HomeMy WebLinkAbout2003-06-23 03-212 ORDERIcem No. 03-212
Date: lune 23, 2003
Item/Subject Order, Granting Utility Location Permit to Bangor Gas Company for
Various Locations in the City
Responsible Department: Engineering
Commentary:
Bangor Gas Company has submitted an Application and Location Plans far installation of gas distribution lines
in me following streets: Main Street standing 300'souMwest of Dutton Street 1130 linear feet to Farm Road,
Farm Road from Main Street 1346 linear feet to Perry Road, Perry Road from Farm Road 680 linear feet to
Godsce Road, Godsoe Road from Perry Road 1785 linear feet to Crosby Street, Crosby Sheet from Godsoe
Road 800 linear feet to entrance to Unifir;:. Approval of the Utility Location Permit is subject to further
review by Engineering prior to issuance of Street Opening Permits from the Engineering Department for
construction.
NOTE: No separate public notice of this application is to he made.
Associated Information: Order, Location permit Application
Department Head
Finance Director
Cm Solicimr
Introduced for CtAa&t-
%�Paaage
_ First Reading Page _ of
Referral
03-212
_ Assigned to Councilor Rolmev .Tuve 23. 2003
Iw
CITY OF BANGOR
(TITLE.) Order, Granting Utility Location Permit to Bangor Gas Company for
Various Locations in the City
By Me my Counal ofthe Oty of Bangor.
THAT, the CM grant permission to Bangor Gas Company to place and maintain
buried pipes, valves, caps, valve boxes, manholes, tracer wires, warning tapes,
other fixtures in, along, under, and across work to be done on Main Street starting
300' southwest of Dutton Street to Farm Road, farm Road from Main Street to
Perry Road, Perry Road from Famn Road to Godsoe Road, Godsce Road from Perry
Road to Crosby Street, Crosby Street from Godsce Road 0 entrance to Unlfirst
BE IT FURTHER ORDERED, THAT this Utility Location Permit be in a form
acceptable to the City Solicitor, and that all work be done In aohorciance with the
City's Street Opening Regulations and other requirements of the City Engineer.
IN CITY COUNCIL
Jaae 23. 2003
Passed
CI
# 03-212
ORDER
(TITLE) maati N mluty Location Permit
to Manor caw, co.Paair for arw" eatroaa
is the City
Aeelgnal to Councilor /41
03-212
LOCATION PERNIIT APPLICATION
FOR
BURIED NATURAL GAS PIPELINE
To the Bangor City Council
Bangor Gas Company, LLC respectively requests permission to place and maintain
buried pipes, valves,caps, valve boxes, manholes, tracer wires, warning tapes other
fiMures in, along, under rail across portions of the surface of the public streets and
highways as further described in lire attached table titled "Location Permit Request".
The above ref d pipes and other fixtures will be placed in accordance with the
enclosed plan sheets. The plans are preparc-0 on Base Maps generated from action
pbotogrephy. Theaerialphomgmphywmta enon November18,1998.
10 cojunction with this location application, Bangor Gas Company, LLC also requests
permissionto place and maintain thepreviously described pipes and other fixtures in,
along, under and across clue above intersecfiug public ways for the purpose of maldng
connections with such other portions of the medal gas distribution system and buildings
as maybe deshed for the purpose of distributing natural gas.
Respectively submitted by
Bangor Gras Company, LLC
003
7mtw�y2
Logy// on Pent it Approval
Daze:
9J9a5Ho B,W..M oe 04,02-0940 mr1911-9595 rm'.12J719420101
F ~vg5fd�, 21 Mein Sear bmOm, Naim0d101
0�212
LOCATION PERMIT REQUEST
FOR THE
INSTALLATION OF NATURAL GAS DISTRUBUION MAINS
WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OF THE
CITY OF BANGOR
As an integal part of the development of the cannot gas distribution system for
the City ofBangm, Bangor One proposes W instal polyethylene natural gas
system piping within the road atM street fight -of -ways according to the table
included below. The pipe material will be PS 2406, medium density polyethylene
gas pipe. The pipe color will be yellow, in compliance with the rtanonal color
code nmdards for entities. The pipe will be installed by trenchless and/or
conventional open -out ditch methods as best suit each location. All gas mains
will be installed at a mininum depth of once feet bellow the finished surface
grade. Refer to too anached plans for details of the proposed construction,
Proposed Location Summary Table
Location
From
To
Linear
Feet
Main St.
Starting
300' SW of
Farm Rd.
1130
Dutton St.
Farm Rd.
Main St
Perry Rd.
1346
Perry Rd.
Farm Rd.
Godson Rd.
680
Godsoe Rd.
Perry Rd.
Crosby SL
1785
Crosby St.
Godsoe Rd.
Entrance to
UniFirst
800