HomeMy WebLinkAbout2003-09-08 03-290 ORDERItem No. 03-290
Date: September 8, 2003
Item/Subject Order,Authodzing ContractAward for Construction of De -Icing Fluid Collection
System at Bangor International Airport, MP No. 3 -23 -0005 -TBD
Responsible Deparbnent Engineering
On September 3, 2003, bids were received to Construct a De -tang Fluid Collection System at Bangor
International Airport. This project isolates a portion of the aircraft parking ramp on the dWllan side of the
airport for de -king aircraft during the winner months. The de-icing fluid will be collected and piped into the
OtNs sanaary sewer system for treatment at the wastewater treatment dant. The project Includes a 5000 -
gallon storage tank, an oil -water separator, a pow measuring device, valves to control the Bow and all other
incidental work as described in the plans and speafcadons.
Department Head
M3nagees CemmeMe• A
City Manager
Associated Information: Order
Findn<¢ Di2ROr
Legal Approval:
Hity Solic¢or
b Passage
_ First Reading Page _ of
Referral
Assiitod to Councilor Treoble Septeohex 8, 2003
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award for Construction of De -Icing Fluid
Collection System at Bangor International Airport, All? No. 3 -23-
0005 -TBD
By Bre Gly Coonol of Me Ory of Bangor
OROERED,
THAT, the City Manager is hereby authorized and directed to execute a contract
with Lane Construction in the amount of $284,340 to Construct the Decking Fluid
Collection System at Bangor Intemational Airport, AIP No. 3 -23 -0005 -TBD.
m CCR COUNCIL
Sep[eaber 8, 2003
Marian bade Abad Secwded
for Passage
Passed
I
p 0}290
(TITLE,) 9arborfzfag CaaCLxC dears far
cooscracc as of M-1clug Fluld CollectUmn
Syeren at Bangor IOC¢rvaCloaalEAi)<poc[.
Asslonstl to Councilor '
CITY OF BANGOR DRUM3
BIE Openin
BID TABULATION 9t
DE-ICING FLUID COLLECTIONS SYSTEM
Bwacr, MEuction Corp
Bangac ME
t&sa 1
3ergen ga^
Rem[tlen, ME
H.E. Sargent
SGIMatep ME
UNIT
TOTAL
UNIT
TOTPL
UNIT
TOTPL
DESCRIPTION
OTY
UNIT
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
ITEM
1
Ls
za 000.00
z4,aW.W
u.oWoS '.
16aW.W
4z.as].W
42a9>_oB
T
E (nears FiMe amce
300
m,aW.00
ago
26 aoo.W
z.
Pavemem Mink
B66g
sv
4.00
zT.zW.g6
000000
2s0
zuso 00
3.
sawom Con4d Jolnl
8'i00
LF
300
zss00.0o
200
90.00
52.200.00
a,
fO:Ouctile lmn Pl
580
LF
5803
33.81000
120 c0
89.80003
4.000 CO
6000 C0
5.
a'Diameler Manllok
1
Ls
a0.'O00
4,OW.W
5W0.03
BOW.00
500003
B.OW.00
BWOW
B,W000
fi.
Pre Ca¢I Comrela Diverelon Slrucwre
1
L3
8.000.00
B.tt000
1000000
12.OW.00
12.000.00
].
qI WeM Se eraln
1
Ls
8.00000
8000.00
10.000.00
5000 E0
•00000
•00000
S.
I'Dlamster ManM1de
1
L3
Lc00 c0
4.000.00
5,00000
12000CU
12.00003
13000.CU
13.000 C0
9.
SOOe Gallon 8lwa ¢Tank
1
Ls
1a,0.ro.eD
14.000 CO
4CCG.03
SOD3.W
5.0[0.00
I,000.W
6000.03
f0.
a'Oiemeler ManM1ok
1
L3
a.oD3.00
1200000
12003.00
12.000.00
12.00000
10.50000
10.SW.00
1L
Flow Meewrm �vka
1
LS
L$
8.00000
6080.00
8.00000
BOOO CO
12.000.00
12.00000
12
Fwr d Contod Velve¢
1
16400.00
25.c0
10,250.00
2000
8,20080
13.
Remove Exi¢lio PCC Pavement
410
SY
d0. L0
1200
2.d00.O0
50.0
tO f00.W
id.
Subbase Crone
203
CY
22.00
AAM
7600.00
2800
5500.00
W00
120W 03
15.
CnBME ream Bade Course
200
CY
3800
1800
9T 36080
458s
83083.00
16.
EUM nous Cmcrem Pevemom
1820
TONS
IC50
W.08OW
900
1mAA)0
800
1680 C0
1T.
R& ,,ous Pima Coel
210
GAL
800
1680.00
4A
4,320.03
600
364003
18,
611umi^we Tack Cpl
9W
GAL
4
3.&000
8
IDa34000
$
209.82000
$
3a11.]50.00
TOTALAMOUNTBID: