Loading...
HomeMy WebLinkAbout2006-11-27 07-028 ORDERItem No, Date: November 27, 2Aop 07 028 Item/Subject: ORDER, Author zing the City Manager and/or Airport Dbectorto Enter into a Professional Service Agreement with Edwards and Kelcey for Engineering Services for Phase 1 of the Reoonstrucion of the Cargo Apron Adjacent M the International De-ldrg Red, Taxiway A, Tango Row, and Do& 10. Responsible Deparbnent: Airport Edwards and Kelcey is the approved Airport Engineer for Airport Improvement Projects(AIP). Thlsprojectis for the reconstrudion design of approximately 20,000 square yards of deteriorated concrete pavement, replacement of approAmately 1,000 fe rtof trench drain, and improvements to the existing drainage system to Bing the system uptowdaysstandards, and theconstruction of a major oil -water separator at Me ourfall of the ramp drainage system. nIslaterpmjedisanelememofwroveralleffonWimprove Mequalityof storm water leaving the Airport. Total engineering costs are e0mated to be $297,985. Federal funds will aver 95% of the cost. TheState a Maine and the Airport will each fund 21h%, and the Airport's share is avallade in this years of ealing budget. Department Head Recommend approval, as does Me Finance Committee. The Committee requested further Information on the Airports mulff-year Airport Improvement Mans. This Information will be separately Provided to the Council. In addition, "will review these plans with the Transportation and Irtras[mcture Committee In Me near future. N Xa✓Y Finance Director FirstReWing Page—o _Rete raadinp papa _o!_ Retertal �: M6gaul to Councilor a•Exiico Xvnr maer 27, 2006 CITY OF BANGOR TITLE. ORDER, Authorizing the City Manager and or Airport Director to Eller Into a Professional Service Agreement with Edwards and Kelcey for Engineering Services far Phase 1 of the Reconstruction of the Cargo Apron Adjacent to the International Deicing Pad, Taxiway A. Tango Row, and Dock 10. WHEREAS, Edwards and Kelcey is the approved Airport Engineer for Airport Improvement Pmjecis (AIP); and WHEREAS, the Airport desires to reconstruct the Cargo Apron adjacent to the International De -king Pad, Taxiway A, Tango Row, and Dock 10; and WHEREAS, the scope of design work will include the reconstruction of approximately 20,000 square yards of deteriorated concrete pavement, replacement of approximately 1,000 feet of trench drain, Improvements to the existing drainage system, and the construction of a major oil -water separator at the outfall of the ramp drainage system; NOW, THEREFORE, BE IT ORDERED THAT the City Manager and/or Airport Director Is hereby authorized, on behalf of the City of Bangor, to execute a Professional Service Agreement with Edwards and Kelcey In the amount of $297,985 and in a form approved by the (Sty Solicitor or Assistant Ory Sollftr for design of the phase 1 reconstruction of the Cargo Apron adjacent to the International De Icmg Pad, Taxiway A, Tango Row, and Dock 10. IA CITY C IL 'rovenher 27. 2006 Nation rade and Seconded for 'aeage Pas a i cxxy cLsa or Ai Po rc to thotiai[r E, n City Meager THE, g Mad and Professional Service Agreement with Edwards soul selcey for lotemneerl" se��ea or Phase I of the eecaontrvction o£ the Cargo Apron Adjacent to t utet t -lciag Pad. Taxiw9 A. Tango Eae . soul Dock 10 TI/ Aniguedb Couotlbr IJ tnM.C..O