Loading...
HomeMy WebLinkAbout2003-09-08 03-290 ORDERItem No. 03-290 Date: September 8, 2003 Item/Subject Order,Authodzing ContractAward for Construction of De -Icing Fluid Collection System at Bangor International Airport, MP No. 3 -23 -0005 -TBD Responsible Deparbnent Engineering On September 3, 2003, bids were received to Construct a De -tang Fluid Collection System at Bangor International Airport. This project isolates a portion of the aircraft parking ramp on the dWllan side of the airport for de -king aircraft during the winner months. The de-icing fluid will be collected and piped into the OtNs sanaary sewer system for treatment at the wastewater treatment dant. The project Includes a 5000 - gallon storage tank, an oil -water separator, a pow measuring device, valves to control the Bow and all other incidental work as described in the plans and speafcadons. Department Head M3nagees CemmeMe• A City Manager Associated Information: Order Findn<¢ Di2ROr Legal Approval: Hity Solic¢or b Passage _ First Reading Page _ of Referral Assiitod to Councilor Treoble Septeohex 8, 2003 CITY OF BANGOR (TITLE.) Order, Authorizing Contract Award for Construction of De -Icing Fluid Collection System at Bangor International Airport, All? No. 3 -23- 0005 -TBD By Bre Gly Coonol of Me Ory of Bangor OROERED, THAT, the City Manager is hereby authorized and directed to execute a contract with Lane Construction in the amount of $284,340 to Construct the Decking Fluid Collection System at Bangor Intemational Airport, AIP No. 3 -23 -0005 -TBD. m CCR COUNCIL Sep[eaber 8, 2003 Marian bade Abad Secwded for Passage Passed I p 0}290 (TITLE,) 9arborfzfag CaaCLxC dears far cooscracc as of M-1clug Fluld CollectUmn Syeren at Bangor IOC¢rvaCloaalEAi)<poc[. Asslonstl to Councilor ' CITY OF BANGOR DRUM3 BIE Openin BID TABULATION 9t DE-ICING FLUID COLLECTIONS SYSTEM Bwacr, MEuction Corp Bangac ME t&sa 1 3ergen ga^ Rem[tlen, ME H.E. Sargent SGIMatep ME UNIT TOTAL UNIT TOTPL UNIT TOTPL DESCRIPTION OTY UNIT PRICE PRICE PRICE PRICE PRICE PRICE ITEM 1 Ls za 000.00 z4,aW.W u.oWoS '. 16aW.W 4z.as].W 42a9>_oB T E (nears FiMe amce 300 m,aW.00 ago 26 aoo.W z. Pavemem Mink B66g sv 4.00 zT.zW.g6 000000 2s0 zuso 00 3. sawom Con4d Jolnl 8'i00 LF 300 zss00.0o 200 90.00 52.200.00 a, fO:Ouctile lmn Pl 580 LF 5803 33.81000 120 c0 89.80003 4.000 CO 6000 C0 5. a'Diameler Manllok 1 Ls a0.'O00 4,OW.W 5W0.03 BOW.00 500003 B.OW.00 BWOW B,W000 fi. Pre Ca¢I Comrela Diverelon Slrucwre 1 L3 8.000.00 B.tt000 1000000 12.OW.00 12.000.00 ]. qI WeM Se eraln 1 Ls 8.00000 8000.00 10.000.00 5000 E0 •00000 •00000 S. I'Dlamster ManM1de 1 L3 Lc00 c0 4.000.00 5,00000 12000CU 12.00003 13000.CU 13.000 C0 9. SOOe Gallon 8lwa ¢Tank 1 Ls 1a,0.ro.eD 14.000 CO 4CCG.03 SOD3.W 5.0[0.00 I,000.W 6000.03 f0. a'Oiemeler ManM1ok 1 L3 a.oD3.00 1200000 12003.00 12.000.00 12.00000 10.50000 10.SW.00 1L Flow Meewrm �vka 1 LS L$ 8.00000 6080.00 8.00000 BOOO CO 12.000.00 12.00000 12 Fwr d Contod Velve¢ 1 16400.00 25.c0 10,250.00 2000 8,20080 13. Remove Exi¢lio PCC Pavement 410 SY d0. L0 1200 2.d00.O0 50.0 tO f00.W id. Subbase Crone 203 CY 22.00 AAM 7600.00 2800 5500.00 W00 120W 03 15. CnBME ream Bade Course 200 CY 3800 1800 9T 36080 458s 83083.00 16. EUM nous Cmcrem Pevemom 1820 TONS IC50 W.08OW 900 1mAA)0 800 1680 C0 1T. R& ,,ous Pima Coel 210 GAL 800 1680.00 4A 4,320.03 600 364003 18, 611umi^we Tack Cpl 9W GAL 4 3.&000 8 IDa34000 $ 209.82000 $ 3a11.]50.00 TOTALAMOUNTBID: Pape 1011