HomeMy WebLinkAbout2003-06-09 03-187 ORDERRem No. 03-197
Date: Juneg,2003
Item/Subject Order, nonmetal award of COMraRM the Wash System and COMM Room Project,
Bangor ReryGing Center
Responsible Department: Motor Pool/Engineering
On May 21, 2003, bids were received Nr the Wash System and Control Room Project, Bangor RerycSng Center. The
babMwasintheamountof$230,145.24. ThepmjectindWgtheinstelladoao'fa Wazh SyslmaMtl m Wion
Ma Unh Roam W W locakd at the fk:gor Re dIM Center. The work includes Wt 5 not united W de follmving
hems:
• Con4mttlon of a 47 R. by 17 R.x 12 R. high, B in. CMU wall for Oonbol Room
Electrical service for Installation M the wash system and fighting
Numbing, both above and underground for the Wash System
Gas Servide
Bid paces were slightly higher Man arRlopated; therefore, Staff explored cost reduction opp sterna s with the low
Under. On lune 3, 2003, SouMWM IndusMal Services, Ind. submitted We Wkwing rest reduction measures for the
WoSect
1. Reduce the amount demoting convene removal for senngs of$S,7%.00.
2. Reduce bile amount of slab replacement for savings of $1,032.10.
3. Change new concrete kundabon wall for savings M$1,%1.35.
4. City of Bangor W prowde I'll sump pump, SouthWind Industrial Services, Inc. to install for savings of $4,2110.00.
The WWI cast savings of the above measures Is $12,463.45.
Theatthdred Order authorizes carmact award Wthe g respal India,SouthViiM Industrial Services, Ind. in the
amount of $217,69139.
Department Head
Manager's Comments:
6N Mareger
AuotlatW IMorma[ion: Order, Ongicel Bid Tab, Cost Redudbn Letter
Budget Approval: i
Ficenddis Dlrxtw
Legal Approval:
_X Passage
_First Reatling Page_M_
RMerral
Assigned to cmmcilac Men June 9, 2003
CITY OF BANGOR
(TITLE,) Order, Authorizing Award of Contract for the Wash System and Control
Room Project, Bangor Recycling Center
By the City Council oftl dry of Bangor
ORDERED,
THAT, the City Manager is hereby authorized and directed to execute a contract
for the Wash System and Control Room Project, Bangor Recycling Center with•
SouthWlM Industrial Services, Inc. in the amount of $217,681.79.
gi:
# 03-18)
0 RD8R
QITLE,)darh;=3 Arard of Cmc t Y¢r
Che Nae olec
Hevgor Recycliv6 Cev[� ro
CITY OF BANGOR
BID TABULATION Bq Opening: 05/21/03
BUS WASH SYSTEM
PAge 1 of 1
Sou15lMOE Indusirial Sec
Banal ME 11
Sullivan & Nil
Hermon, ME
ITEM
DESCRIPTION
OTY
UNIT
UNIT TOTAL
PRICE PRICE
UNIT TOTAL
PRICE PRICE
1
Bus WashSslem
1
EA
230,145.24 230,14524
23],6]1.p0 23],6]1.00
TOTAL AMOUNT BID
1 $230,14524 11
1 $23]$]1 C0
PAge 1 of 1
JUN -03-03 TUE 03:15 PM BANGOR MOTOR POOL
" d 80tld 7004 NOIAX BOON ni
' loge 3, 2IXt3
FAX:12079410246 PAGE 1 03-197
LZ4 Z91 LOZ'HOdB Xd 90�E0 801 EO-EO-NOf
00, Ra,e
ME 4asi
' Aajlgor, tvUi 04401
goa+Mr. Dawes:
"i'✓A"Id like to of ler toe following cost saving measures for We Wash System &
�.umral Reom-Dangot Recycling Center Project.
1. Reduce rho n1lQuatOfmisting concrctc slab removal from 34 ey b 24 cy(nj
$575.00 cy - save $5,750.00
2. Routine the antonnt of slab teplacvnent from 39 ey to 29 cy@$103.21cy-
anve $1,032.10
' 3. Change new concrete foundndon wall b a concrete footing and l course of Op®
12"0MU savo$1,481.35 p0'
} 4. _ 81445.00 ./p. k32
5. C9tY of Dangor to provide Flygt sump Pump -we imall- save $1,000.00
Total Savlau$1 .45
-Todd [lardy � � _ (y' d)PI
,'$phi nPSMmabdProjcclM agv 4� 4
At, -
74
t, -ad' L226-i92-LO2
Cis d5040 ¢n mo unC