HomeMy WebLinkAbout2006-09-11 06-316 ORDERItam no, 06 316 Date: September 11, 2006 Item/Subject Order, Aubhorivng Contract Award to One Construction forthe Franklin Street Area Sewer Separation Project Responsible Department: Engineering Commentary: On August 16, 2006, bids were received for the Franklin Street Area Sewer Separation Project The project consists of the apprmimately 13, 000 linear feet of new sanitary sewers and stone drains and the installation of new 6" seMce laterals to approximately 110 houses and commercial buildings in portions of Franklin Street, Spring Street, Carter Street, Newton Street, Center Street Avenue, Cumberland Street, Essex Street, Pine Steel; and French Street. The attached Order subscribes contract award to the ew bidder, Lou Silver, Inc for the Base Bid amount of $2,592,291.30. A tabulation of bids is attached. ✓l7 Departmenit HiEsd ,.a„aae, aw,,,,..W” a. Recommendappioval. City Manager Associated Information: Order, Bid Tab Finance Director City Solicitor s Passage _ First Reading Page _ of Referral as 316 oosigtoed to C ci ar Farrington September 11, 2006 fk CITY OF BANGOR (TITLE.) Order, Authorizing Contract Award to Lou Silver, Inc for the Franklin Street Area Sewer Separation Project 6y the Ory Obundl of Me Ofy of8af .- ORDERED, THAT, the City Manager is hereby authorized and directed to execute a contract with Lou Silver, Inc. in the amount of $2,592,291.30 for the Franklin Street Area Sewer Separation Project. A "-AIA O R RR (TITLRJqufLoivinK Contract gwid to iao Silver, Inc for the Franklin Street Area Sever Seavratlon Proiect A WbCaux6rca&v4k!--� City of Bangor 06 316 Bid Tabulation - Franklin Street Resurfacing Bid Opening 081 Lou Silver Inc. Vehicle, Maine MacMillan Excavation, LLC Ben or, Maine ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Trench 8 Structural Rock Excavation Explosives 500 CY $ 0.01 5.00 0.01 $ 5.00 2 Trench 8 Structural Rock Excavation Mechanical 250 CV $ 200.00 $ SO,O0000 $ 200.00 $ 50 000.00 3 Pn�Blast Su 165 U 0.01 1.65 0.01 1.65 4 Excavation and Replacement Backfill 200 CY $ 25.00 $ 5000.00 15.00 3000.00 5 Excavation Below Normal Grade and Replacement 100 CY $ 25.00 $ 2500.00 -T-0.01 1.00 6 Test Pits 125 EA 0.01 1.25 0.01 $ 1.25 ] 61rwM1 PVC House Service Laterals 3,155 1 $ ]000 220,850.00 70.00 $ 220,850.00 8 8Inch PVC Sanity Seaver Roe 2040 LF $ 98.00 $ 199920.00 $ 120.00 $ 244,800.00 9 101nch PVC Saone Sewer Pie 250 LF $ 102.00 $ 25500.00 $ 125.00 $ 31.250.00 10 12 Inch PVC Sanity Sewer Pie 595 LF $ 104.00 81880.00 130.00 $ ]] 350.00 if 15 Inch PVC Sanity Sewer Pie 505 LF $ 10900 $ 55.045.00 $ 135.00 $ 68175.00 12 18 Inch PVC Sent Sewer Pie 1,213 LF $ 13300 $ 181329.00 $ 14500 $ 175,885.00 13 1241nch PVC Samikery Sewer Pipe 820 LF I $ 15000 1 123000.00 $ 160.00 $ 131200.00 14 4 Foot Diameter Sawa Manholes 289 VF 1 $ 340.00 1$ 98,260.00 1 400.00 $ 115600.00 15 S Foos Demeter Server Manholes 12 VF $ 500.00 $ 5750.00 $ 600.00 1 $ 61900.00 16 To inch PVCStorm Drain Pipe 867 LF $ 97.00 $ 84099.00 $ 105.00 1 $ 91 17 12 Inch Polyethylene or Gass 3 RCP Storm Drain Pie 250 LF $ 98.00 $ 24,500.00 $ 100.00 1 $ 25000.00 18 15 Inch Polyethylene or Class 3 RCP Stoma Drain Pie 840 LF $ 100.00 $ 84.00000 $ 105.00 $ 88,200.00 19 18 Inch Polyethylene or Class 3 RCP Storm Drain Pie BIDS LF $ 118.00 71390.00 $ 120.00 $ 72,600.00 20 241nch Pol lens or Class 3 RCP Slorm Drain Pie 3589 LF $ 12400 $ 445,038.00 $ 130.20 46] 28].80 21 4Foot Diameter Drain Manholes 2]] VF 34000 $ 94180.00 $ 400.00 $ 110800.00 22 4 Foot Diameter Catch Basins 379 VF $ 300.00 11370000 400.00 $ 151800.00 23 Manhole Frames and Coven 62 EA $ 45000 $ 2790000 $ 1,000.00 $ 62,000.00 24 Catch Basin Frames and Grates 66 EA $ 500,00 33000.00 1000.00 $ 66000.00 25 T' Machine Placed Pavement (Temporary Trench 10312 SV $ 9.55 $ 96.47980 $ 10.00 $ 103120.00 28 2" Hand Place Pavement (Terromi TranctISidewalk 1322 SV 24.85 32851.70 $ 14.00 $ 18508.00 27 3' HaM Place Pavement em m ptiv A tuns 658 SV $ 41.00 $ 26,978.00 $ 25.00 $ 16,45000 28 5" Machine Place PavemeM 3" Binder 2" Surfaces 8 912 SV 21 38 190 538.% $ 26.00 $ 231 712.00 29 5" hand Place Pavement 3" Binder, 2" Surfaces 8221 SY $ 8490 $ 53,34ZSO $ 50.00 $ 41 1100.00 30 In -Place Reclaimation of Exisi Pavement 36 SV 1862 $ 6]348.54 $ 20.00 $ 72,340.00 31 Bangor Police Officer for Traffic Control 1,158 HRS $ 5000 $ 57,800.00 4500 $ 52112000 32 Eleosmnic Si nboaN Rental 96 Caere$ 10000 $ 9600.00 $ 100.00 $ 9800.00 33 Celctum CM1loddepust Control 20 Tons $ 0.01 $ 0.20 $ 0.01 $ 020 34 Water post Contral 100000 Gal $ 0.01 $ 11000.00 $ 0.01 $ 1000.00 35 MObilivaean(not loexceed i%of most on em bid 1 EA $25,00000 $ 25000.00 $ 2]390.6] $ 2]390.6] 36 Flowable Fill 1000 CY $ 40.00 $ 40,000.00 $ 40.00 40000.00 37 Remove and Reset Manhole Frame and Cover 5 EA $ 500.00 2,500.00 1 000.00 $ 5,000.00 Total Base Bitl: $2,M.291 W 2877782.57 City of Bangor Bid Tabulation- Franklin Street Resurfacing 06 316 Bid Opening 08/1&06 R.F. Jordan& Sons Ellawath. MaineEPRICE Vaughn Thlbideou n or Maine ITEM DESCRIPTION OTY UNIT UNIT PRICE TOTAL PRICE TOTAL PRICE1 Trench 8 SimMurel Rack ExcavMlon Ex losives 500 CV $ 50.00 $ 25000.0000 $ 25,000.002 Trench& Structural Rack Excavation Mechanical 25o CY 100.00 $ 25000.0000 $ 6.250.003 Pre -Blast Surve i85 FA 50.00 82500000 $ 8250004 Excavation and acement Bafill 200 CY 2000 4000.00.00 $ 8000.005 Excavation Belau Normal Grade andR lacement 100 CV 30.00 3000.00.00 4000.006 Test Pits 125 EA $ 500.00 $ 6250000.00 $ 3]500.00] 6 Inch PVC louse Service Laterals 3155 LF 86.00 $ 2]1330.00.00 $ 220850.008 8Inch PVC Sanity Sewer Pie 2040 LF $ 98.00 $ 199920.00.00 $ 142800009 101nch PVC Santa Sewer Pie 250 LF $ 100.00 $ 250000000 $ 1]5000010 121nah PVC Benita Sewer Pie 595 LF 110.Oo fi5450.00.00 $ 41650.0015xM1PVCSanip SewerPie505 LF $ 126.00 $ 63630.00.00 $ 35,350.00 12 18 Inch PVC Sanity Saver Pie 1,213 LF $ 132.00 $ 180116.00 $ 9000 10917000 13 24 Inch PVC Sanitan, Saver Pipe 820 LF I $ 15400 I S 126280.00 100.00 8 82000.00 14 4 Foot Diameter drover Manholes 289 VF 45000 130050.00 $ 3000.00 $ 88],00000 15 S Foot Dlxmelo, lever Manholes 12 VF $ 60000 $ 8900.00 $ 3000.00 $ 3450000 18 101ncM1 PVC Sorm Dalo PI 867 LF $ 100 00 $ 86700.00 $ ]000 $ 60 690.00 17 12 Inch Pol 1 one or Class 3 RCP Storm Dain PI 250 LF $ 90,00 $ 22.500.00 $ 71LM 17 500.00 18 15 Inch PoI t ene or Dasa 3 RCP Storm Drain Pi 840 LF $ 9200. $ 77.2W.00 $ ]500 $ 63,000,00 19 18 Inch Pol 1 ene or Gass 3 RCP Storm Dain Pi 605 LF $ 107.00 64 ]35.00 $ ]0 W 42 350.00 20 241nch PoI end lane or Clara 3 RCP Storm Drain Pi 3 589 LF $ 141.00 $ 506,0Q.00 $ 80.00 $ 287,1A.00 21 4Foot Diameter Dain Manholes 277 VF $ 3]500 $ 103,875.00 $ 250000 $ 692500.00 22 4 FOM Diameter Catch Basins 379 VF $ 450.00 $ 170550.00 $ 2500.00 $ 94>50000 23 Manhole Frames and Covers 62 EA $ 90000 $ 55800.00 $ 550.00 $ 3410000 24 Catch Been Frames and Grates 66 EA $ 900.00 $ 59,40000 $ 550.00 $ 36300.00 25 2'Machlne Placed Pavement em ra Trench 10312 BY $ 18.00 $ 185616.00 $ 11.35 $ 11]04120 26 2"Hand Place Pavement Tem orz Trenchl8idewalk 1322 BY $ 4100 5420200 13.80 $ 18243.60 27 3 Hand Place Pavement TWIDOMW Ddvewa Assets) 658 SY $ 61.00 $ 40136.00 2450 $ 16,12100 28 b' Machine Place Pavement JX Binder2'Sudacae 8.912 BY 3500 1 $ 311920.00 $ 22.05 $ 19850980 29 S hand Place Pavement a Binder, Z. Surfaces 822 SY $ 88.00 $ ]2,336.00 $ 35.65 $ 29.304.W 30 In -Place Redaimakon MExiatin Pavement 3. 17 SY $ 11212].00 $ 13.30 $ 48,106.10 31 Ba or Police Officer or TreRC Control 1158 HRS 6358000 $ 45.00 $ 52020.00 32 ElecbonicSI nboaM Rental 98 Da $ 31 680.00 $ 320.00 30 ]20.00 33 CalciumChlorideDuetControl20 Tons$ 16000.00 $550.00 $ 1100000 Water Dust Control 100,000 Gal MJ' $ 20,000.00 $ 0.05 5000.00 35 MoMliffibn notmexceed i%of local ro'ecl bitl 1 FA$ 33000.00 $1]9829.20 $ 1]9.8292038 floaaMaFill1.000 CY $ ]4,000.00 $ 45.00 $ 45000.00 3] Remove antl Reset Manhole Frame and Cover 5 EA $ 4000.00 $ 45.00 $ 225.00 Total Base Bid: $ 341914.00 45]0000.00