Loading...
HomeMy WebLinkAbout2006-09-11 06-315 ORDERCOUNCIL Imm No. 06 315 Date: Sepbamber 11, 3006 Item/Subject Order, Granting t'.OntrdQ Award for Ohio Street Resurfacing Improvements Project— FIN 013071.00 Responsible Department: Engineering The attached Council Order autlwdzes a contractaward to the Vaughn Thlbodeau & Sons, Inc. for the Ohio Street Resurfacing Improvement Project. This a an MDOTmoject requested through the BACIS process that is being developed and administered by the Ory. The project Involves resurfacing, curbing, and other improvements beginning at Balley Streetand extending wesMrly0.81 mllesto Sunbury Village. Total project. cost Is $309,284.80 with a 15% local match. Bid award to the low bidder, Vaughn Thibodeau & Sons, Inc. is recommended for the total bid price. Department Bead Manager's Comments: ,n Recommend approval. 'ft F4rdv+• Ukv a.R mv.q y p.:4. tlo tTr Cnr.rvn�% qry manager Associated fir l anon: Order, Nd Tabulation Budget Approval: Legal Approval: Rnance Directs Isik Yl IgM X Passage _ First Reading Page _ M_ Referal 0,110 'S Assigned to Councilor stone Septeober 11, 2006 CITY OF BANGOR 11 D` (TITLE.) Order, Award of Contract for Ohio Street Resurfacing Improvement Project— PIN 013071.00 8y the OryOoo /ofdie Ory ofBww..• ORDERED, THAT, a contract Is hereby awarded to the Vaughn Thihodeau @ Sons, Inc. for the Ohio Street Resurfacing Project, MOOT PIN 013071.00.00, in the Total Bid amount of $304,284.80. * a� 0&06H (R'!I.&J Avard Cwcra<t foz Ohfo Stzeet Aeaurfaclu Igro nt Project - Ptp OI30]L00 "lam Cmrtlbr5kN City of Bangor 06 315 Bid Tabulation - Ohio Street Resurfacing Bid O nin : 08123106 Vaughn Thibodeau Bangor, Maim Lane Construction Meriden CT ITEMDESCRIPTION CITY I UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 202.202 Removin Pavement Surface 13690 SV 1.65 It 22588.50 2J0 36963.00 2 202.203 Pavement Butt Joints 82 SV 15.00 $ 1,230.00 19.DU $ 1,558.00 3 203.20 Common Excavation 20 CY $ 50.00 $ 1 000.00 $ 36.00 $ ]20.00 4 203.203 Ditch Excavation 490 LF 10.00 $ 49011.00 ].50 $ 3,6]5.00 5 203.24 Common Bormw 60 CY $ 30.00 s 1,800.00 28.00 1680.00 6 203.35 Crushed Stone Drry a 6 CV $ 50.00 $ 300.00 $ 75.00 $ 450.00 ] 304.10 oogregate Subbase Course - Gravel 100 CV $ 40.00 4000.00 $ 42.00 8200.00 8 403.20]314" 19mm Hot Mix Asphalt 30 TON $ 120.00 $ 3600.00 160.00 9800.00 9 403.2103/6" 9.5mm Hot Mix Asphalt 1,750 TON $ 62.75 1 109812.50 $ 71.00 $ 124250.00 10 403.209 Nil" 9.5mm Hot Mix Asphalt 50 TON $ 125.00 $ 8250.00 $ 140.00 $ 7000.00 11 403.211 Hot Mix As hell -Shim 100 TON $ ]500 ]500.00 $ 105.00 $ 10500,00 12 409.15 Bituminous Tad Coat lied 700 GAL $ 3.00 2100.00 $ 4.00 2800.00 13 809.31 Curb T J. Moic 1 590 LF 8 9.00 5,310.00 $ 8.00 4 ]20.00 14 610.08 Plein RipRa 35 CV $ 75.00 $ 2625.00 $ 53.00 $ 185500 15 815.07 Loam 150 CV $ 65.00 $ 9,750.00 $ 50,00 $ ] 500.00 16 618.13 Seedi Method No.1 20 UNIT $ 100.00 $ 2 000.00 $ 25.00 $ 500.00 17 619.12 Mulch 20 UNIT $ 25.00 E 500.00 10.00 $ 200.00 18 621.]114"White or Velbw Pavement Markin Lim 4120 LF $ 0.24 E 988.80 $ 0.30 $ 1236.00 19 629.05 Hand labor 10 MH 35.00 E 35000 $ 35.00 $ 350.00 20 631.12 All Pu se Excavator 5 MH $ 120.00 $ WOOD $ 110.00 $ 55000 21 631.172 Turf - La e 5 MH $ 50.00 $ 250.00 $ 55.00 $ 2]5.00 22 652.36 Maintenance of Traffic 1 LS $ 39850.00 3985000 $ 14000.00 1400000 23 652 38 Mariner 1 200 MH $ 16.00 $ 19,200,00 $ 15.00 $ 18 000 00 24 659.10 Mobilization Not to Exceed 3t 1 LS $ ] 400.00 $ ] 400 OD $ ] 000.00 $ ] OW 00 Total Base Bid: $ 253,704.80 $ 254,782.00 Additive ANemate Bid IGms 1 603.1510" Storm Drain Opt. 111 65 LF $ 35]500 $ 90.00 $ $85000 2 603.15912"CulvertOt. 111 98 LF $ 5390.00 $ 40.00 $ 3920.00 3 603.16915" Storm DrainOt. 111 2]0 LF $ 1485000 $ 42.20 $ 11394.00 4 603.1]918' CovertOt. 111 85 LF 0 $ 5525.00 $ ]8.00 $ 8630.00 5 603.199 Culvert O L 111 54 LF 0 $ 3240.00 $ 88.00 $ 4 ]52.00 603.199Culvert O LII RCP 'I.. 8 LF 0 M50.5w.00. $ 1 000.00 $ 108.00 $ 864.00 604.092 Catch B1 -C 5 EA 0 $ 15000.00 $ 3600.00 $ 18000.00 8 604.16] Allen Catch Basin 1 EA 0 $ 1 500.00 $ ]50.00 $ ]50.00 9 604.18 Adustin MH and CB to Grade 1 EA 0 $ 500.00 $ 600.00 $ 600.00 Total Alternates:50,580.00 5 ]60.00