Item/Subject Order, Authorizing Contract Award to Sargent& Sargent for tae Bangor
Riverpark on the Penobscot, Railroad Street Improvements
Responsible Department: Engineering
Commentary:
On lune 4, 2003, bids were received for the Bangor Riverbank on the Penobscot, Railmad Street
Improvements Project Work under this contract web mess[ of reconstruction of approrimately 850 linear
feet of Railroad Streep including excevadon, placement of base and subbase gravel, pavement Writing, new
sidewalks, Iarnscaping, site furnishings, granite walls and Pers, 4 died vertical features, approximately 1040
linear feet of stone drain, and 9 catch basins. The project will also Include utility work consisting of
approximately 965 linear feet of concrete crossed dud tank, utility manholes, conduit, wiring, controls and
bases for ornamemal lighting, installation of light Was and fixtures furnishetl "e City,ons piping and
Flush -mounted hose blobs and all other inutlental work as desaibetl in the plans and specifications.
The attached Order authorizes contract award to the low responsive Udder, Sargent & Sargent in the amount
of $1,884,043.40.
Department Head
Comments:
Oty Manager
Asstdated Information: Order, Bid Tab
Budget Approval:
finance Director
Oty 5olicrtor
% Passage
_ First Reading Page _of
Referral
smunITPLE COPY
03-208
AS MaWO®
b • CITY OF BANGOR
(TITLE) Order, Authorizing Contract Award to Sargent A Sargent for the Bangor
Riverpark on the Penobscot, Railroad Street Improvements
By the Oty Coundl of the Ltiryofbangor..
THAT, the City Manager Is hereby authorized and directed to execute a contract
with Sargent B Sargent in the amount of $1,884,043.40 for the Bangor Riverpark
on the Penobscot, Railroad Street Improvements, subject to Coundl appropriation
of the necessary funds to match a grant from the Economic Development
Adminlstration to undertake this project.
S STI= COPY
01208
0S 0}Oi90BD
SUBSTIME W"
03-208
AS AI¢I9E0
COUNCIL
Item No. 03-208
Date: Juneg,2003
Item/Subject Order, Authorizing Contract Award for the Bangor Riverpark on the Penobscot
Railroad Street Improvements
Responsible Department: Engineering
On June 4, 2003, bids were received for the Bangor Riverpark on the Penobscot, Railroad Street
Improvements Project Work under this contract will consist of reconstruction of approximately 850 linear
feet of Railroad Street, including excavation, placement of base and subbase gravel, pavement, wrbing, new
sidewalks, landscaping, side furnishings, granite walls and pias, 4 steal vertical features, approbm itety 1040
linear feet of storm drain, and 9 catch basins. The project will also Include utlliry, wort consisting of
approximately 965 linear feet of concrete encased duct bank, utility manholes, conduit whin, controls and
bases far ornamental lighting, installation of light poles and futures furnished by the City, on-site piping and
flush -mounted hose bibbs and all other incidental work as described in the plans and specifations.
Staff Is currently in the process of reviewing the Nos that were received, and we hope to have a
recommendation ready for Monday evening. We would like m move this project forward in order to allow
IN schedule to accommodate both the National Folk Festival and our construction season.
Department Head
Manager's Comments:
City Manager
I i0=iF- Vzln
/0l104
Finance Direaror
Legal Approval:
City Solicitor
Introduced for
�r Passage
_ First Reading Page _ of
Referral
03-206
Assigned to Council r Greece June 9. 2003
Pn°°j r°un
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award for the Bangor Riverpark on the
Penobscot, Railroad Street Improvements
By the Oty Coundl of the City of Bangor:
OROBREII,
THAT, the City Manager Is hereby authorized
the and direr $d to WaC� a contras
wiin th
the Bangor Riverpark on the penobsm4 Railroad Street Improvements.
In CIP COOPCIL
dwe 9. 2003
lbcLbn nae soa serooaea
for Pa4gone
notion n.de sod seeooaea m
Amevd by Substituxiou
natioe node end Seeooded to
Pass As Amended by
SLba t itution
passed As nmeoaea by
snbstirmt-
W MANN,
m
ORDER
(TITLE,) AuxbnritimEconnaex Awrd for the
RsoRor Rcverear cue eevobs�ot, esibroaa
Street L,pxavevev[s
Assigned ro councilor 4mw.