HomeMy WebLinkAbout2006-04-10 06-135 ORDERItem Mo, 06 135
Date: April 10, 2006
Item/Subject ORDER, Authorizing the City ManagerarrA or Airport Directorto entarintean
agreement with Edwards and Kelcey in the amount of $193,646 for
engineering services for the Update on Stamm Wrter Management(Drainge)
Study.
Responsible Department: Airport
Edwards and Kali is the approved Airport Engineerfor AirportImprovement Projects (AIP). It
has been a number of years since the airport has completed a full drainage study of Me airport
The last study focused primarily on stormwater detention issues. Since then, water quality
concerns in relation M Birch Stream have arisen. his report will reflect actual current conditions
on the airport based on construction Mat has occurred over Me years. The study will identity
steps Mat can betaken M improve water quality in response regulatory and Citizen concerns.
Finally, the information generated by this study will be essential m the development and
implementation of an overall watershed improvement plan for Birch Stream, a plan that is being
required by the Maine Department of Environmental Protection.
Federal funds will cover 9S% of the cost. The State of Maine will cover 2 rh%antl Airport 2
'h% for a total of $193,646.
Department Head
As noted above, this work will be an integral part of the City's larger effort to address stormwater quality
concerns in the Birch Stream Watershed. I recommend your approval, as does Me Finance Committee.
O
City Manager
Approval:
,(akA aCe:::�
Finance Director
City Solicitor
Introduced for
-x- passage
_ First Reading Page _ of _
Referral
QG 135
Assigredw( neilor Gcatr ck apnl 10, 2006
CITY OF BANGOR
TITLE. Order, Authorizing the City Manager and or Airport Director to enter Into an
Engineering Agreement with Edwards and Kelcey In the amount of $193,616 to
perform an Update on Storm Water Management (Drainage) Study.
WHEREAS, Edwards and Kelcey is the approved Airport Engineer for Airport
Improvement projects (AIR); and
WHEREAS, This project will be an update on a study completed In the 19905; and
WHEREAS, This report will reflect actual conditions based on construction that has
occurred at the Airport over the years; and
WHEREAS, The study will identify steps to improve water quality in response to
regulatory and citizen concerns and will make recommendations for future
improvements;
NOW, THEREFORE, BE R ORDERED BY THE CRY COUNCIL OF THE CITY OF BANGOR
THAT
the City Manager and or Airport Director Is hereby authorized, on behalf of the City of
Bangor, to execute an Agreement with Edwards and Kelcey, in a form approved by the
City Solicitor or Assistant City Solicitor, In the amount of $193,696 to perform an Update
on Storm Water Management (Drainage) Study at Bangor International Airport.
MCI:
2006
UME4 Anthorizine tha /
and /or Airport Director to eater Int
an seat with varas and gelcgy i
ena
n the
Aneont
of 5193.646 for engineering services
for the. ➢Mate m. gnat.
(Drainage Study)
AvgoW bCouotlbr�0(/�
t�W