Loading...
HomeMy WebLinkAbout2006-06-12 06-212 ORDERItem No. 06 212 Date: June 12, 2006 Rem/Subject Order, Authorizing Contract Award for the Reconstruction of the Remote Clearance Customs Apron at Bangor International Airport Responsible Department: Airport On April 16, 2006, the Oty received two (2) bids for reconstruc0on of the Remote Oustom Clearance Apron. The bid prices were $1,776,695.00 and $2,312,983.75 -- see attached bid tabulation. Edwards 9 Kelsey, the Almorfs engineering consultant, and Oty staff have reviewed the low bid from Lane Conshuction and they have found it to be responsive to all requirements of the bid request. On June 8, 2006, the Finance Committee reviewed and approved starts recommendation for the award ofthe contraRto The lane Construction Corporation of Bangor in the amount of$1,776,695. This bid award rerommendation must be approve by the City Counal as it is over $10,000. Department Head Recommend approval. awAok / Oly Manager Associated Information: 1 Q� Finance Director X Passage _ First Reading Page _ of_ Referral 06 212 c� 6eniuged m Cmmciloc Pari Juva 12. 2006 CITY OF BANGOR (TITLE.) Order, Authorizing Contract Award for the Reconstruction of the Remote Clearance Customs Apron at Bangor International Airport by one City Cbuucif of the CYry of4v W..- ORDERED, THAT Peggy Sheriff, Purchasing Agent, is hereby authorized to execute a contract with The Lane Construction Corporation in the amount of $1,776,695 for the reconstruction of the Remote Customs Clearance Apron at Bangor International Airport. I CITY C CIL Sum I2, 2006 PassedA 06-312 pg OED EE (TTfLEJ "thorizi ff Coatr t "ard far the Hecooatroetfoa of the Remote Clearaaee � atMne intGEM mrPort e wwtiem ro coat�ao.��(✓� 06 212 Crooffli IN TaCubtion- RewMrvtl Rei Owdi Clnranw NCO Polon Bid Opening' 0141 NO ITENNO. DESCRIPTION QT/. UNIT UNIT COST TTNL MR COST TOTAL "01-1 Engineers Fiea Office I 1 Ls 1-800000 5500000$95003.00 $ 95.000.00 Ma01-2 As NO Drewm ¢ FLS $ 300000 $ 3No 00 $3000.00 $ 3 O.00 M002-1 BlWninwe Concrete Ni Land John 35350 LF $ 250 $ 0037500 $175 $ 6188260 W02-2 FCC Pavement Saar Gond Joint 750 IF $ 420 $ 315000 QSO $ 213750 MO011 CmMminab05ol Peri and RO apmenl 100 CY $ 6500 $ Sword $4.75 $ 5$7500 M -0i Bodoni Milling 5 treptin 32000 W $ 400 $ 128.00000 Nrw $ 160.00) Do Ni Nadi Beu Calix 9.600 6Y $ 500 $ 08.00000 $5.75 $ 56.]50.00 Fri Undas3lfed Emanation 800 CY $ 1600 $ 12Wo00 $2175 $ 19.000.00 0.1523 Rockloc eWn 10 CY $ 24000 S 240000 $19500 $ 1 O 00 P -+52a U,dulbSb mi RMgral ORe etMNm CY $ 200 s 315.00 $ 460.00 P-1524 Remove PCC lowiti 1.]00 $ 1400 $ 23000.00 339.00 $ 0830040 P-1524 Adult Sarong Structure Gaidde 2 EA IN000 $ 2WOW W 3 1 D 00 P -152A Fool Exl¢8n Doofflai Uni 2 EP $ wood 1TOO Or $2.75000 $ 5500.00 P-152-7 Remote Larni Tri Darman 616 LF 3000 $ 1045000 53150 $ 13$22.50 Lonholktl Lmr nth MCMUI 30 C $ 14000$ 4M00 $150.00$ 4.50000 P-154.1 $uWa¢e0oux 730 C 00 $ 2180000 }38.86 $ 28.214.50 PZp91 CmhiD sole Base Coux 380 CY .W $ 1900000 153.W $ 20.140.00 P4011 Bituminous Cordate Farrar 11000 TON MOO $ (AS 2W.00 Wait $ 944CW.W P-SOtA PorBand Cement Concrete Pa"i 1480 C 8.00 $ 142080.00 AMM S 3a DO Pd02A Bitiminous Pnme Cert 2500 GPL 6.00 $ 1500000 $5W S 12500.1 P403i BOimimus Taµ Coal 7500 GAL 500 $ 37500.1 W a. W Pd]11 Refine) Coat Tar Fmuloon ah Monitoring Sidw Sawsurha Trea6nent 323M BY Iso $ 581b 00 $375 $ 121,12500 0.701-1 24" ReaMmte] Canoe Pont CL.I IN U- 500 $ 97W.W NOW S 11 BOOM D-701-1 10" RaintuMi Concrett Pl CLI tt LF 0.00 BONN 72.75 7.63875 0.7013 14"DuNle Oan Pl 25 W J.a $ 1051 NI.$2.312,U3.75 11 $ 11.75o0D A7014 18 Dunne Iran Pl 25 LF 0.00 $ 13,000W $59000 $ 1075000 0.7051 6' Prelmaled UMeMaraan ProdBW LF 8.00 $ 31,20000 M50 $ 196W00 0.7052 Underhand Cladi 4 EA 0w $ 5.5001 $i $ B.OW.t 0.751-1 0.FL OIemderwnhok 2 FA 000 S SWOW a.5Wd0 $ 130MM 67513 6.11, DIamoner 1111 2 E4 000 S 28.00000 $12:00.00 $ 34,0W.w .751-3 B'Remehh Precut Concrete Manhole will Cal Sarni 2 EA 01 $ 56,0001 ER,SW.t $ 59.00000 D -75i Toni Drain B' JOB LF No 00 $ 109.14000 NO) $ 192,80.00 I $ 1.neA95O4 $2.312.m.75