Data: June P, zoos 07 190
Item/Subject. ORDER, Awarding Contract for Reconstrucdon of the Cargo Apron at Bangor
Inb:madonal Airport
Responsible Department: Airport
On Apol 11, 2007, the Qty received bwo (2) bids for the first phase of reconstruction of the Cargo
Apron (see attached bid tabulation). Funding for this project is as follmws: 95% Federal, 2.5% State,
and 2.5% local.
Edwards & coney, the Airport's engineering consultant, and City staff have reviewed the low bid
from Sargent Corporation and have found'tto be responsiveto all requirements of the bid request.
On May 21, 200], the Finance Committee reviewed and approved thestaff recommendation thatthe
contract be awarded m Sargent Corporation of WIwater in the amount of $1,866,237.
This bid award recommendation must be reviewed and approved by the City Council as It Is over
$1011,0W.
Department Head
Managees Cammrmm:
Recommend approval.
City Manager
AssociatedlnfomMDon: Bid Tabulation
X Passage
_First Reading Page _of_ -.
Referral
07 190
/•• essigmoa to councilor WExxlco yam: 11. zoorf
CITY OF BANGOR
(TIRE.) Order, Awarding Contract for the Reconstruction of the Cargo Apron at Bangor
International Airport
By rhe pry CooxNofthe CRyofbang=..
ORDERED,
THAT, Deborah Cyr, Finance Director, is hereby authorized to execute a contract
with Sargent Corporation in the amount of $10866,237 for reconstruction of the
Cargo Apron at Bangor Intemadonal Airport
IN CIT[ COUNCIL '
Tune Ila 2007
p d
g O]-190
T c
an"
Becooatutcfiou ofrthe Cana apernn at
Cly of Bangor
Bq Tabulation - Re ratrucl Cargo A9on-BIA
Bi00oeni-ONHIO]
Sargent Cor9 rstlen
Stillwater, aware
The lane Conntructlon Core.
Mercden, LT
IT NO.
OE9CRIPTION
QTY.
UNIT
UNIT
COST
TOTAL
UNIT
COST
TOTAL
Bees Bid
M0o1-1
E aYs FWd Office
1
LS
$
39,999.80
$
39,999.60
$80,000.00 $
EO,OL'1 W
M601-2
As -bunt Pians
1
FLS
$
3,O0W
$
3,00000
$3,00000 $
3AWA0
9602-1
Bilumlmus Concrete Sawed Control Jdnt
11,300
LF
$
400
S
45,20000
$320 $
301=,0
M-002-2
PCC Pavement Sawed Control Joint
4.250
LF
$
5 W
$
21250.00
$6.00 $
25,60000
Mbo3-1
Contaminated&it Removal aM Re acement
10
CY
$
law
$
1,480.00
$110.00 $
1,100m
M6044
Pavement Milli -5"Oe
11,00
BY
5
2.75
$
3,250.00
$4.20 $
46,200.00
M-0051
Reclaimed Base Course
1,450
BY
$
4.50
$
6,525.00
$5.00 $
7,25)0
M0061
Potassium Acetate StorageTank
1
LS
$
97w0.0
$
9].80.00
$60,000.00 $
0,000
P-152-1
Unclassified Excavation
1,050
CY I
$
17,20
$
18,00) 00
$16.00 $
16WO.W
P-152-2
Rock Exmwan
10
CY
$
47.24
$
472.40
$300.00 $
3,00.0
P-152-3
Unsuitable Material Excavailon & Re acmert
10
CY
$
32.00
$
320.00
$45.00 $
450.00
P-1524
PCC Pavement Removal
3,10
BY
S
9.00
$
27,90.00
$14.00 $
43,400.0
P-152-5
Remmre ExlsBn TrMCM1 Drain
915
LF
$
2].80
$
2],10500
$35.00 $
34,12500
P-1526
Remove Exislin Oreina eBonaire
2
EA
$
1,865.00
$
3)3000
$1,7W00 $
314000
P-152-7
Remove Existing UMer Drain
975
LF
$
11.82
$
11.52460
50.00 $
700.=
P-1524
Remove Pavement Malin
425
SF
$
4.50
$
1,91250
$5.00 $
2,125.0
P-153-1
ConVolbd iren Lav SM1Malerial
10
CY
$
120.00
$
1,21100
$125.00 $
1 250
P-1541
Subbase Can"
100
CY
$
YF.00
$
2,400W
$32.00 $
3,20.0
P-209-1
Crashed Aggregate Base Course
850
CY
$
Woo
$
301800=
$50.00 $
42,500=
P401-1
leguminous Concrete Pavement
3BW
TON
$
70.25
$
L1_20
$139,00 $89.00 $
248,400=
P-501-1
Cement Pavement
PorIIBM Concrete30
3,15)
BY
$
105.00
$
,7WW
$11].00
388.55000
P -m2-1
Bituminous Prime Coat
700
GAL
$
7.00
$
51460.W
58.00 $
4,00.0
P603-1
Bgumiraus Trod Coat
3,30)
GAL
$
4.50
$
14,850.0
54.00 $
13,200=
P620-1
Taxilane CeMrlirw Marki
1,30
SF
$
2]5
$
3,575.W
$2.70 $
3,510m
P6314
Refined Coal Ter Emulsion w/Addgives for Slurry Coal
11 No
BY
$
1.70
$
18.]00.0
$180 $
191800.W
D-701-1
24" ReirdorcM Concrete 1 (CLAVI
420
LF
$
69.50
$
29,1W W
$80.00 $
33,60.0
D-701-2
30' Reinforced Concrete . t (CLAVI240
LF
$
84.00
$
20,160.=
$9500 $
22,800.00
0.701-3
14'OuGlle Iron Pi
90
LF
$
181.65
$
16,348.60
$190.00 S
17.100.00
D-7014
14"FIs rVolve
8
EA
$
2,140.00
$
17,120W
$1,500.00 $
12,OW.00
0.7054
5" Perforated Underdrain
810
LF
$
23.65
$
19.156.60
$2500 $
20250.00
0.705-2
UMerdein Cleanout
3
EA
$
1,290.00
$
3,89400
$95000 $
2,850.00
0-751-1
4 Ft. Dlameler Manhole
2
FA
$
],150.00
$
1,30000
$4,00000 $
8,OW.00
0.751-2
6 FDrDlameW Manhole
3
E4
$
9,800.00
$
29,40000
$8.00000 S
24,000.00
D-751-3
8 Ft. Diameter Manhole
1
EA
$
19,980.00
$
19,90.00
$19,000.00 $
191000.00
07514
OYANaler85ediment Sa rotor
2
E4
$
74.168.00
$
148,336.00
$55.00000 $
itO,OW.Oo
D-751-5
6 Ft. Diameter Catch Basin
1
E4
$
7,860.00
$
7,80.00
$14,00000 $
14,000.00
D-]524
Trench Drain T'
781
LF
$
51300
$
400,6530
$49000 $
382,690.00
Total Bax Bid:
$1,723,41200
I $1,741690.00
a� I
s
Sargent Corporation
SfillwMer, Maine
The Lane Construction Corp.
Me n. CT
ITEM NO.
DESCRIPTION
DTY.
UNIT
UNIT
COST
TOTAL
UNIT
COST
TOTAL
Adi illve AlMmaN No.1
M-002-1
Bituminous Concrete Sawed Copal Joint
1800
LF
$ 400
$
],800.00
$3.20$
6.080.00
M-004-1
PanamNn Milling FDD k
2,]00
BY
$ 2.75
$
)425.00
$4.20
$
11,340.00
P-401-1
Bituminous Concrete Pavement
805
TON
$ ]500
$
60,37000
$6940
$
55,545.00
P-5034
Bituminous Tack Coat
800
GAL
$ 4.50
$
3,60000
$400
$
3,200.00
PR14
Retired Coal Tar Emulsion wlAdditives for Slur Coat
27W
SY
$ 1.70
$
4,550.00
$2.30
$
6,21000
Tobl Akernate No.t:
$
03590.00
$
82375.00
Additive Alternate No.
M-005-0
RMaimetl Base Course
2,550
BY
$ 4.50
1 $
11,47500
$5,001
$
12)50.00
P-001-1
Bituminous Concrete Pavement
470
TON
$ 83.00
$
39,010.00
$75.00
$
35,250.00
P4i02-1
BOuminous Prime Coat
1.250
GAL
$ 7.00
$
0,]50.00
$800
$
].50000
Total AlternMe No. t:
$
59,2$5.00
$
55,500.00
TOtaIBld Price:
$1,866,237.00
$1,979,565.00
a� I
s