HomeMy WebLinkAbout2004-12-13 05-35 ORDERCOUNCILACfION
Item No. 05-35
Date: December 13, 2004
Item/Subject ORDER, Authorizing Execution of a Professional Engineering Services Agreement
with Edwards and Kelcey for Design Services for Construction of De -Icing Wastewater Collection
& Disposal System
Responsible Department: Airport
Commentary: As the result of increasing environmental awareness of fluid used at airports far
deicing operations, Bangor International Airport will be constructing a De -Icing Wastewater
Collection System. The total cost of the design services is $139,400. The Federal portion is
$132,430, State and City portion is $3,465 each. The City's portion Is Included in the Airport's
budget.
Edwards and Kelcey is the Airports designated engineering firm for all Airport Improvement
Projects.
Rebecca L Hupp
Department Head
Manager's Comments: This has been reviewed and recommended for a proval by the Finance
Committee.
Arit City Manager
Associated Information: Order, Memorandum
City Solicitor
Introduced for
x Introduced for Passage ,
_ Fiat Reading
_ Referral
Page — of _
05-35
8^� fiWan9occom
INMONNGOOPR AIRPORT
Iateruf ice Memo _...
Tc: Fianna Committee
From: Rebecca Hupp
CC: Debbie Cyr
Ed Barren
Dave Pellegrino
Re: Construct De -Icing Wastewater Collection & Disposal System
Bagineering Agreement
Date: November 15,2004
Increasing enviromnemal awareness ofdeicing fluid used at airports for deicing operations
has triggered the Bangor International Airport to undergo the construction ofa De -long
Wastewater Collation System. - -
The Airport is requesting authorization to execute aprofrtsibnel engineering services
agreement with Edwards and Keh ey (E & K) for the Contraction ofaDe-Icing Wastewater
Collation System. This agreement will be funded througb Airport Improvement Program
(AP) with 95% Federal funding, 2'. % State and 2''A % Airport. E & K is the engineering
firm awardedwe contract for all All? Projects m the Airport.
This is the second phase of the deicing containment pmjm.
The Airport is requesting don this agreement be approved for a total of$139,400. The
Airport sbare bas been budgeted. -
RH:sg -
6
28]CMhey WulevaN, Panga, MF 00901 U5A Tel.20].94].03M Faa:20].945.360] adminestybangoccwn
ne=i®wiw councuor casnveu December 13. zooa
CITY OF BANGOR
(TITLE.): order, AUth0rbJnQ BeoUtion OF a Professional EnQlneemm Services
Aoreement with Edwards and Kelcev for Desion Semces for Construction of De-Icirw
Wastewater Collect'
By the Gly Cowrc//of the plyWeanyon
WHEREAS, the City wista s to construct a De -lung Wastewater Collection & Disposal
System at the Bangor International Airport; and
WHEREAS, Edwards ® Kelcey is the Airport's designated engineering firm for all
Airport Improvement Projects; and
WHEREAS, Federal funds will cover 95% of the cost of the project with an additional
21/2%coming from the State of Maine and 2 1/2% from the Airport.
HOW, THEREFORE, BE IT ORDERED BY THE CITY COUNCIL OF THE CIT' OF BANGOR
THAT, the City Manager and/or Airport Director be authorized to execute a professional
engineering services agreement with E @. Y. to Construct De -Icing Wastewater
Collection 14 Disposal System.
IN CITY WMCIL
Decenber 13. 2006 0 Oa 'S
Motion Made a" Seconded for
Peso e
gas 0RDeM
// pg t� MTLEJ Authorizing Execution of a
Professional engineering Service Agreement
with EMarda and &elcey for Design Service
for Construction of De -Icing Wastewater
Collection o upon ys en
Assigned 0 CsenclW ✓