Loading...
HomeMy WebLinkAbout2003-06-09 03-187 ORDERRem No. 03-197 Date: Juneg,2003 Item/Subject Order, nonmetal award of COMraRM the Wash System and COMM Room Project, Bangor ReryGing Center Responsible Department: Motor Pool/Engineering On May 21, 2003, bids were received Nr the Wash System and Control Room Project, Bangor RerycSng Center. The babMwasintheamountof$230,145.24. ThepmjectindWgtheinstelladoao'fa Wazh SyslmaMtl m Wion Ma Unh Roam W W locakd at the fk:gor Re dIM Center. The work includes Wt 5 not united W de follmving hems: • Con4mttlon of a 47 R. by 17 R.x 12 R. high, B in. CMU wall for Oonbol Room Electrical service for Installation M the wash system and fighting Numbing, both above and underground for the Wash System Gas Servide Bid paces were slightly higher Man arRlopated; therefore, Staff explored cost reduction opp sterna s with the low Under. On lune 3, 2003, SouMWM IndusMal Services, Ind. submitted We Wkwing rest reduction measures for the WoSect 1. Reduce the amount demoting convene removal for senngs of$S,7%.00. 2. Reduce bile amount of slab replacement for savings of $1,032.10. 3. Change new concrete kundabon wall for savings M$1,%1.35. 4. City of Bangor W prowde I'll sump pump, SouthWind Industrial Services, Inc. to install for savings of $4,2110.00. The WWI cast savings of the above measures Is $12,463.45. Theatthdred Order authorizes carmact award Wthe g respal India,SouthViiM Industrial Services, Ind. in the amount of $217,69139. Department Head Manager's Comments: 6N Mareger AuotlatW IMorma[ion: Order, Ongicel Bid Tab, Cost Redudbn Letter Budget Approval: i Ficenddis Dlrxtw Legal Approval: _X Passage _First Reatling Page_M_ RMerral Assigned to cmmcilac Men June 9, 2003 CITY OF BANGOR (TITLE,) Order, Authorizing Award of Contract for the Wash System and Control Room Project, Bangor Recycling Center By the City Council oftl dry of Bangor ORDERED, THAT, the City Manager is hereby authorized and directed to execute a contract for the Wash System and Control Room Project, Bangor Recycling Center with• SouthWlM Industrial Services, Inc. in the amount of $217,681.79. gi: # 03-18) 0 RD8R QITLE,)darh;=3 Arard of Cmc t Y¢r Che Nae olec Hevgor Recycliv6 Cev[� ro CITY OF BANGOR BID TABULATION Bq Opening: 05/21/03 BUS WASH SYSTEM PAge 1 of 1 Sou15lMOE Indusirial Sec Banal ME 11 Sullivan & Nil Hermon, ME ITEM DESCRIPTION OTY UNIT UNIT TOTAL PRICE PRICE UNIT TOTAL PRICE PRICE 1 Bus WashSslem 1 EA 230,145.24 230,14524 23],6]1.p0 23],6]1.00 TOTAL AMOUNT BID 1 $230,14524 11 1 $23]$]1 C0 PAge 1 of 1 JUN -03-03 TUE 03:15 PM BANGOR MOTOR POOL " d 80tld 7004 NOIAX BOON ni ' loge 3, 2IXt3 FAX:12079410246 PAGE 1 03-197 LZ4 Z91 LOZ'HOdB Xd 90�E0 801 EO-EO-NOf 00, Ra,e ME 4asi ' Aajlgor, tvUi 04401 goa+Mr. Dawes: "i'✓A"Id like to of ler toe following cost saving measures for We Wash System & �.umral Reom-Dangot Recycling Center Project. 1. Reduce rho n1lQuatOfmisting concrctc slab removal from 34 ey b 24 cy(nj $575.00 cy - save $5,750.00 2. Routine the antonnt of slab teplacvnent from 39 ey to 29 cy@$103.21cy- anve $1,032.10 ' 3. Change new concrete foundndon wall b a concrete footing and l course of Op® 12"0MU savo$1,481.35 p0' } 4. _ 81445.00 ./p. k32 5. C9tY of Dangor to provide Flygt sump Pump -we imall- save $1,000.00 Total Savlau$1 .45 -Todd [lardy � � _ (y' d)PI ,'$phi nPSMmabdProjcclM agv 4� 4 At, - 74 t, -ad' L226-i92-LO2 Cis d5040 ¢n mo unC