Loading...
HomeMy WebLinkAbout2006-02-13 06-086 ORDERItem No. -— --- - Date: February 13, 2006 _ Item/Subject Order, AuthorizingAward of Contract to Cianbra Corporation nor ADA Ferry Landing. Responsible Department: Enghwaring _ The attached Omer authorizes contract award! M Me Cianbra Corporation for Me construction of the ADA Ferry landing/Heavy Vessel Dock on the waterfront. Two bids were received for this project and a bid tabulation is attached. The contract award is only for work included in the Base Bid amount Cianbro completed the most recent Waters Edge Improvement Project with excellent results. A large portion of funding will be provided by two Federal cants: $520,417 from Me Ferry Boat Discretionary Program and $100,000.00 from the Boadng Infrastructure Grant (BIG) Program. The balance will be local nest. CDSG funds will be used for a significant portion of the local match. V Department Head K b Oty Manager Associated Information: Order, local Project Agreement Budget Approval: X passage _ First Reading Page _ of Referral ns 086 AssipW to Camcib Palmer Feiry rygl.�iO06 /s v CITY OF BANGOR CMI.E.j Order, Authorizing Award of Contract to Cianbro Corporation for ADA Ferry Landing. By the Qty Council of the City of Bangor. ORDERED, THAT Award of comma to the Cianbro Corporation of Pittsfield, Maine for the construcdon of the ADA Ferry Landing Project is hereby authorized in the Base Bid amount of $959,750.00. IN CIW cooucic Febrsary 13. 2W6 Motion, Made avd Seconded p 06-086 for Passage Yasse O R D E R I CITY fl•In,iL o)Authoritin,g Raid o£ Contract to de br rYarat nn n ern n og . Assigned tu Cnanbb< 0-'A� Plm�.� City, of Bangor _ Bid Tabulation - ADA Ferry Landing Bid Opening -01/1&06 06 086 Cianbro Corpore0on Pitisrield, Maine CPM ConsWctors Freeport, Maine Description Total Total Price Price Base Bid -959750.00 967250A0 Alternate 1 137 220.00 161 200.00 Alternate 2 312 840.00 344 400A0 Alternate 31,760M 23900.00 Total Project Bid: $1,441,570.00 $1,495,750.00 City of Bangor Bid Tabulation - ADA Ferry Landing 06 086 Bid Opening 01/18`06 Total Bess Bid: 315,350.00 969,760.00 307,350.00 967,250.00 Cianbro Corporellon Pittsfield, Maine CPM Contructors Freeport, Maine ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE BASE BID 001-02910 Steel Bare — Type 1 9 EA 66,000.00 594,000.00 71,000.00 639,000.00 002-02910 Steel Barge — Tell Not Used EA None None None None 00342910 Wall Guide — T 1 5 EA 3,500.00 17,50000 2,000.00 10000.00 004-02910 Wall Guide — T II Not Used EA None None None None 005-02910 Horizontal Fender Unit 9 FA 5,000.00 45,000.00 4,00000 36,000.00 00842910 Ladder 2 FA 2000.00 400000 1100000 2,000.00 05042910 Barge Joint Cover Plate — T el 8 EA 2,000.00 16,000.00 130000 10.400.00 008-02910 Barge Joint Cover Plate — Type 11 3 EA 1,750.00 5,250.00 95000 2,850.00 00942910 Barge Connector Pins 40 EA 100.00 4,000.00 100.00 4,00.00 010-02910 Removal and Re -installation of System 1 LS 30,00000 30,000.09 25,00000 25,OW.00 011-02920 Timber Float Not Used EA None None ' None None 012-05200 Aluminum Cringway (1)-53'-6"x4'Clear 1 EA 26W0.00 2605000 2500000 2500000 01345200 Aluminum Gangway 2-53'-8"x6'Clear 1 EA 26500.00 26050.00 25.000.00 25,000.00 014-05250 Aluminum Ramps 3 and 4-3U'x4'Clear 2 EA 15,000.00 W,O0.00 15,000.00 3900000 0151)52W Aluminum Ramps 5 and 6 - 23'-6'x4' Clear 2 EA 15,60000 36,000.60 14,000.00 '28,00000 016-052W Aluminum Ram 7-27'-6'x6'Clear 1 EA 15000.00 15,00000 25,000.00 25,00000 01]-052W Aluminum Ram 8-16'x4'Clear Not Used EA None None None None 018-50250 Platform A -5'-11"x5' 1 EA 10,050.00 10,000.00 8,50000 8500.00 019-05250 Platform B—T-11"x5' 1 FA 8,50000 8,500.00 7,WU.00 7,000.00 020-052W Platform C -5'x5' 1 EA 9,000.00 9,000.00 8150000 8,500.00 021-05200 Platform D -16'6"x8'-0" 1 EA 8,500.00 8,5W.00 15,WO.00 15,000.00 022-05200 Platforms E and F -5'x5 2 FA 900000 1$OW.00 7,500.00 14,000.00 02345200 1 Platform G -16'5'x8'-10' 1 EA 12,000.00 12050.00 1500.00 1500000 024-05200 Stair -Typel 1 EA 6,0..00 6,0000 5,W0.00 5,000.00 02545200 Stair —Type 11 1 1 EA 1 9,000001 9,000.001 iu,wgUOI 10,000.00 026-16000 1 ElectdcalSstem 1 1 1 LS 1 36.000 001 36,000gOl 22,00OU01 22000.00 Total Bess Bid: 315,350.00 969,760.00 307,350.00 967,250.00 Alternate 06 0SE 001-02910-1 Steel Barge -Tel 1 EA 62,500.00 62,500.00 75,000.00 75,000.00 002-02910-1 Steel Same ell 1 EA 45,000.00 45000.00 50.00000 50,000.00 00442910-1 Well Guide - T II 2 EA 2,00000 4,000.00 4,000.00 8000.00 005-02910-1 Horizontal Fender Unit 4 BA 4000.00 16000.00 4,00000 16000.00 006-02910-1 Ladder 1 EA 100000 1000.00 1000.00 1000.00 007.02910-1 Barre Joint Cover Plate - Type f 2 EA 1350.00 2700.00 2700.00 5400.00 009-02910-1 Barge Connector Pins 8 EA 65.00 520.00 100.00 SMOG 010-02910-1 Removal and Re -installation of Add Alternate 1 1 LS 5,50000 5,500.00 5,000.00 5,000.00 Total Alternate 1: 121,415.00 137,220.00 141,800.00 161,200.00 Alternate 2 001-02910-2 Steel Same - T 4 1 EA 1 62.000SOI 248.000,01 70.000M1 280,000.00 003-02910-2 Wall Guide -T 1 1 EA 2,00000 2,000.00 .2,00000 2,000.00 005-02910-2 Horizontal Fender Unit 11 EA 4000.00 44000.00 400000 44,000.00 006-02910-2 Ladder t FA 100000 1000.00 1 00000 1000.00 007-02910-2 Barge Joint Cover Plate - T 1 4 EA 1,20000 4,800.00 2,70000 10,800.00 W&02910-2 Ba eConnector Pins 1B EA 65.00 1040.00 10000 1600.00 010-02910-2 Removal and Re -installation of Add Alternate 2 1 LS 12,000.00 12,0100.001 5,000.00 5,000.00 Total Alternate 2: 82,265.00 312,840.00 - 84,800.00 344,400.00 Alternate 3 009-02910-3 Bare Connector Pine 4 EA 65,00 260.00 10000 400.00 010-02910-3 Weand Re-imoulation 0 Add Alternate 3 1 LS 8,000.00 8,000.00 2,500.00 2,500.00 011-02920-3 Timber Float 1 1 EA 1 11.5woul 11500.00 10,000.00 10,000.00 017-05200-3 Aluminum Ram 6 -16'x4Clear 1 1 FA 1 12,000.00 1 12,00000 11 00000 11 000.00 Total Alternate 3: 31,565.00 31,760.00 23,600.00 23,900.00 Total Bid Amount: $550,595.00 $1,441,570.00 $557,560.00 $1,,1911,70.00