2007-06-11 07-190 ORDER
Item No. Data: June P, zoos 07 190 Item/Subject. ORDER, Awarding Contract for Reconstrucdon of the Cargo Apron at Bangor Inb:madonal Airport Responsible Department: Airport On Apol 11, 2007, the Qty received bwo (2) bids for the first phase of reconstruction of the Cargo Apron (see attached bid tabulation). Funding for this project is as follmws: 95% Federal, 2.5% State, and 2.5% local. Edwards & coney, the Airport's engineering consultant, and City staff have reviewed the low bid from Sargent Corporation and have found'tto be responsiveto all requirements of the bid request. On May 21, 200], the Finance Committee reviewed and approved thestaff recommendation thatthe contract be awarded m Sargent Corporation of WIwater in the amount of $1,866,237. This bid award recommendation must be reviewed and approved by the City Council as It Is over $1011,0W. Department Head Managees Cammrmm: Recommend approval. City Manager AssociatedlnfomMDon: Bid Tabulation X Passage _First Reading Page _of_ -. Referral 07 190 /•• essigmoa to councilor WExxlco yam: 11. zoorf CITY OF BANGOR (TIRE.) Order, Awarding Contract for the Reconstruction of the Cargo Apron at Bangor International Airport By rhe pry CooxNofthe CRyofbang=.. ORDERED, THAT, Deborah Cyr, Finance Director, is hereby authorized to execute a contract with Sargent Corporation in the amount of $10866,237 for reconstruction of the Cargo Apron at Bangor Intemadonal Airport IN CIT[ COUNCIL ' Tune Ila 2007 p d g O]-190 T c an" Becooatutcfiou ofrthe Cana apernn at Cly of Bangor Bq Tabulation - Re ratrucl Cargo A9on-BIA Bi00oeni-ONHIO] Sargent Cor9 rstlen Stillwater, aware The lane Conntructlon Core. Mercden, LT IT NO. OE9CRIPTION QTY. UNIT UNIT COST TOTAL UNIT COST TOTAL Bees Bid M0o1-1 E aYs FWd Office 1 LS $ 39,999.80 $ 39,999.60 $80,000.00 $ EO,OL'1 W M601-2 As -bunt Pians 1 FLS $ 3,O0W $ 3,00000 $3,00000 $ 3AWA0 9602-1 Bilumlmus Concrete Sawed Control Jdnt 11,300 LF $ 400 S 45,20000 $320 $ 301=,0 M-002-2 PCC Pavement Sawed Control Joint 4.250 LF $ 5 W $ 21250.00 $6.00 $ 25,60000 Mbo3-1 Contaminated&it Removal aM Re acement 10 CY $ law $ 1,480.00 $110.00 $ 1,100m M6044 Pavement Milli -5"Oe 11,00 BY 5 2.75 $ 3,250.00 $4.20 $ 46,200.00 M-0051 Reclaimed Base Course 1,450 BY $ 4.50 $ 6,525.00 $5.00 $ 7,25)0 M0061 Potassium Acetate StorageTank 1 LS $ 97w0.0 $ 9].80.00 $60,000.00 $ 0,000 P-152-1 Unclassified Excavation 1,050 CY I $ 17,20 $ 18,00) 00 $16.00 $ 16WO.W P-152-2 Rock Exmwan 10 CY $ 47.24 $ 472.40 $300.00 $ 3,00.0 P-152-3 Unsuitable Material Excavailon & Re acmert 10 CY $ 32.00 $ 320.00 $45.00 $ 450.00 P-1524 PCC Pavement Removal 3,10 BY S 9.00 $ 27,90.00 $14.00 $ 43,400.0 P-152-5 Remmre ExlsBn TrMCM1 Drain 915 LF $ 2].80 $ 2],10500 $35.00 $ 34,12500 P-1526 Remove Exislin Oreina eBonaire 2 EA $ 1,865.00 $ 3)3000 $1,7W00 $ 314000 P-152-7 Remove Existing UMer Drain 975 LF $ 11.82 $ 11.52460 50.00 $ 700.= P-1524 Remove Pavement Malin 425 SF $ 4.50 $ 1,91250 $5.00 $ 2,125.0 P-153-1 ConVolbd iren Lav SM1Malerial 10 CY $ 120.00 $ 1,21100 $125.00 $ 1 250 P-1541 Subbase Can" 100 CY $ YF.00 $ 2,400W $32.00 $ 3,20.0 P-209-1 Crashed Aggregate Base Course 850 CY $ Woo $ 301800= $50.00 $ 42,500= P401-1 leguminous Concrete Pavement 3BW TON $ 70.25 $ L1_20 $139,00 $89.00 $ 248,400= P-501-1 Cement Pavement PorIIBM Concrete30 3,15) BY $ 105.00 $ ,7WW $11].00 388.55000 P -m2-1 Bituminous Prime Coat 700 GAL $ 7.00 $ 51460.W 58.00 $ 4,00.0 P603-1 Bgumiraus Trod Coat 3,30) GAL $ 4.50 $ 14,850.0 54.00 $ 13,200= P620-1 Taxilane CeMrlirw Marki 1,30 SF $ 2]5 $ 3,575.W $2.70 $ 3,510m P6314 Refined Coal Ter Emulsion w/Addgives for Slurry Coal 11 No BY $ 1.70 $ 18.]00.0 $180 $ 191800.W D-701-1 24" ReirdorcM Concrete 1 (CLAVI 420 LF $ 69.50 $ 29,1W W $80.00 $ 33,60.0 D-701-2 30' Reinforced Concrete . t (CLAVI240 LF $ 84.00 $ 20,160.= $9500 $ 22,800.00 0.701-3 14'OuGlle Iron Pi 90 LF $ 181.65 $ 16,348.60 $190.00 S 17.100.00 D-7014 14"FIs rVolve 8 EA $ 2,140.00 $ 17,120W $1,500.00 $ 12,OW.00 0.7054 5" Perforated Underdrain 810 LF $ 23.65 $ 19.156.60 $2500 $ 20250.00 0.705-2 UMerdein Cleanout 3 EA $ 1,290.00 $ 3,89400 $95000 $ 2,850.00 0-751-1 4 Ft. Dlameler Manhole 2 FA $ ],150.00 $ 1,30000 $4,00000 $ 8,OW.00 0.751-2 6 FDrDlameW Manhole 3 E4 $ 9,800.00 $ 29,40000 $8.00000 S 24,000.00 D-751-3 8 Ft. Diameter Manhole 1 EA $ 19,980.00 $ 19,90.00 $19,000.00 $ 191000.00 07514 OYANaler85ediment Sa rotor 2 E4 $ 74.168.00 $ 148,336.00 $55.00000 $ itO,OW.Oo D-751-5 6 Ft. Diameter Catch Basin 1 E4 $ 7,860.00 $ 7,80.00 $14,00000 $ 14,000.00 D-]524 Trench Drain T' 781 LF $ 51300 $ 400,6530 $49000 $ 382,690.00 Total Bax Bid: $1,723,41200 I $1,741690.00 a� I s Sargent Corporation SfillwMer, Maine The Lane Construction Corp. Me n. CT ITEM NO. DESCRIPTION DTY. UNIT UNIT COST TOTAL UNIT COST TOTAL Adi illve AlMmaN No.1 M-002-1 Bituminous Concrete Sawed Copal Joint 1800 LF $ 400 $ ],800.00 $3.20$ 6.080.00 M-004-1 PanamNn Milling FDD k 2,]00 BY $ 2.75 $ )425.00 $4.20 $ 11,340.00 P-401-1 Bituminous Concrete Pavement 805 TON $ ]500 $ 60,37000 $6940 $ 55,545.00 P-5034 Bituminous Tack Coat 800 GAL $ 4.50 $ 3,60000 $400 $ 3,200.00 PR14 Retired Coal Tar Emulsion wlAdditives for Slur Coat 27W SY $ 1.70 $ 4,550.00 $2.30 $ 6,21000 Tobl Akernate No.t: $ 03590.00 $ 82375.00 Additive Alternate No. M-005-0 RMaimetl Base Course 2,550 BY $ 4.50 1 $ 11,47500 $5,001 $ 12)50.00 P-001-1 Bituminous Concrete Pavement 470 TON $ 83.00 $ 39,010.00 $75.00 $ 35,250.00 P4i02-1 BOuminous Prime Coat 1.250 GAL $ 7.00 $ 0,]50.00 $800 $ ].50000 Total AlternMe No. t: $ 59,2$5.00 $ 55,500.00 TOtaIBld Price: $1,866,237.00 $1,979,565.00 a� I s