john Murphy, P.E.
Assistant City Engineer
City of Bangor
n Harlow Street
Bangor,ME 04401
Subject Proposed Scope of Services and Compeaation For Emergenryand Eapplemmfal
Power Upgrades at Bangor WRAF
MW
'me attached is ourproposed Scope of Services (Atiuhmenfa A) and Compensation
(Anactament B) for the Emergency and Supplemmtal Power Upgrades Project. We are
looking forward to working with the City of Bangor on flus project and in helping the
Bangor WPAF staff to reduce energy costs all provide added Be bilitywiM the electrical
system We have included within the scope of services our understanding of the work to be
mmple of that is defined at this time. The scope of services was based in part on the May
211t, M02maetmg at do WPAF a'the Woodall & Cannot report entitled "Wastewater
Treatment Facility Power Supply Options", dated March 2002
We have numbered the scope items and broken deem down on a task by tusk basis as
follows: Technical Memorandum/Prelimhary Design, Permitting, Final Design, Bidding
Assistance and Services During Construction (Field Inspection, Office Services, PI.0
Programming and Startup).
Tho following is abrief summary of do scope for the project
Emergency and Supplemental Power upgrades
Task 1- Technical Memorandum/ Preliminary Design
We will prepare a technical memomndvm on the alteratives discussed at tine May 21+
meeting earl provide our recoraunmdations based on a workshop anbe held to discuss the
issues. We will then prepare a preliminary design notebook for dee project to further
develop the building layout, electrical modifications and functions. An engineers estimate
of probable conshachon cost will be prepared.
Task2—Permitting
We wit, work with fla Maine Deportment of Envirmwental Protectimn (MEDFP) fora Minor
Source MEDEP Air Emission Uum ee and a Building Permit as well as any additional
penums; required for siring fhe facility. Due to the urnkmwn nature of (he level of effort for
His task we have provided costs on a time and materials basis with a cost not w exceed
without written audnmriaation by doe Cry of Bangor. We will work with fie City
02-261
ntininiize Mepermitdng efforts bycommvrdcntmg wiM Me City and agreeing on a cmvse
of actionprior to discuasionswiM regulators
Task3—Piral Design
Once we base come to agrammt on the aspects of des new faatities we will prepare contract
documents for the design of ties upgrades based on the prelvainn y design report dewsloped
in Task 1. We base prepared our level of effort based on the assumption find the nese, fac ibex
will include both rngeneation and emergency power equipment. Shoold Mem be a
rcducriw in Me complwty of the project due to not moving forward with Me co -generation
portions of Me work we will duce our level of effort accordingly and revise the scope and
mvgpaysation appropriately. We have prepared our scope based on Me assumption of the
following upgrades:*
(1) New Switchgear and Power Generation and Emergency Generator Sets
• New power generation equipment anal emergency generator equipment to be housed to
a building at the Iucation of the faurib (4e) primary clarifier.
• Relocate ducMads, storm drains and niter utilities to provide a location for new
building.
(2) SCADASystem Upgrades
• The mstnwentetlon and control system will rodents a generator uanufacMre: control
panelwiMPLC. PLC willbespedfiedMwmmurdmtewweds gplant PLCsystem
The fwsc [obe Me mad will land co tod pa source, standby source rap power
generationecreurce. The maundering and motel paameters will inclvdeagraplllwl
interface scream,
• Network interface will include the of power geneation system
monitoring to the existing plant PLC.
(3) Electrical
• ElectriWdesignwillincludemordinadmn ffiutilftyfory tymeteringprotective
relaying requiconimrb, ate rate structure for the extended operation (longer Man 15
second.)oftllegenerat coMectedto Mtut tysystem. GenerdtorsystemwAnotbe
designed for exporting power to the utility.
• Design ofcormecem of new generrads) to existing plant electiW system
(4) Ardutectwal
• The newpowergenerationbuiNing will be designed to meet ADA standards andblend
the new building rate On project site. Operation and mamannince functions will be
designed into Me azcltitectmal design.
(5) Structural
W-261
• Structural nt as applicable. provisions forfoundatiora, suppotslabs and fuel oil
containment as applicable.
Task4Bidding Assistance
We will provide bidding asastsnce to the WPAP for the project. The activities we will
perform include attending a pre-bid conference, preparation of addenda, answering bidder
questions, attendance at the bid opening and evaluation of bids as well as providing a
written recommandxtim of award.
Tasks Services During Construction (Pietd, Office Services, Software Development
Startup)
We will provide care (1) part-time resident engineer to observe the work of the Contractor
and nuke reasonable efforts to maintain conformance of the Contractor's work with the
intent of the Contract docomennb. The resident engi>wa will provide part-time assistance
for two days per mond+ for nine mondis from Marcia 2003 tiuough November=i. We will
assist the City during the co struchm of the project by providing the following services,
attend a precoratructim conference, review of shop drawings, issue rla^Bratioa, prepare
change orders B necessary, provide software programming services, startup assistance,
operator training aM providing a new chapter in the O&M vanuaL Due to the women
nature of the wok we remnwmd that the software services be completed an a time and
materials basis with a cast rout to exceed without written authorirai ion by the City of
Banger. Since eofhvare services willbeprefory dduringcrostructim share willbeample
Wpmbmityto betterdefine the xope and levelof effort attiat tics.
Pl callmeat(617)-5232260,exh2%ffyou avemyquestimsorffyoursdadd£tioat
nfomation-
Sincerely,
CNZMAIILL v
fulae�ellWilson, P.E. i-rL
Project Manager
BOS\bgrscapebrQ3
c Peryvm L I$L
GaryWeil/C/CfUbA EBLL
Richard Bedard/d/c1f2iV1 PIILL
John D. Bmwaq
Vice President
Attachment B
Compensation
Emergency and Supplemental Power Upgrades Project
Compensation On A Lump Sum Basislll
For Design, Bidding, Pemutting and Constmcuon Phase Services ss described m Anselment
A, the City of Bangor shall pay the Engineer the following lump sum amounts:
Task Dessemid n
Lumu Sum Amoun[
Task is Technical MemoranduMPredesign
$55,000
Task 2: Pemuttingin
$ Cost Reimbursable
$SM
Basis
Task 3: Final Design
$9TH
Task 4: Bidding Assistance
$5,000
Task 5.1: SDC—Field Staff
$15,000
Task5.2: SDC—Office Staff
$15000
Task 5.3: SDC— Software Developmen[rll
$ Cm[ Reimbursable
Basis
Task 5.4: SDC -Startup Assistance
$16000
Task 6: Additional Servkest
$0
Tod of Lump Sum Amounts
$ 203,000
'PmwtMg ud Softwve Ilevelcpusnt Services are tlidscaa b gimnity aM Nerefre we recaweM od arse
cemces be bald baW m Nc rebid levels cfeRorc Ineel on Ne atuchal mis schalWe. bnimaA ones of its,
Pemdmng nM Soflwue Swices are $2Q000 aM UO." 11ree wasn will net Ee auWM willwa[ i nir
wnuen a W swivtioo form au CiN of Bengm.
'AdEiao,ul Swim arc not imlu in on urn estime,e. Awbzvation to pres=J is falwsel for say a itimul
xnuus and wi0 be in deform of a Agcewnl Amoitlmmt spaifying On, x of work ro be pafa,med and de
bntls of payor¢ and wmpewaaon
Engineemag Services Per Diem Rates
ency and Supplenmuml Fewer Upgrades Prugeet
SeoiaMe 'S 1M
$139M
etirP t
1 $125M
'ect
$SM
Suff9g
$7544i