Loading...
HomeMy WebLinkAbout2004-11-22 05-29 ORDERItem No. 05229 Date: November 22, 2004 Item/Subject, Contract Award for Construction of a De -Icing Fluid Collection System at the Airport Responsible Department: Airport/purchasing On November 10, 2004 the City received four bids for the construction of a de-icing fluid collection system at the Airport. The bids ranged from $1,0]4,]23 to $1,40],]10 and Sargent & Sargent of Hampden was the low bidder. This underground holding tank will allow the Airport to meter out the captured de -ming full to the ❑tys sewer system and lessen Its Impact on the TreaMent Plant. The contract also includes a trailer -mounted vacuum and snow melting equipment The total cost of this project, Including the pre -purchase of the box culverts for $236,952, is $1,311,675. Funding for this AIP project will be 95% from the FAA, 2+h % from the MOOT and 21h %from the Airport. On November 22, 2004 the Finance Committee reviewed the consouc0on of the de -Icing fluid will system and approved the above recommendation to award the contract to Sargent & Sargent In the amount of $1,074,723.00. WartmerR Head Managees Comments: Associated Information: Order, Bid Tabulation, Award Recommendation City Manager I� FlnanC¢ Olrector Legal Approval: i olidtor Introduced for X passage _ First Reading page _ of Referral 05-29 Nuve er 22. 20" Grafi ck CITY OF BANGOR (TITLE.) Order, Authorizing Conrad Award for Construction of a De-Idng Fluid collection System at the Airport By the Qty Courx'N of tl1e City ofBMgw..• ORO O, That David N. Pellegrino, Purchasing Agent is hereby authorized to execute a contract vitt Sargent & Sargent of Hampden in the amount of $I, 074,723.00 for the consWcton of the de -Icing fluid collection system at the Airport. CITY CO TL ember 22, 2006 4 Iw Made and Seconded p 05-29 QITLE,) Autborltfng contract Award for Construct o a De-Ic Pl d Collection System at the Airport 05-295 Wov er 22. 2004 05-29 sweater 22, 2004 r' CZTYOFBANGOR (_ '$ AWARD RECOMMENDATION BID TTEM(S): D Icing Fluid Collection Svstenn DEPARTMENT: Airport BUDGET REFERENCE: Requisition No.: NIA Aoceunt Number. 8562-9100MO Budgeted Amount: $ Available Balance: $ Total Amount of Award Recommended_ $ 1,074,723.00 Vendors Recommended: Sament & Sarcent Number of Bids Sea: 12 Number of Bids Received; 4 Date Advertised: October 29 2009 Bid Opening Date: November IQ 2004 Past Experience with Vendor.. XExcellent_Good _Fair _Poor_No Pricer Experience If no experience, references checked or other method of vendor reliability established OTHER COMMENTS: Award the bid for constructing the de-icing wastewater collection and disposal system to Sargent & Sargent of Hampden, the low bidder at $1,074,723.00. This Is an AIR pmjed which Is paid for by Bre FAA pickng up 95%, MI OT 2.5% and the Airport the remaining 2.5%. This contrad award recommendation must he reviewed and approved by the City Council as it Is over $100,000. Fina in#rtrt#rtY#kk#rtkkkk###k###k###rtrt#x'.lkrt###kk####kt#rtrt#kkk###k#.#rtrt##rtkk