HomeMy WebLinkAbout2001-11-14 02-12 ORDERItem No. aI-»
Date:
Item/Subject: Granting Utility Location Permit to Bangor Water District -Union
Street and 18" Street.
Responsible Department: Engineering
The attached Order is a routine action granting a utility location permit to Bangor Water
District for the purpose of installing and maintaining the following water pipes and water utility
facilities under and along 18" Street with the extension of 160' of 6" main pipe that will tie In the
dead end main on 18"' Street with the main on Union Street.
Approval Is recommended. Copy of the permit application Is attached.
PUBLIC NOTICE HAS NOT BEEN SUBMITTED BY PUBLICATION.
Department ad
Manager's Comments:
City Manages
Associaterl Information: I
Finance
ty Solicitor
Intrpfor
Passage
_ First Reading Page _ of _
Referral
4O'ea A iavndtoC mcilor xoL Mov er 16, 2001
CITY OF BANGOR
(TITLE.) ®rbtr,
Granting Utility Location Permit to Bangor Water District -
Union Street and 1B'^ Street
BYtheWCounts10 the CRYM,sanga:
ORDERED, T T
the attached utility location permit is hereby granted to Bangor
Water District for the purpose of installing and maintaining the following water pipes
and water utility facilities, provided that all work is tion in accordance with applicable
City Codes and ordinances and any additional requirements of the City Engineer.
NOTE: Following is the public street referred to:
Extension of 160' of 6" main pipe that will be in the dead end main
on Ir Street with the main on Union Street.
PUBLIC NOTICE HAS NOT BEEN SUBMITTED By PUBLICATION.
IN CITY COUNCIL
November 16, 2001
Passed
�'I C
02-12
ORDER
TItle,Granting Utility Location Permit
to Bangor Nater District - Darius street
and 18th street
Assigned to
arCouncilor
ry,�y�/
7/06
B2-12
LOCATION PERMIT APPLICATION
FOR WATER FACILITIES
CONSTRUCTEDIN PUBLIC WAYS
In accordance with Chapter 294 of the 1983 Public Laws of the State of Maine, the Bangor Water
Derides hereby makes written application to the City M Bangor for a location permit to construct and lay the
following water pipes and water utility facilities:
Union Street
The District would request the instillation of approidmately 188' of 8' main. This project will tie in the dead and
main an 18th Street with the main on Union Street This project would pmmde for better quality in that area by
extending the dead and main
apreJ alae ering ML> a
This aphes pinkenion ha#/been published In the Bangor Dalry News on
No objection to the application having been made by this application Is granted
Time. Dale and Place of Hearing, if required:
In City Council Data:
Passed
A True Copy Attest
BangnrcityClea
Recorded in the records of Bangor ME, Book page
-
Aging
Clark
nBc+n,�glly ice- ,
���
02-12