HomeMy WebLinkAbout2005-09-12 05-291 RESOLVEItem No. ing 291
Date: September 12 2005
item/Subject: RESOLVE, Ratifying Execution of FAA Grant Agreement for Project No. 3 -23-
0005 -42 -2005 -Terminal Area Study at Bangor International Airport
Responsible Department: Legal
Commentary:
The City wishes to accept Airport Improvement Project grant funds available through the Federal Aviation
Administration and the Maine Department of Transportation. These funds will be used for a Terminal
Area Study. Federal Ponds will cover 95% of the cost. The State of Maine will cover 2 Ih%and Airport
2 lh%for a total of $231,100.00.
Because the Grant Agreement was received on such short nonce and had to be mined to the FAA prier
W September 2", it was necesssarytphaYe 3lmR'ugsiguthedewmenRas-A ngPityM agE W6—
The City Manager's and Asst City Managers absence.
This Resolve will ratify the actions of staff in order to meet Me September 2"a deadline and not jeopealze
the funding of this project.
Department Head
nagger' Comments:
Recommend tl approval.
Cty Manager
Associated Information:
�egegr?a
Legal Approval:
City Solicitor
Introduced for
3 Passage
_ First Reading Pape 1 of 2
Referral
05 291
- Aeoigoea to couecilox GraMck sePteober 12. 2005
CITY OF BANGOR
(TITLE.) RESOLVE, Ratifying Execution of FM Grant Agreement for Project No. 3-23-0005-02-
2005 -- Terminal Area Study at Bangor International Airport
By the City Council of the Gty of Bangor:
BESOL VEa
I Tthe August 31, 2005 action of James D. Ring, acting on behalf of the City Manager, in
executing, on behalf of the City of Bangor, FAA Grant Agreement No. 3-23-0005-42-2005 for a
Terminal Area Study is hereby ratified. A copy of the referenced grant agreement is on file in
the Office of the City Clerk.
M CITY WMCIL
Septeaber 12. 2005
g 05-291
eES0Lye
Execution, of BM Grant
Ay at Heugor Iateraeti
Msigned to Councilor GV4�L
of Trenwore(ian
Eecand Aviation
Adninistuban
GRAFI AGREE -
'Part 1 - Offer
Bate of Offer: August 16, 2005
Bangor International Airport
Project No.: 3-23-0005-92-0005
BONS No. 16-916-2066
TO: City Of Hanger, Maine
(herein rolled the "Sponsor")
FROM: The United States of America (acting through the Federal Aviation Administration,
herein called the ^FAA")
9)RERRNS, the Sponsor Me submitted to the F roject Application dated April ae, 2005,
for a grant of Federal funds for a project a ociated with the Bangor International
Airport which Project Application, a approved by tM FAA, is hereby incorporated herein and
made a part Mreof; add
WAERSAS, Ne FAA has approved a project for the Airport (herein called the -Project")
consisting of the following:
Terminal areA study
all as re Particularly shown in the project application.
Page 1
NOW THEREFORE, pursuant to and for the purpose of carrying out the provisions Of the
Title 49, United States Code', herein called Title 49 V.6. C., and in consideration Of (a)
the Spensor's adoption and ratification of the representations and assurances
as contained in
said Project Application and its acceptance of this Offer as hereinafter provided, and (b)
the benefits to accrue to the United States and the public from the accomplishment of the
Project and compliance with the assurances
and conditions as herein provided, THE FEDERAL
AVIATION ADMINISTRATION, FOR AND ON BEHALF OF THE WITEO STATES, HERSEY
OFFERS AND AGREES to pay, as the United States share of the allowable casts incurred in
accomplishing the Project, 95 percent of such costa.
The Offer is made on and subject to the following terms and conditions:
Conditions
1. The nations obligation Of the United States payable uMex this offer shall be
$219,545.00. Par the purposes of any future grant smendments which may increase the
x
foregoing mam Obligationofthe United States order the provisions Of5ection 0106 Ib)
of the Title 49 U.S.C., the following amounts are being specified for this purpose.
$219,545.00 for planning
$00.00 for airport development or noise program implementation.
2. The allowable costs of the project shall n t include any < s determined by the FAA
to be ineligible for consideration as o allowability order Title 49 U.S.C.
3. Payment of the baited States share Of the allowable project costs will be made
pursuant to and in accordance with the provisions of such regulations and procedures as the
Secretary shall prescribe. Final determination of the United States share will be based
upon the final audit of the total amount of allowable projectco s and settlement will be
made for any upward or downward adjustments to the Federal share of costs.
4. The sponsor shall carry Out and complete the Project without undue delays and i
accordance with the 'terms hereof,' and such regulations aM procedures as the secretary shall
prescribe, and agrees to comply with the assurances which were made part of the project
application. -
S. The P es the right to elect Or withdraw this offer at any time prior to its
acceptance by the sponsor.
6. This offer shall expire and the United States shall not be obligated to pay any part
of the costs of the project unless this offer has been accepted by the sponsor o r before
August 30, 2005, or such subsequent date is may he prescribed in writing by the FAA.
PM Form 51W -3y (10-89) POFe"1
7. The sponsor shall take all steps, including litigation if necessary, to recover
Federal funds spent fraudulently, wastefully, or in violation of Federal antitruststatutes,
or misused i any other m any project upon which Federal funds have been expended.-
For the purposes of this grant agreement, the term "Federal funds^ m am funds however used
r disbursed by the sponsor that were originally paid pursuant to this or any other Federal
grant agreement. It shall obtain the approval of the Secretary as to any determiaation of
the amourtof the Federal share of such funds. It SM11 return the r red Federal share,
including funds r men
red by settlement, order or judgement, to the s .tary. It shall
furbish to the Secretary, upon request, all documents and records pertaining to the
deternination of the amount of the Federal share or to any settlement, litigation,
negotiation, or other efforts taken to i uch funds. All settlements o other final
positions of the sponsor, in court o otherwise, involving the recovery of such Federal
share Shall be approved in advance by the Secretary.
B. The United States shall not be responsible or liable for damage to property or injury
o persons which may arise from, or be incident to, compliance with this grant agreement.
9. Puy American Requirement: Suisse otherwise approved by the FAA, the sponsor will not
aoquire or permit any contractor or subcontractor to acquire any steel or manufactured
products produced outside the United States to be used for any project for airport
development or noise compatibility for which funds are provided under this grant. The
Sponsor will include in every contract a provision implementing this special condition.
FM Fo®5100-30(10.89) Page
The Sposocres acceptance of this Offer and ratification and adeptiou of the Project
Application incorporated herein shall be evidenced by execution of this instrument by the
Sponsor, as hereinafter provided, and this Offer and Acceptance shall comprise a Grant
Agreement, as provided by Title 49 U.S.C., constituting the contractual obligations and
rights of the Muted States end the Sponsor with respect to the accomplishment Of the
Project and compliance with the assurances
and conditions as provided herein. Such Grant
Agreement shall be effective upon the Sponsor's acceptance of this Offer.
UNITED STATES OF AMERICA
FEDERAL AVIATION ADMINISTRATION
g��,4
Tic1e: Manager, Airports Div
New Eagland Region
part II - Acceptance
The Spoasor does hereby ratify and adopt all a statements, representations,
warramtie$, c ante, and agreements containedainathe Project Application and incorporated
materials referred to in the foregoing Offer and does hexehy accept this Offer and by such
acceptance agrees to comply with all of the serve and conditions is this Offer and in the
Project Application.
Executed Chia 31st day ofAyvysi 20a5_
Y e.'.r ity of Bangor, Maine
i n Amina City Manager
i r
A ,
Title: -�iit9 X ------
CERTIFICATE OF SPONSOR'S ATTORNEY
I,gorran S. HeitOann III I acting as Attorney for the Sponeox do hereby certify
That in my Opinionthe Sponsor i emanation a enter into the foregoing Grant Agreement
under the laws othe State of Maine. Further, I have a amired the foregoing Grant
Agreement and the actions taper by said Sponsor aM Sponeor•a official representative has
been duly authorized and that the execution thereof is 1n all respects due and proper and in
accordance with the laws of the said State and the Act. In addition, for Greece involving
projects to be carried out an property not owned by the Sponsor, there a o legal
impediments that will prevent full performance by the Sponaor. Partner, it is my opinion
that the said Grant Agreement constitutes a legal and binding obligation of the Sponsor in
accordance with the faresthereof. -
Dated
atSamCOF.
Main
this 31st
day of
AUKUSC
20 OS
Sigaad a
offSpwMYv
Attorney
FAAF=5100-37(10-89) PW4
APPllCATION FOR
FEDERA A535TANCE
x.WreauB[nnEO
Apglvm Monefiw
Ponla.ao5
aMlsslox.
reREcwmBV ST,T[
Bqn PogimX^n manMiar
Ipplvlwn8
Pmpgkenen
M}E RECEP/F4
BY xiENOY
©cella`
[d Ca
u1ilisoRmiwx
al xann.
Orga
apmrene�
RUST Baryw.Mne
Ben9w Fmruhnel Nrpaa
ppaMalbnL GUNS:
wn.
apmero,dg MemmxlalanmNen
MWI'm this app YunlMYwroN
gpmeaM
iGeMeis['+brek
Mrs
fl4m
Ciy
me
Bmgr
arm I'm
:;F E,Acm
ayW
AYM1w
CcwRy
Emi:
USA
flEo TONXUMBER(EN):
mXunAnfMammYR unbr(greammal
; ��[0
314 *X
�rMMrA[4NmrNn
EOFMPY D,r®
FEOFM Nii: isae dd' T]9aa)
Na., R,,M,n
Nmx:� m a�ywL
e.ania,mrw �mpmn glmmmR p �
m<m.wR
KAMEOFFEOERLLMENCY:
p0ar(gaWl
Mvvl AJSIMMmWM-NERNIim
CRT OFOFFEOER DCMF OASSIST
x0�-DOO©TlMI,dA,IEWOV
RIPFIYEt OF APPLICRNTB PRNECP.
me M...r Pmomml:
um� Nnpm eNrem Finamn
TEo eY pm.IEDr rDxw cammeA x.N. w.,
Op NBaFBw F ROJof PewAm'
w
In aN:r
a Pop M I E`Zp
M005
a.
CU E
M'ASwm
PRONE FCRAVAIAME PENEWONEUE
DATE: RA
NPopwa
m
pR
In PRWRANIe NOT COVERED BY E. 0.198
t,
Q OR FROGRIM HAS NOT BEEN ZELEGTED BY STATE
ReyamlmmaT
-
DMANENTON ANY FEDERAL MOBt
IS AFFLWOM W
Q Yv an awlanaMr,. ®Ne
TOTAL
R 92100'
roB HYNN4W WEANDBEYEF.ALLWTAIN TR®M REFPL,NWMAPE TRYEANOCORRECT.TE
MSBE WLYAUTR DYTREGO MIMBOM'OFThI PW TANDT A"UC,MNILLCOMMYMTTTRE
MACHED ASSURANCES IF THE ASON5rAME R AWAAOFU.
F Nan,,
IMNHarte "
_
RRM®
am
NUPo
TNenNgrnna
°M
Xurnds Mreaenm'el
rvmprRDN.pw
wiau+ero
.egmwenwmll¢eflw^®mew
uw Nowa
a]elRv.azwwM
gMorimi 2rnwml Reowaudbn PremalEeewwB
INSTRUCTIONS FOR THE SF4 4
71�n,,
burden MSO, In aNm N'rrrbannot ¢eamamd M mrMl 45 m rafts Farrzgnre, irt1WXg IM, Or Tommy pl
�lr0 exl¢41g dN vures, 9eMariR erd Irelrl@m'InOrM1MtlAre�eQntial rg uN reviawaptle mlbcSanafd Wrdan aonof Anrnn.vMWnO¢WtleSMiMayemeandalth,aed,andowF]MISMalOT RETURN YOURCOMPIETED FORM TOTNE Ot OF MANAGEMENTAND BUDGET. SEND R TO TBE
OVIDED BYTNE SPONSORING AGENCY.
This III ¢bMa,cbran wad by aFpA®rRe¢a anua fimantlePoGalmsarbnlX,tl%Federal
emaaia. Xvnll betmtl by FMtlM91 s0endttb abbin aFpllnn[wltlhaSan Nut 6bte¢wfeN M1rveeffibliMed a muiewaM mmmeM
gomtlure GI rs¢pormb Evevlhe ONar1ZSF2ard InvawMobd Me prcyremb M inclWed In Marplawm. M1aw been pWm en
oppaMmM1' b review Na app5mnC¢ abneatiwt
Sli it 7� Alan,
6eMaipa rt9ubme6an -
E+braablanvnpMMe NlM peptl.FmrvelFenana
w^ammRma.x.a.mx MwMappwtl an xgawm^x.
kloca
abmtl panj:al
mappAp lia.yyamP
Malay?
rmpa.ba.mmn.ry
MMM till Ifth. pay"!
�appbnYam ill (ersw raNNmeY)
t
Alan",coumlm palreal:mmx Meana Pa., Si
baFMxa"�IeA
dial
u¢emnlxaPplebe).
Mme prVallad aen dau.aeam dw a w Mi
Ma WF,MolaNenx
ten
ManmGMVInN [Mand, Ox4kVy
�e`.xM`rmr a,mWr:XmN apalmdan s. mMnuam^.r
awame mepmaramar«wa
ma,m F.a,mDeMNN.
number
b.irym. naftPxm.Manat.lm wi..rvw^^aw.l.,x
»m b�bb'; va::mma,a
�Aa dx�a,Pxappdxel.l..xmwaaw.aamm. -
m.a�v.ro�w
ma.mdn. ^^mnW em.nX.Wns oNxs names
IµaM�x mp.mW....
p«a..ax wa.aeeraeaaw..^ si^map.wammxmMplifta,
..aa,.
w%wwv
.nrm..amalffinnm:`F
mmm`e
°°°w0ona -
w, ky bad o^
rwrolan Mr, ^o.�ax ow
all mm px. as ft, I&
Agmen Axawule�xrawkAn mm slpa Palm aced
ErorFarmrar xumba(Elxl a¢aupnaa Wan,
�,awmn
abi w.a" rvn.
t¢POCI mr F+aanl sewxre OraarIMM ill aawmbre
Whi ma apMMAMI mbMam all MGM
t Ma.b
paPaa.
poll IF ma Iwl.ammi at
m eP®
__ rvW r
at dc"cl n mm Nkfta�m
Gmp
ftm
mdla a. Paxm u
eXw•re
x b0
Mind"I
F Malawi all ReNPyarvafm
'SpaalDDNanq Ictnx@p¢M
PanYh l O
Mrallem MhAeMmq^let
ba Saftab uaumacMrapeuraatln ertle aPNw6
I Nat mi
e.mlm Flat awn=wma r¢ wu m W,
wmwwm..a
�Mftuyio.ra::a`� Mmwn far an w anal
Ma.l mpamatmi mx XN ben,
MdgI F W a Mi^a all a pajama mnpalbn
,RUnnA at ,F yFaM1rel apaax May ^mluflat
Ow
m® Makinalk, ba.wmaa elan rtm, AFFAMM)
"imIFmtab
l
Mnwaa`FF
l lyFll11 x lbsro^.
eewal
Fa NaNen am, th", appr^v+m mane
xx AwN e®ea/mara
olmill D, "m Guiana
S.
NIM of Falk,m aM1idr MIMm 6 MM rea„uad
XasepLbrle^��
Vx bpf ofar FeMnl DawaW Mdmn®na. a^aadaN
Sli it 7� Alan,
oerueauR«nwm«nman reev.>.mmmnwi¢arm PARTII oa
PROJECTAPPROVALINFORMAMON
SECTION A
Nama of Gouemod fitly
pvxtiv aub reword MOM 5h@, !homy
Yal,+ moral, or am rPinomy m5ms
No
iwm2 Nemo of wncga drund
NOS far¢m40,nm lowest requite 5db. local NormanGwmonmCan)
mmpnrv, ear®nand«n.d9 amammp
Ren a
Nman uomemnml
¢¢ roes¢ Wu¢d urm car i
maiaamJa
?wre
S
mnm in amtlenm xM OMB Gwk r h`K,i
m in ,,
Fmmape
❑Y¢¢ ®No
Bidrem¢
Nam 4.
Neem NPPpmnryigenq
man 10.
See 9mi�«mfmxoB9nal imonnetlpn 9 M PmWN.
coal. m,nel,w omw ple�M 9ePomvlP
Wb / /
01ae®No
man S.
cw&cma: 890 ❑
kNegapwa vetl by en eppeewa
did?
mmpaFan¢rtn dant
Regional ❑
®YuQNo
l mMMoa Cm lawNnae FM-NERepcn
IYnG
Nf I Ne rote®nw epwdea arve m
MealimWlatimi
Item i. - ..
YNn mo mm,mmm requested bo on hemi Jana
rmmmmm
VbI Ne!®denw nquestrJ Feve en impend
arelbctan tee ¢mieonnerR
Fa6al Populmtlm MnMEng man Pmpd
Nemeor FPmmim¢9umn«.
warn«orFeaermll.ne
PwntolPmbG
Bee In¢OuSSn¢MeWNnrel inlwmNm b bo
P ^n6e.
Ibm9
NumlwrM
vaanemssp9nm'r.p�eammmnemrs? em
maiaamJa
Mmemaim9.9mlm9im¢vi.¢, wamme, ¢r
Fmmape
Bidrem¢
. ❑Ye¢®Na
Form
man 10.
See 9mi�«mfmxoB9nal imonnetlpn 9 M PmWN.
tl+«re99a ¢smnce on N¢
ind or
Wopdgerierv, yaMirg, werNypba9
ModI
msrane�m+m rynlsire�a nuwawm+a (wen $ex
INSTRUCTIONS
PART It
SECTIONA
N¢gaNsamuw¢'ml noimrybe an¢wbnaenn unkalM FeWlelpeneyrequmh mos inkrmtinn.t.¢ kbreeb. Pmvtle
wly4meM¢ry dab br all Nes' ermvnrs in tle }em Moved¢! n a¢oNvrm xYF Ne hAm'.inp inatluINon¢.
mom f.- ProWea tle name M No gowning bay Rom S.- SWw No Fedml pnpulelon redRn9 or ,rmn9
etlabbs ing No Pomo syabm and me P^mMrabN on No heed vsblYtion Who all beni mom No popR
¢®enalb MlaPs1¢ab. ... IIeIN]:-5 W londmP6lle of Ne WeAQ']9FC III
Ian 3.- Pronea No coma N to perry Of Mad amen be coni on 5,11 owned or laavtl mM. Qwtee
rose¢tee coma and samen No eocurenm MOf none, ame Federal; mediation ml its bmtlon.
aurgpsval Ian k- Briefly eea me bamboo banembil ander
Ian B.- Agobtlp abarirglwuee comments for led namNllmpa on No amlmment hems; M E2
applicationm eewMnu wit, ft, Instruction, contemn! impose armed, X an aewrw ewmnmmm Xrrydrs
'
OMw of Ifi map d add Pnepel Ciialmr M. AiS. If amodemad, "Main what w dw voll a glen m mlmi
mmia re tmXetl peviosly with a NoingwR Fe6nl poem wil pmvitle imarab
pappl'otlon. ee not ,conk lhm ease but am momemona 9d dem is noodle.
aa0mel mmroms received finmtlu dean nencum Mom e.- Stals No nnmWr of inaivmuel¢, hmllba,
si W wbmi,d vMn arae appHOMm, doomened, of da, an inject Ml di¢das. FMesl
Rema.- Furnom Ne "me M No copmWg aamay and apmam wul pri separate movi X additional
the ppmwl dare. III m needed.
Mom S.-Shoo v.TMWr No approved mmplelaname phn lwm lo.- Show Ne Femme ooma¢da As'ffinm Cemlp
h5be. mml or rtyiune,, or d none of Nes; egmm Nen nmWr. the pmyam name, Ntlp
Ah, anf saaw
ah. NO
¢vopedxsgan. Cave Nemwenn vmere Ne appmwe and anownt 0 sm amimA nen, aero is relaree
Man h ewilabb for ammiratom a nd am, enamor No Pb'dhs.Ierdir9. a<enAdpaled awffiTm. No
Mood is inmriberrarce am in, Plan, adli6ireldleeW XmMN.
PapvnvRPeauedan Mt %remml lM1 iiawnnenmmdaden Ne wnelpud&uxa ;a
apprybrme•rnmrepgarh Fvmrm pxvTee eymsaabymnanwnrmmn�n
Tao 6, UnYtl 9bb¢C•aa�Y B.C)BWbna]1h8. vknLLrmtee FbnnM MbeFpymr W¢pn'm0�6 lavMbarnepmemFamam
boa m pe.Yi a cmpnaen W a coma[
nawibrNi
The dua•nF raad�navmmeuavmnwdm W E Wn�Aypm�id eqi®F•r, bra• NW yemer INporvl �e
nxkry.mrcd•rp.aMWsyage trtdmtwpnpnmm. o e'Ip
F•• nmtla.Xpuxbhbmb,ry
on da ndudnpW Wsdm.xMb Fadanl PVYden MnN �U BW IMapMan®PYE, SN. WaNyM�W.
�rm� �: omen ea•^<y a.Ymrmndrdm.mm,..ne.m �marmr.amrem•nam,•mp.manxrnrom.mn
a+x•i n:m;n.,m.mywmadamnwln.na>.aNamnmae
.,.rrnra mmmanw_ pwwPARTII_SECPONC www, 1,Wl
The Spanner bmby reprownb: and reNfie¢ ar Wore: -
I. Comps Lk land Use -The Sharper haw teen Me mlbemry aei as MWal n m "left a warp, of hno mipmMm m
'n M, vIdnXy N Me ail '
Land urs who W mpar bXIN it abl®tl in Me Arl Ml Plan UPMe, ISM, on filewilh Me FM -NE nglommi
oPare
2. Notable -The Srwnorin mt in Wol ary cblgabon to Me Unita at as or anyWall oftr a Uniea SAba
Gmremmant rahtiw b Ma anabpmM opamEm, w mainbrurm oP eery irWrt, ermpt ea ffiba herewM'.
Nene
3. Pmtible Pwbllfipa-Tlera era neleeLLorcmunrshnae¢IintluMnBMe exlsmnm Nellectlw erpmpmeE kaas, uce
epeerteM¢aoM,r legal Me9umenmaHectinB ua afM^Airyartorma ev¢mrcs nfperi3rg llNge4onaroMer lapel
p pvryaN¢tlw qoN®onol Pen V olMk A{pFexEwr, &ticembPoj I�Nng ibbBel arfiarthl adNyar eMemiwu,¢tasmpt arsm
bll s
None
1. C.`nigelenryvnMlmlPhm.-Tfx pmpYhrnmroGY mFltiabMwXh plma(enArgattle l'vneolsutnlmnnof My
Ma on,m a✓ard'ig to a,r MalarsaWpnma hY de soremrMicM1 Ne Pml^tie iomta mgenHN. aewlopraMaf
tlgsaasumMaln9Me airWR N/P
5
popctfacemy
W MLrcsllrimm&.-IllreapMn BlrcM¢demEonm MeirMresrofwmm+npeainorreerv.Ten Na
belmhd Nrp -.
a C,,,hWWnwfh U Wm In maebq erbeaonto uNerhee IDny elryan tlrvelogneM popGinmrTitle Cg, WNea
Atte Com, X hes thereon, remember =WMMmwIMaReMM partialwlnBr!e W ardearr" pmpGIs Wilbei
N/A
S Pudp Xaenrpa.-Ingcltt4lrrwMSMelooMn NenairlpR an.airyanmmny ora rruprnurmyexmrivon.Rhos
aRONedme eppoAatityhr Wd'e fearing¢ miMa WPwe ofoaFl9tlxingtlm emrontic, wdel,eMemmm�menhl MxR
of Ne IDlrWrtornpmay looWn mW Ib wntlsmnrysvMgceSenaabpGresoPartlr{Yemrvg a,ys�n ®Hereby
MemmmwlryFilter.Lalee Mwnragweed by No Sacnhry,a NmXawoy MtlnX ammorofan in Me WorMe
wpoetry. mpd i, rated rhirch,XXasmihmanpmera WeN eiWMe hil mp"Won ft hnmalmarbun2es
wirer Me pmpolabpma artiueMmO XnxmmrnPow Mot Maylraw me rpMm "Won ft Seoehryconcemng a
PmWta pmisR WA
g. Nr eM Weler Urelrty ShMarb.-InpmleasinwN'ag alrWnbsrbn, a majorrwway eMazlon, ormmay Ivaticn X
mill Pmwe'mr ha CwmrnoWWr, lain Wrvfi tlen re he lmhat Wal bx anBba S veYrytlerMepcleM
W ball who wch W. wmhrhaW, IDM Chiral appa o re he WineplyMime atiapd�bm el water OMAN
mereawalRyadamrtle. In
any a.: wnem war¢tnmrm nave lrMb..n appmvMaMwham apgimM.ao-aM mare wMm renmra.lmve been
Prmrnuarr brM.MminiWamrMMe EmAmnmenhl,ad Imp Pgenry.mfT nonn"ImPa hapmodepmrdr
Aammieabr. Npti®ofuNfotiwrarmrnlmmNiyion ba ProWra Mhm axryaenahrtlrepmg6gpfmfioa Nsa
been reo:mtlb)Me SaoeCry. WP
damaysemmaa.�aranw-�ew.r,. 'PART II—SECTION CFoxi�xaap Oman mew
s, Ewa:a ElPbb.-men'nm®ammanmaaia rpmmrte mraaddemmmmudal ava:Mxemeaparc
ewrretl ormrAdbd by tle Smaorexwpda Mbwc: -
mons
10. L¢M.—(a) TOe ga�wrlwMl¢1MItlbMigpapMbina¢afntle blbA�q artm MhM"nliM enbbOtlarebfeE
Mtlas paRrlorvn wnneWmviM teNryaRauhpdm th MbMrg ermp4an enumbnnm¢, ¢ntl iMva
xiCre W. 41 M vAia area are Mxrtlfiee w XB varcmelNanPo gap•M m¢p de¢Igie� ¢a FYrvtit'A':
by9pmaor pr MaimelllaneeMted in bei mi ar embpatleapa braery )Sgtlficr FM -NE
re0ywag Ce pmPoM iMemtiamnM1lnatl In NB Airpana E fiihX'A' (u{bbtl Jarwary XLN) an Ma v.YM1 FM -NE
Regimel plAcem 6urfin0tl+n, Meaacrosem.
The Spanish mMar earner; Nat by shone is Maas an a db martinet by a seeded eMamer or We mapm and tlM
ash ani orble mmpm has disarrayed delete Sp F halm to¢rove pmpeM Mai
(hal m: spdrrmradllamMn,aiX:rranmm�aaeame, emmam mmpnarm am ¢mrtdanrmrrmmmn
whaMarta Pofjx4Namsare pmpaM an
to nnafiibMm areesof ran
Wiabd as xhdrucEmwrk ism
be[erlmrnd. a4af xfiichareeaxelder2fiaeenteabrerrerRarred pmputy, rruPdaalprubdae EaTiv. 1'A".
WA
mea^ TM Smaw wi0ahquire afiMn a Monsanto says. and Xboats pday corrosion,air m corrosion, it all
markWtlertln Pml tto Nlwergribar.on
peR in veasetle Mbg ereN best shkh an m be developed
or ad as hand or in mmaetlonnM NB NrpMaXMl be u[Mmnpla601 ft, Probed. etlelMMarman- -
NenhFad am are abramerkmed pmpaM map devoted as allbk'M
N/A
•smm drende.dpepeMxwesNemn we errebuaneidenfNy Xvdam wexmdloX¢. anmmhh.rrme, eaeeearm
MfereabdewrykuM anenelure� MWdnq Nei eammenm�.beme� eh. rXe aepreb ansa MOndmetlonly Letlmdfise
Mrehyflnereenundxa¢how en tlreprcperty map.
rntwmam�mMmlamsaarxsamuww�vml aoa
PART III—BUDGET INFORMATION—CONSTRUCTION
SECTIONA—GENERAL
1. Fatlenl Goma¢li Ps:ffir�Ceblc9 Nb.
2. F,n mlor Omer Bre tk
SECTION B. CALCULATION OF FEDERAL GRANT
wncu991Frcanan
Js oM Mr lM&ons
TOWP nt
Onlgg Poyo„oe
gdjmmeM+v
Regmlw
1. Fammismw emenm
$t000aa
$
S1.00000
2. RWminau ewen.o
3. 1sn8, am arae, lignwr-.my
a. Mr hn.4imlen®meim9bvtlelees
231.100.m
2311100.00
5 ONaamM1'RGuml ergneenn9hrs
8. Pmjecr hwp onH®
]. W d dry ki llsl
8. RelowNn emwe
9. RelomWn Wymm tonGlu 11 ab W01e e
10. Dmml'N,n eM mmwM
11, cmab on ami pmpa Mpmwmn¢
12. Equpmmt
13, Mlamllenewe
14. TOW aMl I 13)
zu,io0.w
zR.1a0.00
15. E MltW lrc "p.pNm6W
0.00
o.m
1e Not PMp Amomt nr+o 14m M
23z,10oW
zffi,+ao.00
O. ww ineligbla B lu¢ s
18. PM: Cm Menus
19. TyW Pro 3A IElWKeq RMeNNefbn GnMq
2f'Im.n0
23x.100.00
20. Femml BFare MWad dlure 18
2A'4 .o0
2SA80,O3
21. PYE RelubilNtim GMM Rwrye (1W prvmtl
22. TO l FMeml 9MM mquetled yAUZ0621)
220,4%%
22r1,408m
23. GmNee'9an
24. O ertiv
I1.(Axtm
11,804.00
M. TaW pmp XM,=24824)
$L3$100.m
$
$M,100.m
INSTRUCTIONS
PART
III
SECTION A.
GENERAL
1. Show tln Foamed Dmea4c Ms¢UTe Call Norman
Nrwver away to total aerosol for all pogam¢m
M1om Mason Me a®aft is rrcueadd When men iban
Satin S of the Mang.' optical Leon.
ro Faogem or Cooled Numbs k ar el ON the Moment
13howTaNnNmal orctlgrwle@ua2l bnabub.iF
on boeltln6udWMe FM,Mg kpm morm9in
n Irea av Feaeml gnMor1 Pnpan a xperem
of
a-411 Pre We a vpaeb
,untie, on an amrall so
elidet a forms for
wY W Part III tone for exon Pentagon or CSMoa Number.
SECTw10. CAtwuTION K FaCERAL GIANT
Men spplyYnt for a new gent ung to Total PmouM Colum Only. Man lawAry reopen¢ NpmioWy game"
ammtral. useal) mlurm. -
Lim 1-Emoramrnta roeaea for ahsystralon sommm
Line 12- ERv amounts for eginsma bN five aM
MaL
For
mudial vnY ONe erpenm ibmaen6eckmer
rorowboats
Mlrental
®mrAe BMMe arm,=for Methanol VWCM1M 11,
aaminSrMegmnt lrclWeMa emouno(Ilimredegreme
wamry mi town aWlO v'rsuel sp ,movable tiveYs,
eyes, Improved by WobMoln le®ffition and ale Oft mla
choul and lateral aupmem
m=uMer Secbn E RemaM
Use 13-ENr,nro for Namz mtmpliftlY marooned
Line 2- Entry annurb Ped Pmlg m to seek berry and
a1
tllagram, means sum" and mapa, ainklg tort NNo$eM
LIne 14 -proof the am W Brea 1-13.
A ober mh mquirm pnxto ramal co monsoon.
LMess- Enb-ina to gMemowtam asnm bametlwt
Line 3- Enter amwMs alrectY aseocialaa ago ban
burry W9rent {emeaMap[Ibam Ne
w the
aa'qulGlbn of land. everting Orwa ;aM named fled
mmN
way'
Line 16-Eml digemrm geove nto amountm Lee
LIne<-En6erbaichazfrreNi6a9valeynweMs
14 am to eatlmem] para eslwvn on Ute 15.
wmim
n- Enbr to amowb fertlp¢e rl wmh an Mo pat
Line s-EMeramuntsbreesramhlmcWrel assuming
Oft Colyer, b FeaeralpAcl{e6On (See
"MM, Moth von Covey; M1e" am WMga
oulC Cons 2rm[
Secfon C, Gro mg, Cmlumn (i)j.
LIne6-Enkrfeeabrimpectlon Moho au9l Olan¢Tldmn
Line la- fonder ago �b]ammn[Mmntlrymciea
am rela@e pWlem¢
Cumµm tlkmmal Is Alexa 3ubnad fium the net
Llne]- Enbr among mmhba got tlo aevM,Mm a
pcl earm, on llra 16 Vv,matte project
pmwva
Ma Mare tln III Pulaw of to (IreMl¢ IOM
IueimsMons, an Inns t] and to amount whicba
dmpmwmand StexnMnmmatlyavo dMMmapr
axclWM awn 6e mriryenq pmAe msumonln Secret
campaign amen W excluded M1am Mh®kgwy Moho
C.urc25s.Culumn m. Mul%drtoa mmgNaamoudbv.
eboxn a,lme ll.
bre pira nano endanconp'b.
ft on
seonaan®xitll Ma Fetbnlpm9�nNukanm.
Feel bruin
uvea-EnMNamlaramounlm rreeticlmgSNae
resFortole
ee^ta MklMI,l rafiva dbxanto in teucra
mm=6 adi®rvavl¢dlm.am tllaMenauntihr
dollar
0lkwan®. arhrMe aotaram]mmMNk
repla®nen neve mere) housing. N M bAll reloom,
summer,
adnhMmton.venmaon tie un.: irsYurb tlem mn Lm 1.
lien 16-slwwbe ental Moi Kure¢1 ane 16
Line 9-Enger toe,am mi ground Of relmamn Pepnanb
to ft,
( Meamcat m afitliba
W be mase to aotama plena bu¢vma mrmma dna
orhia
Wik ,)&amm6apre-
afll=a NPlgem l.siiaom kappliea.l
mn-goTR msartual brencore eVmna« and
rePlammdmeant
seam - slcsNa amour of Fal bonds lauumm!
unelg-EMei Ne smvnhn¢a me v'asn orem{Joyee¢
vtlusire OffinazMnhabiiNton pvpme.
oltlbg"
seemaleyea bUspor6 mas br
n mo Ofeeretllyengageamperbmie
abuMre¢M1wn anscabonraftpedi
billing nduldgro
Me
ft Ia m
eapermte,
This zharravmwakoncthe malofaornd or
a
am Monelana
amrehmadoton
mmlgm Mogr� reM[uluanm perm
amounralob
umforr
We hnaaaera
oval O(impmvxes
in
tle Foamed grerM'asenryinemraerte xiN po®am
one p ss a, man
pedy mMect Retllm one mats on Mia Ina by Ne anmurd
bglMelbn. If Nesmnho MvremMpteigbeapena,
Mmyeged pomea¢fiom Me mk o(vlvase Rw
nLlne l3 irobatl olonum 2l and
eNwtlle mason
Fee eel smMoragenry. OMrwlm, Glow
Ih¢bw@eds
explain E,
the pmmea¢onlire l5.
on
Use2-hoovtE.
Llmbed, buvlbebdlenwumafMeFedeelbase m -
11- Eoermeradob the lmnaMetmct
Wama.
,me
as Legal
m,whomntlof ofahG'TyNm,ndutle In M'a
Use 36-SFw to emaun(mm 9ectm D. Upon 9n.
FeeMm
mmeanry ez
IghxmentaalM
r Qx.bu y spare onect
W lenMmpiy,eM tlghrns
LIe m- Shaw Me armuntham Sectrn D, Lire 38c.
Line e-ser<.plaremry.
d -3C"
SEGMON C-EXCWSIONS
28
ClamlflwEon
Inelieblelor
V Ipaton
(1)
adwaafiom
CoeMparcr PmN on
(2)
b.
a.
f'
g.
ToWa
SECTION D -PROPOSED METHOD OF FINANCING NON-FEDERAL SHARE
P
Grantee Shan
a.
,,,awe
L
hlx�mp,a
A�pmpn.Bane(Br A}pri®nh
a.
Bona
TL,l Oma
Non caw
e.
man(aphan(
h.
Tole -Gm", Shan
R.
Calmar Shan,
gym
SS03.00
b.
Calm
5.503.00
C.
Total OMw Shame
11.0MS0
M.
TOTAL
11,NcN.W
SECTION E -REMARKS
PART N - PROGRAM NARRATIVE )anacx-seelxmacr�uvs)
d -3C"
INSTRUCTIONS
Pi
%CMw C. EmLuswNS
Line M e9-1damfy and I Now w¢h In Column (1)
dismal B. $l%, in Column (Z 1,mggeOwGbe9an
alto.
. .-4AIMeR�Mtlnb1cbit
- -...
->irciiiinMMount
AWW
FeMnl ryNtlpeEon oevum Ngo3ambpNamaunt
Mae M don"
Ynbn inWamdunfumsbmnpubwntldxy
nlyanbragenry inzWcfiov. Trelobl artcuMon
emmdaing tlin Ne Federal mmMwe9exY
limHemtlsa9mz^'ild 9nanuo^t¢tlavmv^bl�niTof-
LIM
IirsEu¢Nna.
Si O. Paantat MEDICO of FIxWClwc lbpFS:mnL SHARE
m H
ERwirwim. of
mA is Out dwai smai sawed tle aaideas
the mMibuWnfsit mindiw of wart Sees
mmFAe@L b d,W and bnmamom, mrmi of make M h
Vae m1,. Show tho arni Mad"I hs mnadomW in
awbhk under SecM1m E Rmrb. Wined al®that Pat
mMr mum¢, iftlen lz a mnvb9 wMdm,n, women
of fare Nal wit be"Uned after eeacLtlon M me Fart
aryef Te mMihuyon W diamond of arson Secfon E It
apeemmem ofeen in, Lunda. If Nero is a added
Mind
conbibubon,"Mand added keds cmNWmn Ad consist cf
bMtic-SMwMe bbl ofllm¢'�aM 38b. Tm;amouM
Unelid-SdowNebNlof Umd Zleq. iddiSemauMmu.Y
urtbe Ne mmemLde emauM&wwnln 3erlinn fl,
emal tlw anmmedovmin Simon B, Line M.
LIM 24 '
dlne39a-SmwNeanoundNM'a9116ecmhmuni
Line 19- Enbrtlm keds of Lina Zld and l O.
StM or¢bb apmryoNy dNe vFpicertu Ma SMe or
. .... __. SECmwE OLxSx REwuwS _
Meed any mMft artirmi Me Fro}M Said POMa sAM
obminbmmmn mqMnal MNmimWdmns wNe maintain
e9enry. PLlvdh addiWnalaMe6.RredauY.
PART IV - PROGRAM NARRATIVE STATEMENT
Appmason fa• Federal Assistance
Terminal Area Study
Bangor Imemational Airport
Bangor, Maine
Alp Project No. 3-23-000542
GENERAL PROJECT DESCRIPTION
A design -only grant application Is being submitted for a Terminal Area Study store Bangor International Airport
in Bangor Maine. Ec wards and Kelcey, has been requested to assist the City M Bangor and The Bangor
International Airport with the dmopment of and refinement of a conceptual program for a new concourse for
are Co endIc Terminal Building. This spatial program, terminal area ramp plan and the Preparation Me
bidding layout concept will mit In Me Mum determination of a Laron terminal facilities. it is anticipated that
this program will be developed in concert with the Federal Aviation Mind shation and in cooperation with
representatives of Me Transportation Security Administration (TSA). Bangor hes expenenced a recant surge
in passenger a dhades Me has requested that these building elements be reviewed and recommendations
provided la Slow the airpa t to strategically position its resources for Ne Mum.
The work included in this project consists of the items Maps In the attached Bask Services and Scope of Mrk
as found in Appendix 1.
PROJECT COST
The project design costs are summarized below: _
Situations Administration
Miscellaneous Expenses
Terminal Area GNdy
Development of Terminal Space Program
Temrinal AHamati am Be mlapmem
Concourse Altemaevas Development
AlemaM es Analysis
5195.300.00
Subtorel........ ...................................... ................. ......._... ........ :..:............................
_................
ADA aund Fire Safety Standards Comallance
ADA Compliance Study -
Fire Alert System Study ,
Fire Suppression System Study
-
Submal............ _............... _....................... .... .................. __.............................
................. _.... .............. 525.000
'See Apperi l for Stag Effort Breakdown
-
Pro' ct Administration
Mise. Project Administration .................... ..... ........... _.............. ........................................................
510.200.00
TOTAL PROJECT COST
,y T.~apawwazMm
The project funding $hall be broken out as described below:
FederalSlam (95%)... ................ .................... ........................................................
_.... ....$220,485.00
StateShare(25%)......................................................................_.........
.... ........................... $5.802.00
TownShape (2.5%) ..... ....... ........ ...................................
............_..................._..._.............5a 80200
TOTAL...............................................................................................................................$232.100.00
PRO3ECTS HEOULE
April 2005
PmlectSoping........_.............. ................. .......
renaryAsessmentL........._._.........................
....
........................... ................ .v................. .mM...ba..sy..F-.S.e..p..t.e
Fn"TFaTrepb.Lb...:................. ....................................................L.
Final Repid.........:.__._........................................
Nhn,ember-Decemter20.35
ENNRONMBM'AL REQUIREMENT
No EnWonmental Review is required as part of t01s pmlee in accordance with FAAOrder 5050 4A
GEOGRAPHIC LOCAIFN
Bangor Intern 5 nal Airyod is located in Me City of Bangor, Maine "a cerdml pad of the State.
207"1NATl N WITH AIRPORT USERS
A
cwawaeiyurmm.ro..isec
AA end
Scope of Welk
8
Estimate of Sla(f EROe— Personnel Hours
sv.w wmep.urosmnmx.m
BASIC SERVICES
--- _..__--- _
-----
Teminal BmlJima S tial Planning md PLgrumninabic Needs Analysis
and Conceptual Levout
Pett LD Callectiva and 1pitim Devtlormmt Concenh
mtradvcdoo
PAwmds and Kelcey has beenrequertedto Martine City of Hangorand The Bangorhnunenond
Airportwith the development of and refinement of a concePmm pmgnam for anew concourse for the
domestic Temrwd Bwldw6. This sWnal Progrm4termival areardmp Play and thepreParaaonofa
bdldwg wyom cwcept will asdstw the lanae dam�minarian ofaviatiov terrvwd facititim. hw
arNopawdtm progmmwiv badevelopedmm w withthe Pedeml Avimiov Ad®vistrmwanal
coopma[imerne mpmaanwnves aline Transporratiw SecurityAdodwstmtim(TSA). Hmgorhm
eeperienceiarecent surge wpassenger activities andbas requnrttr Wcallyse bwldivg elemmh be
the fil re. recomry®dationsProvidedmallow+Leavpw[to snangicalty Position its rewmces for
the Emma.
The overall goat of ibis work program will be to address the following kry issues:
• Coalgmaner often general terminal area end alae idannficatian aeration we6ciencies;
Provide analysis of the eaimwg Passenger Snowiry Checkpoin
Determine the Potential ofPros'idmg adomeanr/irrtemafioaal terminal inter-ccnnecr,
• Evalume the potential to convert demmn ofthe wtematiovd buldivg to domestic operancvs:
• improve Public facilities w the pmt security mvnovmmt;
Address veroo n circulation area between public ver -secure, pest security locsn®s nod the
• ter®nal ramp befaciitme ancient boarding activities.
The veinal coviceptud Plain will be genual in nate and consist of a"bubble diagram" imwded to
illustrate the typical spatial relationships and wNiguravon aline building's interval finctions. Akey
covddaeaov will be the consolidation offmcnans, as well as the use ofpon noW ranne level spaces, to
minimize bwldivg mess.
Tee cmceptw then be refired to the schematic level be illustrate the spatial needs and layom for
secauty erpdpmmf, passenger and bag screening, hoW room spaces, operational spaces, smsidermon of
nAoperations, Potential rmcenam spaces and public toilet 6riliries, Plus the operaeoml and of m
nredsofahlwet anddrlwnsuplwrtfwctions.
Coruidemtion will also be giventntbe aircraft apron, adiaceot taxiway andtmilmer ,'..roma,
remain overwght(RON) aircmftpartivgposinons, passengerloading bridges, operational alccrad ®a,
gromal service Nuipmmt requirements, nod the replacement of or impacts to existing aimdt parking
positions. Also covsidemd as®dement alliin apron exerdse isromawwiv the ability of the airportm
continue i s role as a diversion strtim for Hostrm-Logan and other regional air canner facilities.
ernetional
d�la(LYdT�S
ensure.,.
e
[.8ftinqcrTI.n
rt erminale®C�y
�Deopent
Progmm
BASIC SERVICES
--- _..__--- _
-----
Teminal BmlJima S tial Planning md PLgrumninabic Needs Analysis
and Conceptual Levout
Pett LD Callectiva and 1pitim Devtlormmt Concenh
mtradvcdoo
PAwmds and Kelcey has beenrequertedto Martine City of Hangorand The Bangorhnunenond
Airportwith the development of and refinement of a concePmm pmgnam for anew concourse for the
domestic Temrwd Bwldw6. This sWnal Progrm4termival areardmp Play and thepreParaaonofa
bdldwg wyom cwcept will asdstw the lanae dam�minarian ofaviatiov terrvwd facititim. hw
arNopawdtm progmmwiv badevelopedmm w withthe Pedeml Avimiov Ad®vistrmwanal
coopma[imerne mpmaanwnves aline Transporratiw SecurityAdodwstmtim(TSA). Hmgorhm
eeperienceiarecent surge wpassenger activities andbas requnrttr Wcallyse bwldivg elemmh be
the fil re. recomry®dationsProvidedmallow+Leavpw[to snangicalty Position its rewmces for
the Emma.
The overall goat of ibis work program will be to address the following kry issues:
• Coalgmaner often general terminal area end alae idannficatian aeration we6ciencies;
Provide analysis of the eaimwg Passenger Snowiry Checkpoin
Determine the Potential ofPros'idmg adomeanr/irrtemafioaal terminal inter-ccnnecr,
• Evalume the potential to convert demmn ofthe wtematiovd buldivg to domestic operancvs:
• improve Public facilities w the pmt security mvnovmmt;
Address veroo n circulation area between public ver -secure, pest security locsn®s nod the
• ter®nal ramp befaciitme ancient boarding activities.
The veinal coviceptud Plain will be genual in nate and consist of a"bubble diagram" imwded to
illustrate the typical spatial relationships and wNiguravon aline building's interval finctions. Akey
covddaeaov will be the consolidation offmcnans, as well as the use ofpon noW ranne level spaces, to
minimize bwldivg mess.
Tee cmceptw then be refired to the schematic level be illustrate the spatial needs and layom for
secauty erpdpmmf, passenger and bag screening, hoW room spaces, operational spaces, smsidermon of
nAoperations, Potential rmcenam spaces and public toilet 6riliries, Plus the operaeoml and of m
nredsofahlwet anddrlwnsuplwrtfwctions.
Coruidemtion will also be giventntbe aircraft apron, adiaceot taxiway andtmilmer ,'..roma,
remain overwght(RON) aircmftpartivgposinons, passengerloading bridges, operational alccrad ®a,
gromal service Nuipmmt requirements, nod the replacement of or impacts to existing aimdt parking
positions. Also covsidemd as®dement alliin apron exerdse isromawwiv the ability of the airportm
continue i s role as a diversion strtim for Hostrm-Logan and other regional air canner facilities.
Bangor Inlernalbnal
Airpor! Terminal
Development Program
tmvmimces,
Trial:
ngfie analysis ofeuting termmel supportspa and
npoamta which support the passenger enplmiog and
ge do tothe development of additioml passenger
uking poationa Termnal support spaces that may be
ase tou6guratlm will be ex=dbed t6ldebtify potentia
the ru cafim a[ be fopowivg locations; drop-offcurb
arline passenger tickedug functions, potential from
and queue, baggage clam and make-up we ,veaica
ggage seomty scremh n pre and poa-security passenger
:lased amat ubevisioa systems expawm and depaarue
mgam is depwdmt upon available forma
itis msurued &atAbe City ofBangor bw
purpura
Obtainl t Temaml and Concourse bolding floor plans m Au " or wmpalible forma;
Overlay existing layout ofTe®ne and Apron on avalable aetid photo f purpose of
providing project area deflrdtion;
Review provided Cmcmme devaopmmt plan layeut;
Review and define TSA Seauity Eqi pm tnee&/ spatia raluirmv
Review edsting amidMaodade access and par ng ccnfigmatims;
11. Inlegbe
14. Review ticketing
su me _ winteroperatimal vee&
iwl mrculatian options;
alias;
16. Consider Ahmaft Parkwg Pim for 6 Regional Jet podbons, consider flwbdity for amiapaed
auasft fleet mx at proposed anti adj neem domestic and mtemational gate positions;
17. Caculae impac4 of atemaaves to ramp level f nctom, prirmrily baggage make-up and dmp-
off;
18. Review and Evauae the potentia of providing asterile cmmecdm bevwem the domestic and
Imemaeonal mmina co gmmm, this will regam a review of the current FIS/CHP facitily anti
flows;
19. Develop 3 Altemetives f the lamtim and configuratim of the proposed New Conmmse
faa hty;
20. Review laudsi&saviee veliche' curbside acmes opbom/pwr 4concepts;
21. Overly con^epO„t layor diagams on aerie photo background as ref cem existing
temtinal;
Batgor Mtaxtufbnal ews+e.+
Nrpost Temunal �dr'YdrB�a ""'�
OevelopmeDt hogmm �°K@®t@[� r'°"s
M, Final coofiguratim mcmcouese footprint to marimu ®cccaft Posivom, provide fbrale ity, and
meet anGtipgred broeour spatial calor®®h; and
__�.5vfi:tiiwoyvo_Uhop[des.�sessions wi0v_Aupoct and]SA sfaH '1Lase two seseivvs will__________
have agod afrefivivgthe mmepn Mlemacves avdrmub intheidm anon ofapcefesred
option dwt wilt be advmcedmthe srbooeticlevel forcoordmation afdevedopraent CmMulm
. uooiu h wm Relocal.GcTuTsbu3'fiim.
Deliverable: Asmn d3atternativesthatdepidotrt fa Toro d=dCovcomse Layo cod
Potential mmind bwldlnti needs
tions necessaryto oremihedwdmvibmaa"Bubble DtrN
Poaf will illus[cmerhe spatial needs mdfuoLtloval relmousbips for the activities and ttlwPovntce9wed
fm the bwldivg. This umceptaal, schemaric layou[wJl provide 8uidancefmthesubsequenl '
lardsi 5layoufmomdetaared ba later l[F Ah2Sm mW bwld'mg devatimas, as well as ahside and
lavdaida layouts, to be Prepared ba later desian Phases.
o ATwrm Building Layout or"Bubble DiWarn7' l illusimte the mticiPand soul
seeds and de fuommal rdahovs Mfor the acLntres and equipment re9udred for the
bWdmg This conceptual be,ot will previde pukame for the subsequent devdopmmt of
more detailed mcbitectuml floor dans and building a evetions, as well as ensile eeJ
I ple;r voLb, tote Prepared m 9foream phases.
0 This Plm or be provided in maw+ortnat marp'11 be mdesetabonicfiles larA
Av[oCAD or.dwg format Large formatdmwivgs will be mpresenmlm quality fle
arM ,
mourned mfoammmboardfmdisplaypleelt .
o Abrief spn c xecmvestmmary draped yeas, ass000Mociated
y cvsubmnaland
cmranspecific moo orm oftlae amped apon,A ctocrions,andgenerally
' definepoccess mods , oftheaucrm Pastiv6 apron, adjacent taawayslt�lan6,
tesmindaccess0edSy, oa Progreor f Partingarea
o Provision of detailed gpmal Progremfor We edseng termvet and proposed concourse
addition Thicd ass®t willbdfiagsarin or
at suppmredwirat theterriw
define opemfimal issues, mcludivg surplus or deficit f+metimai eiemaah of the tm®nei
complex. exercisexarreng asummary comparison ofwastivg space and the elemaRe defivNm
the spatial e.
Part II. Tecb®eel Elemwrts Conreot Development
Pcovrde the necessary plarmvg, location and scb®aoc design and don®®team to
my explain the spenal regidremmh for the successful implemenfatior of6me systems,
in the urmval complex, and will wast m the coordmstim am review ofthe
impimentstim ofthis matelot into the cpm Wetimdocunev&.
D-1. Aprovspaceplm
Inclines genmal schematic design and calculators necessary to iaeoeporstethe
fatlowing elements auto a logical cohesive facility:.
Airvaft Posiamiugavd sommve�irig
or Inlernalional £�® �sn.ers
NrpoR Terminal
Al Zs/(BICBQf
Det opmen! Program m vurr
ReviewafeWh m*a gwdmgmddrmvege Pei
Airmalt fuelivguWaccts and Prodmtytc tesmwil banding
-- -----------
Anmiparedlead-ta systems(iaddng egwPmnrt)
-. Gromdequipmvn shging and ParbnG
GrmmdwwNP� tag=auddrvvlstim
Emag®cy e9�npmm[access '.
142, Bagmtge IImdG gSystems
Imludes schematic-]ercl idmtificadm of the prefmrd mudn6 nh ecov nmm
D mnd Naggage Systems
• Syalem Analysis&Dd im
• Ramtng&Physkc Cmfigmadm
Geo Schematic Design Uwiamd TSACoorftn m
Gmemt regwremmts
owm ffi
BquiPmmt rLuaaer m
Baggage chnac[eristia
Pn d Baggage Systema
• System &PhymffiDe Ma
• Roming &Physical CoaSgmavm
Omeml Sch®adc Design Critenaavd TSA Comdivebm
Gm requvemTr<
Operaam & vnintemoce
• 6gmpmmt d�mactcisvcs
Baggage characteristics
IIJ. AircraNAirside Syetma
Prepazaam oFMe prefened locator size, the design aitaiamsd pertormmce
speaficatova tbazwit] sere as the bazis forthe fimI daigq filsricatiov and
vunPatim for the mej or mvWcmam of ®rcraB service systems m the ]ntematmal
Airport Temmal. Ibae ryrtems are:
AircraB rLaracletisecs
• Aizsiddapxm Passenger walkways
• Gromd Sarice Egmpmm[IsymB
Yngor Inbrtwtlonal E�&1�rd�
Airport Terminal nr+v Q�Cey
tlevalopment Program ca•ztr.aa,�
Pmt m Temh ' al Famm� Comrevt Devebvmmt
_.____—___IIL-L—WVSBmdivGB➢Jtmte_ ______ ______________
Pcepar m ofthe design cdada and Pmfomm Vwe cenovs mmmisthm mil
serve az ihebasis iuril SvaT'dcml hMcafioh � imieIIafion for dd ibfee m Jnr
calegorim w'sign�e and HaPbics wthe Ivtemetimal Aupots Tecmimi. Thme
camgodm we
Precescivg Acdvida
• PuWidgovemmmtal
.. Wtmcrtmal
Esabiiab Poe fival daiga cnana (e g. lomnoq typeface, size oflenenng,
pictog
dMn ea)thm will Provide adegaaa ivfowmim fm mmpleaov ofa Emai
edgq febrica4m., and �lffiw} ckaga
• DmmmmemdspecfythelomhmofMm MSdisptays
• Identifieafim ofgeswal sigvage locadm and coMmt
M -i Pmx rPs smg Fatllities E4d Pment
Prepma4oe of Wedmiga cnadaand Per 6o m specimWo mffieP atwill
as tbebmisfmgmw denim,fabdcatimmd'mstell Aigfm a Pmsengee
processing fraBGes/mPupmevt rmryhed m the bvamarioml Avport Temwal. nese
items ere:
•
Ticket Comae SbeWfineda
•
Hag Scslegegvimmaas
•
Avline Back Will [dmri5catim
•
Depmme Lomge Comtms Pylom, Lift Desks
•
Hag Service Office R gwmtmmts
•
Custom @Immigt m Specialty Millwork and equipmmt
•
Scc v Check Poim CmSgm Camgwp�t
�1 Pd®tify Fmtilme/PFrsti gWpmeat Umiquem Airports.
•
Pubhc Seanmg Area FmditmelFizhves
•
Service Amenities
• Telephone ftioska
• IBfm Boodls
• BudvMess Cemars
• Baggage Storage
Bangor Ini ematlonal
Airport Terminal
Bewlapment Program a�p�QSC@� .wnors
• V�/CIF Facility fumitum, hxiums,a�iriea
Pa[ff-V PI dP 'ecallevsl Se '
Terminal said I,mdside Plmrdng—The swig®wt w move the projenfrom the macro,
mm plea levelwisedesignlevel is a process thatshould be wdenakmtoassure
thattheplan i mddmippmametuaarecurievtavdremutheuvatidity. The Srst
step is to review the matter space plan data with special emphasis on the forecast
pass®ger and avaaft projections over the study period.
Af�mal'ng avY necessary adjosmrmta to the fore the space pmgrem should
be uritized and all the mmponemS of the temuoal vaifei Using flus P9astes
Space Concept developed w the preliumaq plaonivg effort as a model, and the
recatly calculsled spew Pmgs%m as aguide, the plan should be revisited to
assure NatmasperawothwsreO Modiflcaflcnswillbeivwrpomtad inwme
mo and ism reviewed withA lambeg STAFF andthe atlivecommitteesbefore
w fie pessentier
NNebest step intlradwayfgpng sys Spaielettmtiovsball begivm
w NeP sngerPmte;and and sines fillsysten5wltilegiving future eaPanvm
ofthe various systems and coocessiays fill creiit within the plan
Vehiculm access, mnomobile paling and airport services sball be visited mncummdy
wrth the teamivval Phalan Prcee^s's. andIII c jmctinn with oflmr members of the team, as
well as wiN A¢tpORT STAFF and Ne airline cmmdtlees.
to cmjanodm with the Wates effort the teal systems, including baggage,
ticketing, infmmatim concessions ®d Ne operational Nuipra®t such as loading
bridges, PC Ah, 400 F potable water and AC service vebicles will be studied sect
Nmougify imegmmd mw Ne plan, as de nersssary by the Owner.
TLe planning process should not cease with cornpletim of approved plm bet, as
pmviotety m®iob4 should continue and be revisited m least once dmmg the design
avdcros beseofthepmjec[ mNdielogueb dealt
plmroughom he Pojewhepwmus hnedue c ntimg
opetabobst passenger, gowd tnvsportatiov mdahcmR prof
e
miulim _
Ow appmach to finalizing a recommended Conoome development pmgrssis is a two-
stepprocess.Fims willdeelopwcovcert Staffthegoalsandobjavwwbe
considered. Examples we level of service, airline operations, vReld efficiency, cost,
fimamii opums, and fiNne opseatioval fledbibbe as well as be visual image of the
obj nvw pp umdmlimapcopfsval Programindifferemways.Neer Nese
objective areprioritizedandaniovdof to altemativescheme understood
f�rytheview and
presentationand e, ootieeot approvalofWewmminen Itisswdestoft bythe
Coss a tlm Ne wm o dal[clerneot effort coot remain wgnizem of thetotalbuilding
volume and the owners overall desires.
!angor Infnmafbnal
Ai RTemlinal
rpo ^�°KGS®Ce[J
Development Pmgmm enaeemOm
We wih evaluate!base sdhemes fegar beg Warabiuty he accommodate projected
psswgarvolmpes, MM4 operatives, Provide user comeaiw Potential, pbaang and
ope%bb® bnpzcs, w well as scbe"e and a hed WW toss. These abxamWbvwm
well as a rewmmeaded Plan will be presented to A ORT STMF.
ghef product will be We development oftha peefb a alternative, as selected by the
appropfiarewwrni e. Arecommwded devaopmentsfieduce and statement of
probable tort for each phaae m elemon[ will be defined. Plans anal supporting den
apprwnate for ORT STAFF b&hvwW We design team will be completed. Om
work will be closely coordinated with the City W maximize and mdize aveRable fording
smmces such as PFCa, bond finding, Aldine parricipabom and AIi RT Staffs gemmi
fesoinces.
ComrmnerA hbob were made respectable in the 19705 by integrating War operanens
with ma wcamms, and are currently opamtng mthe Bmprhhtervelioval AirPmt
They have developed inn a safa reliable, cenvoeieat and econmacW Wtenmbve Wjet
oPeratm on short and medium singe lwgth romp. M mjor tamers have developed
rWWimships W mym m oeta with wrmpmer carriers WpWvde miditonel service
desenaemis for Weir passengers and thus gain addivonal feed fm twir long baW routes.
Tbia aspect regWeez close attention dmurg the planing pnecess, as well as PO[wRW
expaysiw of regiwa cnfiers, onmwtmvs. Cwwurse Wmmatives will give
appropriate Monaca m the City ofBaugor's deavem develop aflvble f ity focused
on serving Regional Iet aumafland the dean W pmvidepwsengwbomding bodge
so," and relined inpats he buibbng sill beighs and wmsponi ing romp aevadens.
Conceselm plamuwg Qp9ommites have, is re Yeahs, become an integral pan of the
bomab W planning Process bad idrn ed as an important r eine source for aupoel
OwnefslOpmatom, haaoence boa sbovn that effective W elan! wneceaom
complement rather that deuact Som the madtstmW a 'mmnem, and fill an imPmtUa
nmd for the mvehng public. Wel4 ned cencessiws can aso pfpduce subs*mvW
sevwue5 toesP b corerminalp jam Menne Plabb mtea s swdm[wnc®siomi
plamivg doesrwtbecomeav afterthonghtm We Planning Amass.
Security, including passenger and baggage sefendng s beconiag more wmPlac each
year. MschadWed tamer baggage must be poeitivey srxenedfwcovnativg smviceat
oW aiT sdw Wnew TSASMmtyrNmemws. Chaftmor N&HtbWbaggageand
Perhaps even all doraestic bap tie cuuently required W bestrewed There may boa
time.whw nems m We W W wmplwr may requim positive scremiog forboth passengers
rod bags. Hmutg succ¢siWty deallwiWWeresawiry issu�verenwt Pmiear
provided
potwiW Wenecersary ivaghtm effa4velY Planfm currem as wellaz
wtia fiatat fugue relvvemmts.
Bangor Inlemational o-a•ee..
Airport Terminal aKe
A�{ie{CL Sf a4 Mss
Development Program crosaryeara
]3C will ivcorpomte ablawed fa ly Pftilacphy Wow renoivel Plmving approach
lfisunmc ilrm all lemmre ufthevumivalcomplexrmaln inblmwemm emhoMu
mg &d sof Wo evw-cbm®g®rlivercgmme
Project Delwmblm:
1. A plm ofimplwnmmtion mfolly develop aNew Passenger Cmcowseto supporttbe
exit gtemivlpm�wbuildivgfwtlef . hwludedwillbedeMowivg:
Damned sch® c plans of all interim and fowl Co gwa _
Phasing plain and diagrams for the P� devlopmmt alternative
Any XoposM.modifications and or x6nemmn to timed facJities such as the
cmco=M rmrp mm and othw r lured bwldings md/or fmcnons'.
Opnms if aPPm =for
Ticketing
• Ticketlobby
Cimu mt
slm ihvmticlh ocol
• ons/1'oflets as tbwy eyrelme to McCmcoursefecility
PwSmgsmger Sem P check Poims
Baggage IDake Uup and procpsivg (iv -line)
•
cOffic®aovGg�¢avonfiz spm -
• Ramp
2. Aspme Pmgem idmtifyingthecapacityofWeexisangterminalprocessorfttility
(with pope rmpdific gpmidhrgtrovmmpphttams of
• AircmRPazl�ng Pwitions item support
• Comidemtion afpomnrtl fwmcommodation of flexible ahwaR mix
Peakhowpaaseugem rbffi cm be pmcess�
Amomt of ahflld caPaaty item support
3. Cmclu =&Recommmdatims.
• Wni rVmmdsummmyoffindwgs
C aplricpcesevmtion ofdevelopmmt Alternatives (3)
Pinel Pr on TgoavavveingchematicforCmtfwrnm
• Coordination repottwith tacal Arcktat forCmcepmal Appeamw
Owwwk effort will gmwlly compriseffiefonowiugmsk elem®m:
Data Assiml M&Review
Airfildwpaity
Eristingtervvvlcoion
• Exismtgmmvval capwityechy
•. Existing mmrimloPwatim
Bangor Infer atlonal
AiryoR Terminal
Development Program e��Cey ee,b+crs
' Dommenta4w of exiting temp arm apemtimavlrme terisecs
Rel�wadp ofexiaing immioslmNew Cwcmuse developmml plan
_ _ �-6wbsideacaviWaeveFsaed-Bess®%a dlsFn§unoe---_—
APProech roads ac¢vity charact®sdcs for arriving and departing
Pasflmgea
Sp psogamming-DemaudFCapentSA ySis:wilidefivetheexisnngtnr d
bmldmg capacity and mpu of the proposeddevelopmmtscmazio_
Ev WF ly Review &iteg m imo each proPosed mo ficaam: will
ideafy and qw Ufy imp to exisnng faalities and opraaoro of the proposed
improvemmn.
Schemadcplandevelopmertinetndingopdom:wJ da6wthemodific m
amcesary m the carat operatima con5gmalw and Provide We decals
na say m move dm pmgrmP compmm fOrn dmthe development of
cmanscfim docammnriw.
Phamg Plm development will provide she basic implemmianm process and
opnavmal impaca t gyr mg mvsidraew for we developmaa of @e
pmfe almmaive.
FO Presaaanon(s). adg servem*Le comwmic w Process fm commwica g
the selttted dwalopm®t atrneCvem uvuested pazties and agencies.
Rem®md&oa(s): wJl ba providedas awriltm dommmt ma will catalog the
rlrrwoto®cal process oMemarm and pmmdejasMcwm fm and de pion of
the development process.
��N,�lr=
EXHIBITS - ESTIMATE OF STAFF EFFORT -PERSON HOURS
for
Tarmival Area3lmty .__. ____-------
..... _. AIP Project No.}2}000542
m
Rmvr lomronionat Airport
Bmgor. Meioe
summ&RV
ARTICLE A
Site Dam Procmmilsonr
Nn in Contract
ARTICLE IN
Tmmiod Arra
5195,300
ARTICLE B2
ADA ttercl Piro SdM StmdmN liana
Admrrising. BlMl'mgnntl Artergem is for Conswainn
525600
Nor in Concoct
ARTICLE
ARTECLE D
Roect Admjoj eoa
$10;200
ARTICLE
Cameral COnmrvction Adininiaudon
Not in Convocl
ARTICLE
Rusdcnt Engncenng
Not In Coninct
TOTAL
SMIA0o
a
&4TNI OF5TAF MOHT-P ONHOM
TERbID:AL AREASIUDY
pRnI B2 - D& GN, DRAWIl AND SPECpICAUONS
i0iP1PATRUV:
51.015
NW
_ _: R__ _
wtl Cwvtas4m
PROIEC!
PRWC@AL
MO=
MSNA06R
8
ARC®IFC!
8
E4FL.
PNGII198R
P@BPROT ACNM.
6MSW6P8 nS61.PPNlf
8.
TYPN.
papnypnpyq ete:
reol0pmn;
55W0
N
Oo
PAYROFF O]ST.
517,895
9h0.bPm®vwl
ADAfmPll+ua
16
-
I6
Pv¢AMBy[bm SOWY
16
-
16
Fve 3u SY^�SNAY
-
I6
-
16
mlPlm
AOACw - a3mi
I6
8
A2nbe6yv¢m16�
age
QAQA /Q
'M1YIALNOVPS
16
8
W
I2
168
%AiF3
S60.W
H650
SIS.W
X]OW
315W
SID.EO
PAVRtl.L
i60
WM
SI.M
$I'm
SI.CW
SSW
5].011
�4ID®
i0iP1PATRUV:
51.015
NW
A
NWJldgmg:
SI'WO
OIRRFIGM(ISSL%)
510.803
papnypnpyq ete:
reol0pmn;
55W0
N
Oo
PAYROFF O]ST.
517,895
wlewlam.rw+ls'
PAIunA,EO Acnlumsc maw
FVYDF68 PATNFNr(1594): 5;6H
B3
ESTIMATE OF STAFF EFFORT -PERSON HOURS
TEftI..>QJALAREASftIDY
• � 1 II �
TOTACPAYROU: $3118
OVAA}IEM (155.31%): N,fli9
P�ivtiog, Papeg. atc.: 51.W]
PAYROU COSL'.
0
loommor; Mod
S15 MSMS:
ES@ =ACNACCAST: "B 51
PWi PA]T18Nf: 51,194
Torel M: SIOAD
TOTACPAYROU: $3118
OVAA}IEM (155.31%): N,fli9
P�ivtiog, Papeg. atc.: 51.W]
PAYROU COSL'.
0
loommor; Mod
S15 MSMS:
ES@ =ACNACCAST: "B 51
PWi PA]T18Nf: 51,194
Torel M: SIOAD