HomeMy WebLinkAbout2005-04-25 05-133 ORDERRem No. 05-133
Date: e-353005
Item/Subject Order, Awarding Contract for Hancock Street Resurfacing Project, PIN
11511.00
The attached Order authorizes contract award to Lane ConslruNon for the Hancock Street Resurfacing
Project This is Project No. 11571.00 In the MDOT Biennial Transportation Improvement Program and is
one On number of Bangor projects approved through the BACIS process. Federal/State funding in the
amount of $310,000.00 is available before a local math Is required. The project was developed by the
Engineering Department to expedite construction and involves pavement grinding, resurfacing, granite
Curbing and related work from Washington Street to State Street:
Two bids were received (Bid Tabulation attached) with Lane Constfuctlon submitting the low bid of
$307,516.00.
James D. Ring, PE-Diecto
Department Head
Mange's Comments:
Recommend approval as does the Finance Committee. 7 u®Aw
City Manager
Associated IMormation: Bid Tabulation.
Budget Approval:
_m: V1
Legal Approval:
City Solicitor
Introduced! for
X Passage
_ First Reading Page _ of
Refarml
05-133
AssignedWCaunrilor Greene April 25. 1005
_ e
CITY OF BANGOR
(TITLE.) Order, Awarding Contract far Hancock Street Resurfacing Project— PIN
11571.00
BE IT ORDERED BY THE CITY COUNCIL OF THE CITY OF BANGOR, THAT the Contract
for the Hancock Street Resurfacing Project— PIN 11571.00 -- is hereby awarded to the
Lane Construction Corporation in the amount of $307,516.00.
is CIW MMCIR S
Apr 1 25, 2005
r ¢d p 09_133
0 R D R R
(TrrLE,) Aaarmae Co racy for R "Ck street
Reeurfacavg.p Jecc
9AXU
City of Bangor
80 Tabulation - Hancock Street Resurfacing
Bk Opening 04113105
[Raitruction Corp
e Lane Cons
Merid
Vaughn TM1ibatlaau&Sons
Banner,
Maine
REM
DESCRIPTION
CRY
UNIT
UNIT
PRICE
AL
CE
UNIT
PRICE
TOTAL
PRICE
1
202.202 Removin Pavement Surface
14000
SV
2000000.oO
.2.50
$35.000.00
2
202.203 Pavement Bull Jolnk
60
SY
?,000200.00
3.50
$210.00
3
20320 Common Excavation
60
CY
4500]00.00
25.00
$1,50000
4
304:10 ate Subbase CoursaGravel
65
CY
70.00550.00
50.00.
$3.250.00
5
40320]314' 19mm Hot Mix Asphalt
140
TON
]500500.00
75.00
$10,500.00
6
403210318" ibmm Hot Mix As ha0'
- 1750
TON
42]5812.50
4600
$]],000.00
7
403209318° 45mm Hot Mix Asphalt
120
TON
10000000.00
125.00
$151000.00
8
403.211 Hot Mix AsphaltShim
70
TON
80.00600.0
8800
$6,160.00
9
409.15 Bituminous Teck Coat. A led
700
GAL
300JOT00
325
$22]5010
604.092 Catch BasinT eB-C
1
FA
- 3,400:00,400.00
5,00000
$500000
11
604.161 Allerin Catch Basin
2
FA
800.00,600.00
100000
$2,OW 00
12
604.18 Pollution MH and OB to Grade
16
EA
450.00
$7200.00
35000
$5,601100
13
60911 Vail Curb Te1-Graile
1890
LF
28.00
$49140.00
31.07
$58,]2230
14
609.234 Terminal Cut Type 1 L4 fou) -Granite
6
EA
200.00
$1,200.00
114.78
$688.66
15
609.237 Terminal Cut LrEe 1 ] fool - Granite
16
EA
246,00
$$840.00
204.96
$3279.36
16
609.31 Curb Type 3, Maid 1
765
LF
6.50
$4.972.50
4.50
$3 442.50
17
609 38 Vertical Curb 1-GramnsT enwve & Reset
2375
LF
18.00
$42 ]50.00
25.20
$59,850.00
18
615,07 Loam
160
BY
40.00
$7,68000
30.00
$4,8000p
19
618.13 Sibeaffing Method No.1
20
UNIT
2700
$540.00
39.00
$70000
20
619.12 Mulch
20
UNIT
10.00
$200.00
39.00
$70000
21
627,7114- Mile or Yellow Pavement Mauritania Line
3170
LF
0.50
$11585.00
0.50
$1,58500
22
62]]5 White Or Yellow Pavement & Curb Markin
1264
SF
150
$1.896.00
090
$1,13].60
23
629.05 Hand Labor
10
MH
2500
$250.00
32.00
$32o.110
24
031.12 All Pu ase.Eesavatdr
5
MH
130.00
$650.00
11000
$550.00
25
631.172 Truck -Lare
5
MH
50.00
$250.00
4700
$23500
26
652.36 Maintenance of Traffic
1
ITS
8,500.00
$8.500.00
81,000.00
$10.0000D
27
652.38 Manner
1000
MH
13.00
$13,000.00
18.00
$1000000
28
65910 Mobilization Not to exceed 6%
1
LS
1]400.00
$1],400.00
19659.00
E19,8590p
Total Bid Amount:
$30]516.00H
1
$347,324.44