Loading...
HomeMy WebLinkAbout2003-08-25 03-281 ORDERItem No. maxi Date: August 25, 2003 Item/Subject order, Authorizing Contras Award to the lane Construction Corporation for the 2003 City of Bangor Paving Program Responsible Departmem: Engineering On August 13, 2003, bids were received for our annual Paving Program for the upcoming year. The attached Order authorizes contract award to the low bidder, Wne Construction. A tabulation of rids is attached. Department Recommend approval. `'�(// 44V' City Manager Associated Information: Order, Bid Tab —Y Finance Director liLy Solicitor Introduced for _X Passage Pbat Reading Page _ of _ Referral 03-281 Assigned to fo,mcilor Parvio too August 25, 2003 CITY OF BANGOR (TITLE.) Order, Authorizing Contract Award to The Lane Construction Corporation for the 2003 City of Bangor Paving Program By the City Comrcil of the Ofy of Bangor: ORDERED, THAT Bre City Manager is hereby authorized and directed to execute a contract with The Lane Consbuctlon Corporation in the amount of $517,826.81 for the 2003 City of Bangor Paving Program. IP CM 0009Cf1. August 25, 2003 Passed C p 03-281 0 RDEH (TITLE,) Auunorfziag tonere c Avera ro xAe Lme Cwe m r;ra 3 City of Hmgar Paving Program AssignedloCaunellow CITY OF BANGOR BIDTABULATION Bid Opening: 08I13M3 PAVING CITY STREETS 200.1 Page 1 of 1 Lane Cons0ucton Menden, CT Vaughn Thi0n4eau&Son Bangor, ME ITEM DESCRIPTION OTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1. - Bit. Concrete-convemicnal mix 0,000 TONS 26.25 210,000.00 31.50 252,000.00 2. Bit Concrete - superpdve mix 8,489 TONS 20.54 225,29806 31.50 2574W,50 3, Cold Planning Pavement Surface 19,313 6Y 1.25 24,141.25 2.00 38,626.00 4. Bituminous Tack 4,300 GAL 1.60 6,880.00 2.50 10,750.00 5. In Place Rttlamation 1,088 BY 1.25 2,332.50 095 1,7R.70 0. Liquid Calcuim CM1lCntle 1,90o GAL 1.10 2,09000 0.97 1,843.00 7. AOj. Cf Catch Basins Manholes 20 EA 350.00 7,00000 35000 7,000.00 8. St. Melkeg(Arrowns&VgorOs"ONLY) 500 SF 375 1,87500 5.00 2,500.00 9. St. Mai Mite &Yellow Lines) 700 LF 0.55 385.00 2.00 1400.00 10. St Mailang (Stop Bars&Crosswalks 1,100 SF 1.75 1,925.00 4.00 4,400.00 PARKING LOTS 481,92691 587,696.20 11, Sit Concrete- Conventional Mix 975 TONS 36.00 36100.00 45.00 43,875.00 12. BBuminous Tack 500 GAL 160 80000 300 1,500.00 SIDEWALKS 35,900.00 45,375.00 TOTALAMOUNTSIO: 9517,82891 5 633,070.20 Page 1 of 1