Loading...
HomeMy WebLinkAbout2005-05-23 05-167 ORDERItem No. 05-167 Date: May 23, 2005 Item/Subject order, Establishing Easement in Me Main Street Right -Of -Way for New Police Station Circulation Driveway Responsible Department: Engineering The new Police Station will require construction of an interior circulation driveway In front of Me existing building that will be renovated as part of the project. Because of the proxlmlty of the existing building W Me Main Street Right -of -Way, Me new circulation drive will enovach into Me Main Street Right -of -Way. In order W receive site plan approval, Me applicent (Gly in this case) must have title, right, or interest In all property affected by a pmW. An easement for Me circulation drive in the Main Street Rightrof-Way, will meet this requirement In conjunction with construction of Me driveway, Me sidewalk will be relocated to maintain a continuous pedestrian route on Main Street The circulation drive will not Interfere with public uses in the Main Street right-of-way. The attached Order will establish Me necessary easement A location sketch is attached. Department Recommend approval City Manager Assoclated Information: Omer Budget Approval: Segal Approval: Rnance Director d04 X Passage _ Frst Reading Page _ M_ Referral 05-16] � r Asaigoed to c iloi Allen My 23, 2005 CITY OF BANGOR On .) Order, Establishing Easement in the Main Strut Rgh[af-Way for New Police Statim Orculation Driveway WHEREAS, the new Bangor Police Station will be constructed an a she bounded by Pord0rG of Main Street, Cedar Street, and Summer St; and WHEREAS, site constraints necessitate locating part of an Interior circulation driveway In a portion of the Main Sanest Right -of -Way; and WHEREAS, site plan approval for the project requires that the applicant have right bids, and Interest in all areas affected by the project; and WHEREAS, the proposed interior circulation driveway will not adversely impact or interfere with public uses of the Main Sheet Right -of -Way; NOW THEREFORE, BE IT ORDERED that an easement be established in the Main Street Rlghtof- Way for the purpose of constructing, using, and maintaining a circulation driveway for the mw Bangor Police Statim, said easement being bounded as follows: "BEGINNING at a point on the southeasterly sideline of Main Street located 420°90'38 of and forty-four and zem hundredths (49.00) feet from the intersection of said southeasterly line of Main Street w8h the mrtheastedy line of Cedar Street as shown on a Boundary and Topographic Survey of he Bangor Pdice Deparrmit, prepared for the City of Bangor by Shyka, Sheppard & Garter, land Surveyors, dead Decernher 19, 2003, last revised April 11, MIS, project number 03-133; THENCE N20653'54V, twenty and four hundredths (20.09) feet to a point; THENCE NXW38T, one hundred (evenly and ninety-five hundredths (120.95) feet to a Oda; THENCE S69019 "E, thirteen and thirty hundredths (13.30) feet to point on said soul astedy Ilan of Main Street and the most xesterly comer of land described in a dead W Merrill Merchants Bank dated! April 16, 1998, recorded in the Penobscot: Registry of Deeds, Boric 601, Page 215; THENCE 52004038V, am hundred thirly-Me and nlne"ur hundredths (135.99) had W THE POINT OF BEGINNING. Containing 1,078 square feet, more or less." IN CM COUNCIL a tlay 23, 2005 Paaaed p 05-167 n ORDER DEPOTY CI ta631eingot in the NaiuI1MgAq az Mev Po ce Station Circalatioo Drly m0geea on councilor � (plain s uCd�e"� NOWS T _kk __.. i ��- v WBRC ,6= c _ _.