HomeMy WebLinkAbout2006-06-12 06-211 ORDERItem/Subject Order, Authorizing Combat[ Award for the Construction of the Maine Avenue
Amess Drive at Bangor International Airport
On April 16, 2006, the City received four (4) bids for construction of the Maine Avenue Amess Drive.
The bid prices ranged from $290,343.90 to $393,603.30 -- see attached bid tabulation.
Estimates Is Kelsey, the Airports engineering consultant, and City staff have reviewed the low bid
from Sargent Corporation and have found it to be responsive to all requirements of the tied request.
On lune B, 2006, the Finance Committee reviewed and approved staffs recommendation far the
award of the contract to Sargent Corporation of Stillwater in the amount of $290,343.90. This bid
award recommendation must be approve by the City Council as it is war $100,000.
City MMamger
Associated Infomrallon:
ori(%
Introduced For
X Passage
_ First Reading Page _ of
Referral
Oo 211
dssfnged to Councilor Farrington June 12, 2006
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award for the Construction of the Maine Avenue
Access Drive at Bangor International Airport
By the City Coumul of the City of Bangor:
ORDERED,
THAT Peggy Sheriff, Purchasing Agent, is hereby authorized to execute a contract
with Sargent Corporation in the amount of $290,343.90 for the construction of the
Maine Avenue Access Drive at Bangor International Airport.
June 12 2006
Yae
_ X W211
cxYs csduu n g u s s
(masr cne
Maine Avenue Access O ive At Bangor
Ayignedb Cauceibr�(�
City of Bangor 04` 211
Bid Tabulation - Contra Maine Avenue Access Drive
Bid Opening - N126/08
Sargent Corporation
Stillwater, Maine
Vaughn Wootleau
Bangor, Maine
Lane Construdion
Bangor. Maine
Maine Bann
Hermon, Maine
ITEM
DESCRIPTION
OTY.
UNIT
UNIT
COST
TOTAL
UNIT
COST
TOTAL
UNIT
COST
TOTAL
UNIT
COST
TOTAL
203.22
Unclasaried Excavation
4350
CY
610
26.53500
875
30.032.50
1200
52.200.00
13.00
56.550.00
20324
Common Borrow
1,870
CY
0.01
18.70
1000
18,700.00
1.00
1,87000
14.00
26,180.00
304.09
Aggregate Subbase Course - Crusted
1,195
CY
25.00
29,875.00
2400
28680.00
38.00
45.410.00
3200
38.240.00
304.1
AggregrateSubbaseCounge-Gravel
3,715
CY
13.00
48,29500
19.00
70,585.00
23.00
85,445.00
25.00
92,07500
403.207
Hat Mix As aft, 19.0 MMHMA
625
TON
5800
35,250.00
66.00
40,625.00
MOO
35,00000
SO 00
35,000.00
403,208
Hat Mix As a9, 12.5 MM HMA
450
TON
63.00
2$350.00
65.00
29,250.00
60.00
27,00000
50.00
27,000.00
409.15
Bituminous Tack Coat smiled
380
GAL
3.00
1,14000
500
1,90000
2.50
95000
2.00
760.00
603441
42"RCP Class
190
LF
14500
27,55000
155.00
29.45000
18000
3420000
10800
20,52000
604.16
After Catch Basis 0 Manhole
1
EA
50000
50000
000.00
60000
90000
90000
1,26000
128000
604.18
Ad'ust Manhole to Grade
2
EA
1 110000
2,20000
30000
600.001
500.00
1,00000
700.00
140000
627,618
12" Solid VMtie Pvaement Marking Line
50
LF
1 400
20000
0.50
25.00
2.00
10000
200
10000
627]1
4' V&iW Pavement Marking Line
3,100
LF
1.00
3,100.00
2.501
7,750.00
0.30
93000
0.25177500
627.73
4- Yellow Pavement Marking Line
3,370
LF
1.00
3,370.00
0]5
2,527.50#393.68
5
1,85350
025
042.50
645292
Re ularo Signs Tpe 11 (Slop 59m)
13
SF
56.00
700.00
3500
437.500
212.50
1500
18750
656.5
H bales in-place
262
EA
11.50
3,01300
500
1310.000
3,01300
800
2,096.00
658.83
Tem ra Silt Fence
759
LF
2.00
1,51800
3.00
2,2T7.000
1,897.50
2.50
1,897.50
6%M
Stone Check Dams
15
CY
131.00
1,96500
35.00
525.000
4,050.00
55.00
825.00
M -00M1
Engineers Field OPow
1
LS
14,50000
14,500.00
18,500.00
18.500 00
1900000
190000019,000.00
19,000.00
M-031-2
As -Built Plans
1
FLS
3,000.00
3,00000
3,000.00
3,000.000
3,00000
3,00000
3,000.00
M-002
42" Twin Culvert Headwall
2
LS
6,55000
13,100.0013,500.00
27,000.0000
1600000
5000.00
10,00000
M-003-1
Pavement Millin
1,200
SY
2.00
2,400.00
5.00
6,000.0020
3,84000
TO
600000
M-004-1
Sands Sewer
Manhole -4'Diameter
t
EA
2,750 CO
275000
7,5WC0
75000100
5000,00
9,00009
9,900.90
F-162-1
New6 Secut Fence
800
LF
29.50
23,600.00
23.00
18,4000000
20.000.00
2000
18,000.00
F462Z
RemoveEutin Security Fence
945
LF
6N
5,670.00
3.34
3,1563050
3,30.50
3.00
2.835.00
T-901-1
Seeding4.572
SY
045
2,05740
039
t ]830840
1,828.80
040
1,828.80
T-905.1
To Sail
4572
SY
1.90
8680.00
473
21,5255670
12.344.40
425
19431.00Total
290,]43.90
380,488.44380,352.30
J9J,6o3.Jo
06 211
Sargent Corporation
SWIvister, Maine
Vaughn Thlbodeau
Bangor, Maine
Lane Conebue60n
Ban or Maine
Maine Ea"he
Hermon, Maine
REM NO.OESCBIPTN)N
OTY.
I UNIT
UNRUNIT
LOST TOTAL
COST TOTAL
UNIT
COST
TOTAL
Alditivel
M -o04-2
Replace Fmme and Cover
2
E4
912.00 1,824.00
55D.00 1,100.00
700.00 1,400.00
1,100.00
2.20000
M-005-1
Reclaimed Base COuse
975
SY
400 3,80000
450 4,38].50
320 3,120.00
400
3,900.00
40320]
Hot Mix Asnua,i&O MM HMA
]5
TON
58.00 4,35000
5500 4,8]5.00
5600 4,2W,0
5700
5,02500
403.208
Hot Mix Anhalt 125 MM HMA
60
TON
63.00 3,780.00
6500 3,900.00
60.00 3,BMW
YVO
4,32000
409.15
Si8min0us Tack Coat Ap lietl
40
GAL
5.00 200.00
5.00 200.00
4.00 180,0
500
20000
Tome tor Almrnate
NO.1 1 14,,45440
1 14,452.501
12,450.00
15160.5.00
SargentCorporation
Slellwater, Maine
Vaughn Thibodeau
Bangor, Maine
Lane Construction
Bangor, Maine
Maine EeM
Haman, Marna
ITEM N0.OE9CRIPRON
QW.
UNIT
UNIT
COST TOTAL
UNIT
COST TOTAL
UNIT
COST TOTAL
Atltlxlve Altemate No.2
0.em-i
Finch PeRmatea Undemmin Ple
1 1 MUI1
31W 48,50000
in uui 28,800.00
21.W 33,800.00
17,W 2],2W.00
O-]05-2
6-mch Soix Coude wan HOPE m
12olI
JZ,Wl 4.UVV VVI
IdUU1 21250.00
35.M 4,31500
1100 2,125.Oc
0-705-3
Undenlon Cleanout
1 81
EA
j 629,001 4.960.001
25D 001 2,080.00
]00.00 5,600,001
1,50000 12,800.00
Total for Alternate No.2 1 53,560.001
1 33,130.001
1 43,576.00
42,125.00
Sargent Corporation
Stillwater, Maine
Vaughn Thibodeau
Bangor, Maine
Lane ConMmctbn
Bangor, Maine
Milne Eaft
Hermon, Maine
BM Urnmanr
Base Bid
290343.90
380,489.44
380352.20
393,603.3D
Atltlilrve Altemate ND. 1
I I 14,UD4,Wl
14,4IJZ.DUI
I 12 480.0015,645,0
Atltlaive Almrnaie No.2
55%0.00
33,130.00
43,5]5.00
4212500
Total Base Bid plus Alternative No. t and2:1362,957.901
I Q3,06l.sol
1 436,4VT.20
451,3]3,0