HomeMy WebLinkAbout2004-06-14 04-159 ORDERItem No. a—isy
Date: June 14, 2004
Item/Subject Order, Granting Utility Lacetian Permit W Bangor Gas Company, LLC for
Insrallation of Natural Gas Distribution Mains
Responsible Department: Engineering
Commentary:
Bangor Gas Company has submitted an Appliwdcm and Lpwtion Plan for installation of a gas dlstribmlon line
in Ube fallowing street Gilman Road from Stillwater Avenue to 1100 linear feet west of Stillwater Avenue.
Approval of the Utility Location Permit Is subject m further reNew by Engineering prior to Issuance of any
Street Opening Permits from the Engineering Department for construction.
NOTE: No separate public notice of this application is to be made.
department ad
Manager's Comments:
City Manager
Assoclated LNormatlon: ONep Locadon PermitApplicadon
Finance Director
City Solicitor
Introduced for
Passage
_ First Reading Page _of _
Refimal
o4—Is9
Qlpvk�
AssiK ld a councilor Cashvell Cuue 14, 2004
CITY OF BANGOR
011
(TITLE.) Order, Granting Utility Location Permit to Bangor Gas Company, LLC for
Installation of Natural Gas Distribution Mains
By Me City CWW1 of Me Ory GFBangor:
THAT, the City grant permission to Bangor Gas Company to place and maintain
burled pipes, valves, caps, valve boxes, manholes, tracer wires, warning tapes,
other fiaures in, along, under, and across work to be come on Gilman Road from
Stillwater Avenue 1100 linear feet west of Stilwater Avenue.
BE IT FURTHER ORDERED, THAT this Utility Location Permit be in a form
acceptable to the City Solicitor, and that all work be done in aa:ordance with the
CII Street Opening Regulations and oder requirements of the City Engineer.
# 0 159
ORO6R
tj,8,5,G! ting Utility Lo tiau Pe?it
Be goias
of Natural Gass Oistributiw Melva Pe?
PUIgnMto Cou�ndioorr,(n( i.���!(/(u/y
v1UCJs'�•\ '
Bang oGas
711. Natural Choice
LOCATION PERNDT APPLICATION
FOR
BURIED NATURAL GAS PIPELINE
To the Bangor City Council
Bangor Gas Company, LLC respecOvely requests permission to place and maintain
buried pipes, valves, raps, valve boxes, manholes, tracer wires, warring tapes other
fixtures in, alon& under and across portions of the surf of the public streets and
highways as fmdler described in the attached table titled "Location Permit Request".
The above referenced pipes and other fixtures will be placed in accordance with the
enclosed plan shoes. The plans are prepmd on Base Maps generated from aerial
photography. The aerial photography was taken on November 18, 1998.
In conjunction with this location application, Bangor Gas Company, LLC also requests
permission to place and maintain the previously described pipes and other fixtures in,
along, under and across the above intersecting public ways for the purpose of making
connections with such other portions of the natural gas distribution system and buildings
as may be desired for the purpose of distributing natural gas.
Respectively submitted by:
an as ComLV/
June6,2004
City of Bangor Location Permit Approval
Date:
ME= M - &nawlN m-W02L%0 %m e'. 12n919n 9595,E 129191h0101
Fm wenigNd.Fvy'21 MaIn51.cY.6an�NaIm0U01
04-159
LOCATION PERMIT REQUEST
FOR THE
INSTALLATION OF NATURAL GAS DISTRUBUION MAI
WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OF THE
CITY OF BANGOR
As an integral part of the development of the natural gas distribution system for
the City of Bangor, Bangor Gas proposes to install polyethylene natural gas
systan piping within the mad and street right-of-ways acwsding to the table
included below. The pipe materiel will be PE 2406, medium density polyethylene
gas pipe. The pipe color will be yellow, in compliance with the mioml color
code stsndardsfi utilities. The pipe will be bundled by baschless and/or
conventional upet-cut ditch methods as best suit each lacation. All gas mains
will be installed at a minimum depth of time feet bellow the finished surface
grade. Ref tothe attached plans fn details of the imposed comunction.
Proposed Location Summary Table
Location
From
To
Linear
Feet
Gilman Rd.
Stillwater
1100' West of
1100
Ave.
Stillwater
Ave.