HomeMy WebLinkAbout2006-06-12 06-212 ORDERItem No. 06 212
Date: June 12, 2006
Rem/Subject Order, Authorizing Contract Award for the Reconstruction of the Remote
Clearance Customs Apron at Bangor International Airport
Responsible Department: Airport
On April 16, 2006, the Oty received two (2) bids for reconstruc0on of the Remote Oustom Clearance
Apron. The bid prices were $1,776,695.00 and $2,312,983.75 -- see attached bid tabulation.
Edwards 9 Kelsey, the Almorfs engineering consultant, and Oty staff have reviewed the low bid
from Lane Conshuction and they have found it to be responsive to all requirements of the bid
request.
On June 8, 2006, the Finance Committee reviewed and approved starts recommendation for the
award ofthe contraRto The lane Construction Corporation of Bangor in the amount of$1,776,695.
This bid award rerommendation must be approve by the City Counal as it is over $10,000.
Department Head
Recommend approval.
awAok
/ Oly Manager
Associated Information: 1
Q�
Finance Director
X Passage
_ First Reading Page _ of_
Referral
06 212
c� 6eniuged m Cmmciloc Pari Juva 12. 2006
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award for the Reconstruction of the Remote Clearance
Customs Apron at Bangor International Airport
by one City Cbuucif of the CYry of4v W..-
ORDERED,
THAT Peggy Sheriff, Purchasing Agent, is hereby authorized to execute a contract
with The Lane Construction Corporation in the amount of $1,776,695 for the
reconstruction of the Remote Customs Clearance Apron at Bangor International
Airport.
I CITY C CIL
Sum I2, 2006
PassedA
06-312
pg OED EE
(TTfLEJ "thorizi ff Coatr t "ard far the
Hecooatroetfoa of the Remote Clearaaee
� atMne intGEM
mrPort e
wwtiem ro coat�ao.��(✓�
06 212
Crooffli
IN TaCubtion- RewMrvtl Rei Owdi Clnranw NCO Polon
Bid Opening' 0141 NO
ITENNO.
DESCRIPTION
QT/.
UNIT
UNIT
COST
TTNL
MR
COST
TOTAL
"01-1
Engineers Fiea Office
I
1
Ls
1-800000
5500000$95003.00
$
95.000.00
Ma01-2
As NO Drewm ¢
FLS
$
300000 $
3No 00
$3000.00 $
3 O.00
M002-1
BlWninwe Concrete Ni Land John
35350
LF
$
250 $
0037500
$175 $
6188260
W02-2
FCC Pavement Saar Gond Joint
750
IF
$
420 $
315000
QSO $
213750
MO011
CmMminab05ol Peri and RO apmenl
100
CY
$
6500 $
Sword
$4.75 $
5$7500
M -0i
Bodoni Milling 5 treptin
32000
W
$
400 $
128.00000
Nrw $
160.00) Do
Ni
Nadi Beu Calix
9.600
6Y
$
500 $
08.00000
$5.75 $
56.]50.00
Fri
Undas3lfed Emanation
800
CY
$
1600 $
12Wo00
$2175 $
19.000.00
0.1523
Rockloc eWn
10
CY
$
24000 S
240000
$19500 $
1 O 00
P -+52a
U,dulbSb mi RMgral ORe etMNm
CY
$
200 s
315.00 $
460.00
P-1524
Remove PCC lowiti
1.]00
$
1400 $
23000.00
339.00 $
0830040
P-1524
Adult Sarong Structure Gaidde
2
EA
IN000 $
2WOW
W 3
1 D 00
P -152A
Fool Exl¢8n Doofflai Uni
2
EP
$
wood
1TOO Or
$2.75000 $
5500.00
P-152-7
Remote Larni Tri Darman
616
LF
3000 $
1045000
53150 $
13$22.50
Lonholktl Lmr nth MCMUI
30
C
$
14000$
4M00
$150.00$
4.50000
P-154.1
$uWa¢e0oux
730
C
00 $
2180000
}38.86 $
28.214.50
PZp91
CmhiD sole Base Coux
380
CY
.W $
1900000
153.W $
20.140.00
P4011
Bituminous Cordate Farrar
11000
TON
MOO $
(AS 2W.00
Wait $
944CW.W
P-SOtA
PorBand Cement Concrete Pa"i
1480
C
8.00 $
142080.00
AMM S
3a DO
Pd02A
Bitiminous Pnme Cert
2500
GPL
6.00 $
1500000
$5W S
12500.1
P403i
BOimimus Taµ Coal
7500
GAL
500 $
37500.1
W
a. W
Pd]11
Refine) Coat Tar Fmuloon ah Monitoring Sidw Sawsurha Trea6nent
323M
BY
Iso $
581b 00
$375 $
121,12500
0.701-1
24" ReaMmte] Canoe Pont CL.I
IN
U-
500 $
97W.W
NOW S
11 BOOM
D-701-1
10" RaintuMi Concrett Pl CLI
tt
LF
0.00
BONN
72.75
7.63875
0.7013
14"DuNle Oan Pl
25
W
J.a $
1051
NI.$2.312,U3.75
11 $
11.75o0D
A7014
18 Dunne Iran Pl
25
LF
0.00 $
13,000W
$59000 $
1075000
0.7051
6' Prelmaled UMeMaraan ProdBW
LF
8.00 $
31,20000
M50 $
196W00
0.7052
Underhand Cladi
4
EA
0w $
5.5001
$i $
B.OW.t
0.751-1
0.FL OIemderwnhok
2
FA
000 S
SWOW
a.5Wd0 $
130MM
67513
6.11, DIamoner 1111
2
E4
000 S
28.00000
$12:00.00 $
34,0W.w
.751-3
B'Remehh Precut Concrete Manhole will Cal Sarni
2
EA
01 $
56,0001
ER,SW.t $
59.00000
D -75i
Toni Drain B'
JOB
LF
No 00 $
109.14000
NO) $
192,80.00
I $
1.neA95O4
$2.312.m.75