HomeMy WebLinkAbout2003-11-24 04-19 ORDERItem No. 0!_19 Date: 11-24-03 Item/Subject Authorizing Execution of Amendment to Contract for Professional Services with Carol R. Johnson Associates, Inc. Responsible Department Community and Economic Development Commentary: This Order would authorize additional services under Amendment #5 to the Gty's contract for design and engineering services with Carol R. Johnson Assodates Inc. These additional services would include S. W. Cole Engineering assisting CUA and their engineers with geotechnical analysis and recommendations for Me sheet piling and other structural components of the Water's Edge project. The intent of this work is to strengthen areas of the bulkhead to allow for the construction of a docking facility for larger vessels, such as the cruise ship which currently home ports in ganger. Bourne Consulting Engineering would provide design development, bidding and contract documents, and construction phase services for the docking facility. The total cost of these additional services would be on an hourly basis with a not to exceed amount of $76,425.00. These additional design and engineering services will be funded through the Community Development Block Grant Program. To date, costs have been less than anticipated on other aspects of this contract, and acididonal funding over and above that already committed firm the CDBG program will not be necessary. Department Head Manager's Comments: This has been reviewed and is recommended by the Business and Economic Development Co220 q mmittee. d City Manager Associated Information: Budget Approval: A�IW Di 6or France Director Legal Approval: Cily lidtor Introduced for X Passage _ First Reading Page_ of Referral M-19 Assigned WCourn for CasMrell Novenbev 24. 2003 .. CITY OF BANGOR (TITLE.) Order, Authorizing Execution of Amendment to Contract for Professional Services with Caro] R. Johnson Associates, Inc. WHEREAS. Me City entered Into a Contract for Pmfesslonal Services with Carol R. Johnson Associates, Inc. (hereinafter`YR]A") dated April 18, 2081; and WHEREAS, Me Cornell was amended he provide far design services related W West Market Square by amendment dated August 1, 2001; and WHEREAS, Me Contract was further amended February 12, 2002 to provide for design and engineering services for the public areas along the Penobscot Rivers edge from Me Chamberlain Bridge to the end of the new sheet piling bulkhead, the land anew along Front Street from the Chamberlain Bridge he the Railroad Street rail creasing, and Me land area connecting do vabran with Me waterfront; and WHEREAS, Me Contract was further amended May 14, 2002 W euparal Its scope to provide for 100% design and engineering services and preparation of bidding and construction documents for Front Street and Front Street parking area and for additional engineering services related to Me bulkhead to be performed by Bourne Consulting Engineering; and WHEREAS, Me Contract was further amended July 2, 2002 to further expand the scope of Me Contract to provide for 100% design and engineering services and preparation of bidding and construction documents for the Railroad Street corridor; and WHEREAS, the Contract was further amended March 12, 2003 for design and marine engineering services and preparation of bidding and construction documents for Design through Construction of the Wateses Edge area along Me full length of the existing bulkhead sheet piling; and WHEREAS, the parties wish M further expand the scope of the Contract to provide for additional services for Me Waters [dile to include geotechnical analysis and recommendations fer the sheet piling and other structural components of the Waters Edge project and design development, bidding and contract documents, and construction phase services for the floating barge; NOW, THEREFORE, BE IT ORDERED BY THE CITY COUNCIL OF THE CrrY OF BANGOR, THAT the City Manager, is hereby authorized, on behalf of the City of Bangor, to execute an Amendment to Me Contract for Professional Services with the consulting firm of CRJA which will accepting its "Waters Edge: Proposal for Additional Services For S. W. We and Boume Couching Engineering" dated October 8, 2003, such Amendment to be in a final form approved by the City Solicitor or Assistant City Solicitor. Em Exw COD0CID PovemLez 24. 2003 Peeved// # Ol?19 ORDER an CL® (TITLE, Authorizing fte cation of nmeadaeac I Co ServicesCh Mrol R. _ ]ohveon deaociatea, IDe. a»ieoed w Co9eumr