HomeMy WebLinkAbout2004-10-13 04-305 ORDER�i
Item/Subject Order,
Responsible DeparbnenC
Item No. 04-3n5
Date: October 13, 2004
Gmining Utility IgcaOon PemOtto Bangor Hydro Electric Company
for Underground Electrical Service- Sylvan Road
Engineering
Bangor Hydro EleRric Company has submitted an Hpplicxton and Lowman Plan for instillation of an
underground electrical service on the Sylvan Road beginning at ability pole 4 Vz to be located on Ore northerly
side approximately 735 feet westerly of Me junction of Hogan Road and running northerly. The cable will
be buried in 4" rigid oanduit, aroused In 6" of concrete, covered wiM safety tape, and burled to a minimum
depth of 30".
All work is to be done in accordance with applicable dry code, ordinanws, and any additional requirements
of Me Qty Engineer.
NOTE: No separate public notice of Mis application is ro be made.
Associated Information: Order, Utility Location Permit
Hnance Director
Cry Solicitor
Introduced for
Zc Passage
_ Plrst Reading Page _ of
Referral
06-305
F;P%"Signed to Councilor Cantwell October 13, 2006
40 CITY OF BANGOR
(TITLE.) Order, Granting Utility Location Permit M Bangor Hydro Electric Company
for Underground Electrical Service — Sylvan Road
By the qty Counal of Me Ory ofNangor.
ORDERED,
THAT the City Manager is hereby authorized to grant a Utility Location Permit to
Bangor Hydro Electric for installation of underground electrical service on Sylvan
Roatl.
All work is In be done in accordance with applicable qty codes and ordinances and
any additional requirements of the City Engineer.
SU_OI3y wumm
October U. 2006
Pas d # 06-305
TY ORDER
QT
LEgS Granting Utility Location Permit
Braa y r y
Urdegrawd ElectricalService- Sylvan goad
WVF ��
04_305 IBANGOR043320
PLANB 0433208C
UTILITY LOCATION PERMIT
Upon the application of BANGOR HYDRO -ELECTRIC COMPANY dated September 30. 2004,
requesting permission m locate terrain of its facilities hereirmHer described upon, along, over and across
certain pubfic ways in the Cry of BANGOR, County of Penobscot, State of Maine, all as set forth in its
application, no newspaper publication having been made by applicant in connection with said application.
permission is hereby given to said Bangor Hydro -Electric Company to locate, construct, maintain and
operate caters of its facilities hereinafter described upon, along over and across certain public ways
situated m said mrmicipditym hereinafter wt forth. TLispermit is granted subject to the provisions that
my person, fain or corporation owning Property within the subject municipality which abuts the
applicable way may file written objection with Nis licensing authority within ninety (90) days after the
installation of the facilities described in said application, said written objection and to be served by
delivery in hind or by registered or certified mail.
LOCATION:
SYLVAN ED, beginning a utility pole 412 to be located on the northerly, side, approximately 735 feet
westerly oflhejmetion of HOG" RD, thence noting northerly from limits of saide road - cable buried
m 4"rigid conddS encased in 6" of estimate, covered with safety tape, and buried to a minimum depthof
30".
DESCRE TION:
The facilities will consist ofaline composed ofwves and (or) cables, hereinafter described, upon,
along, over, across and under cera inpublic ways situated in Ne municipality herinbefore referred to and
dee right to place and maiNain underground lalads, conduits, manholes, handholds, cable and wires in,
along, under and across the above or imemecting pubfic ways for the purpose of making connections with
such poles and buildings as it may desire for distributing purposes together with associated appmteaances.
The wires and (or) cables will he buried within the limits of the public way, but outside the pan thereof
customarily used for travel by vehicles. The initial operations of the facilites wil I he at 120\200 voles,
Three Phare; the voltage will be increased as assassins therefore requires for the operation not in excess of
20KV to ground.
Authorizing signature (s):
Received and Recorded in
Book Page Dated at ,ME,
on 20_ ThisDay of ,20
Amiss:
FORM 432A -BC IBANGORN3320
PLAN# 04332OBC
APPLICATION FOR UTILITY LOCATION PERMIT
TO: BANGOR City Council—IDwa of BANGOR
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly authorized
pursuant 10 the laws ofthe Seats of Maine to generate, sell, distribute and supply electricity in the City
Of BANGOR County Of Penobscot, State aforesaid, hereby applies for a permit to authorize it to
locate, construct, maintain and operate certain of its facilities hereinafter described upon, along, over
and across remain public ways anal in the said City of BANGOR.
No public notice of Us application will be made in accordance with the terms and conditions
of Title 35-A, Section 2503, MRSA as amended. -
LOCATION:
SYLVAN RD, beginning at utility pole 4 12 to be located on the northerly side, approximately 735
Real westerly ofNejunction of HOG" RD, thence coming northerly from limits of wide road - cable
bmiN in 4" rigid conduit, crossed in b" of concrete, covered with safety tape, and buried to a
ra mmum dep trof30".
10q.YM6131(029
The facilities will combat of line composed of wires and (or) cables, hereinafter described,
upon, along over, across and under certain public ways situated in the municipality herinbefore
referred ro and the right to place and maintain underground Islands, conduits, manholes, handholds,
cable and wires in along under and across the above or intersecting public ways for the purpose of
making connection with such poles and holdings as it may desire for distributing purposes together
with associated eppurtenmees. The wires and (or) cables will be baried within the limits of the public
way, but outside the part thereof customarily used for travel by vehicles. The initial operations of the
facilities will be, at 120\200 volts, Three Phase; the voltage will be increased as occasion therefore
re0uves for the operation not in excess of20KV to ground.
Dated at Bangor, Maine BANGOR HYD(pRR�OELECTRIC COMPANY
on September 30,2004 By: B.J�IQBYit.
Mary 3an n
Transmission and Distribution
Sob Coordinator
BURIED CABLE e
POLE PERMIT PLAN
3 PHASE 12.5 KV
rc p
(4
NOTE:
ppsm Y u2 T 6£ 13AUo w W 2raGm C wOusT�
F/OC4f . L/1 of ColQczTr� COWW 0,1m WET? 2
TOPE R+jo Go ro &FIN aF w �