HomeMy WebLinkAbout2005-10-12 05-320 ORDERItem No. 05 320
Date: October 12, 2005
Item/Subject Order, Granting Utility Location Permit to Bangor Hydro Electric for
Underground Placement of Conduit to Accommodate All Souls
Congregational Church
Responsible Department: Engineering
The attached (rider is for granting a Utility taodon Permit to Bangor Hydro Electric for relocating 105 linear
beer of indstlng overhead line to underground electrical oval This Is being done to accommodate All S Is'
expansion.
All work is to be done In accordance with applicable City wide, ordinarrces, and any additional
requirements of the City Engineer.
NOTE: No separate public nonce of this application is to be made.
v Department Head
Manager's Comments:
Recommend approval. ^ a ,
City Manager
Associated Information: ON", Location Permit Application, and Sketches
Legal Approval:
Finance Director
G SOIIdNr
-X Pasage (Consent)
_ Hart Raading Pain —of _
Referral
Granting Location Permit to Bangor Hydro -Electric Company -
Underground Placement of Conduit - French Street
THAT, a Utility Location permit is hereby granted to Bangor Hydro-Ei is
Company for the placement of underground conduit to accommodate All Souls
Congregational Church as described in the attached permit application; and
BE IT FURTHER ORDERED, THAT all work be done in accordance with the City's
Street Opening Regulations and other requirements of the Dry Engineer.
IN CITY COMIL
October 12. 2005
Paea
05-170
CLQ O B 0 8H
��''PIITLEI G[wHog Location Peri[ [0 6vvgo[
Nyd it ce r2 0:G -any -any � acemenf
Of C Mit - French Street
J5 3£O
All Souls Congregational Church
10 Broa"ay. Banger, Maine N401
_ (207)9427354
Fax(207)942-8535
James L Haddix. PhD IBane U. Dared, MBiv
September 22, 2005
Mr. Art Morgan
CitycfBangw
Engineering Depanmmt
73 Hadow Street
Bangor, ME 04401
ITe:
All Souls Congregational Church Addition, Relocation ofMoctric Facilities from
Overhead m Undegound within French Street in Barger
tri
Enclosed please find a Municipal Underground Permit form. This form was provided he
All Souls Congregational Clench by Bangor Hydro as a necessary documerrt for installation of
underground electric cable along the Church's frontagem and within the bonds of breach
Street in Bangor. Ihave enclosed a reply envelope for return of the executed form.
The overhead line needs an be penu meady relocated for the Church's addition and the
constmcfion thereof. Our schedule is very tight with regard to having a building fiamed up
before inclement weather comes. As such, we are hoping the City will provide Bmgor Hydro
with verbal permission an place the pole and provide as with verbal permission m begin the
installation of the underground conduit.
If you base my questions or concerns reganting this matter, Please at me at 9454597.
Think you for your time and consideration.
W.AH PeterL bliart,Building
k.
All Souls Buildang Committee
I
05 320
MUNICIPAL UNDERGROUND PERMTP
DATE 2005.
To Bangor Hydro -Electric Company:
Being the duly appointol, appropriate municipal officials ofthe Municipality of
Bangorby our signature shown below, we have no objection in the installation of
underground elecvic cables exteMing southerly from a utility pole no be located within
the bounds of French Street in the City ofBmagor as described in an Application for
U01hy Location Permit 1BANOOR055048 PLAN# 055048 dazed September 15, 2005) a
distance ofapproximetely one hundred five feet to utility pole no. 8located within tM
bounds of French Street easterly of the traveled portion of the street and approximately
two hundredfeU southerly from the centerline of State Stred. Said electric cable to be
installed w pamunemly replace Ne exiting overhead facilities to be removed for the All
Souls Congregational Church addilim
Dem Municipal Officials:
The above ref enced underground instillation at All Souls Congregational Church's
request was completed on ,2005.
By:
ManagedAssis[unl Manager
Bangor Hydro -Electric Company
The Division
Bpngor HyypEle[bie Co. P(orm4g DepatmeN Banter Order42165223 A[coun M1911&3630