Loading...
HomeMy WebLinkAbout2004-10-13 04-306 ORDERItem No. 04-306 Date: October 13, 2004 Item/Subject Order, Granting Utility Location Permit to Bangor Gas Company, LLC for Installation of Natural Gas Distribution Mains Responsible Department: Engineering Bangor Gas Company has submitted an Application and Location Plan for installation of a gas distribution line in me following street: Franklin Street from Hammond Street 400 linear feet m Franklin Street Bridge. Bangor Gas proposes to install polyethylene natural gas system piping within the road and stress rightrof- ways. The pipe material will be PE 2406, medium density polyethylene gas pipe. The pipe color will be yellow, in compliance with the national color code standards for udlides. Al gas mains will be installed at a minimum depth of three feet below the finished surface grade. Apprm'al of one Utility Location Permit is subject ro further review by Engineering prior In Issuarce of any Street Opening Permits from the Engineering Department for constmRion. NOTE: No sepamte public notice of this application is to be made. Department Hes Manager's Comments: CSL 6 - City Manager Associated Information: Order, Location Penult Applcaton Finance Director City Solicitor Introduced for _ Passage _ First Reading Page _ of Referral 04-306 asaigned to Co cilor sratvick octobet 13. 2005 CITY OF BANGOR (TITLE.) Order, Granting Utility Location Permit to Bangor Gas Company, LLC for Installation of Natural Gas Distribution Mains By the o'ty Count of the City oftiangor r•r x, THAT, the City Manager is hereby authorized to grant permission to Bangor Gas Company to place and maintain buried pipes, valves, raps, valve boxes, manholes, tracer wires, warning tapes, other fmdures In, along, undo, and across work to be done on Franklin Street from Hammond Street 400 linear feet to Franklin Street Bridge. BE IT RATTIER ORDERED, THAT this Utility location Permit be in a form acceptable to the Ory Solicitor, and that all work be done in accordance with the Otys Street Opening Regulations and other requirements or the City Engineer. ID GIII CUDHCIL October 13, 2001 Pose 04-396— ' OHDEH PLE, Granting Utility location Permit Bangr many. ion of Natural Cas Distribution Maius Assigned to Councilor f 06-306 BanproGas The Natural Choke LOCATION PERMIT APPLICATION FOR BURIED NATURAL GAS PIPELINE To the Bangor City Council: Bangor Gas Company, LLC respectively requests permission to place and nummin buried pipes, valves, raps, vilve boxes, manholes, tracer wires, woming lopes other fixtures in, along, under and across portions of the surface of the public str ns and highways as further described in the attached table tilled "Location Perudt Regnmr. The above referenced pipes and other fixtures will be placed in accordance with the enclosed plan sheets. The plans are prepared on Base Maps demanded from aerial photography. The aerial photography was token on November 18,1998. In conjunction with this location application, Bangor Gas Company, LLC also requests permission to place and maintain the previously described pipes and other fixtures in, along, under and across the above intersecting public ways for the purpose of making cormections with such other portions of the natand gas distribution system and buildings as may be desired for the purpose ofdistdbuting natal gas. Respectively submitted by: Bangor Gas Company, LLC Ztyoffango r Locebbn Permit Appmvil Dote: rom.coo-eoy", moire-04102-osao.Ps t2n911 wso.roc1207194aam w�mhf u, 21rmmmm-ssw.na��. oewt 14IM1111 LOCATION PERMIT REQUEST FOR THE INSTALLATION OF NATURAL GAS DISTRUBUION MAINS WITHIN THE ROAD AND STREET RIGHT-OF-WAYS OF THE CITYOFBANGOR Asan integral pan of the development of the natural gas distribution system for the City of Brogan, Bangor Gas proposes to install polyeWylene natural ges system piping within the road and street right-of-ways according to the table included below. The pipe material will be PE 2406, medium density polyethylene gacpipe. The pipe calor will be yellow, in compliancewith the national color codestandardsforutilities. Thepipewillbeinstalledbytrenchleuand/or conventioml open -cut ditch methods as but suit each location. All gas myna will be installed at a minimum depth of three feet bellow the finished surface grade. Refr to the attached plansfor details of the proposed construction. Proposed Location Summary Table Location From To Lioear Feet Franklin Street Hammond Street Franklin Street Bridge 400