HomeMy WebLinkAbout2008-09-08 08-292 ORDERItem. 08 292
Date: September 8, 2008
Item/Subje :Order,Granting Utility Location Permit to Bangor Hydro EleclncCompanytor Undergmund
Conduit — Exchange Street Courthouse
Responsible Department: Engineering
Commentary:
The attached Order will grant a Utility Location Permit to Bargor Hydro Electric Company for the installation
of underground conduit, primary cable, and concrete encasement originating from Manhole 53 to the
Courthouse at the intersection of Fxcbange and Washington Streets.
Al work Is to be done in accordance with applicable City Code, Ordinances, and any additional requirements
of the Qty Engineer.
No separate public notice of this application's to be made
V
Department Head
Recommend approval. �L tMW 1141—
City Manager
Associated Information: Order and Location Permit Application.
Finance Director
L.el;al Approval:
5 idm--
Introduced for
X Passage
_ First Reading Page _ of_
RMerral
AssiB d to Councilor Gratrlck
CITY OF BANGOR
DR 292
September 8, 2008
(TITLE.) Order, Granting Utility Location Permit to Bangor Hydro Electric Company for
Underground Conduit- Exchange Street Courthouse
By the City CWMW of ble Ory ofBar6or.•
fIUUa:ltlal
THAT a Utility Location Permit is hereby granted to Bangor Hydro Electric for the
installation of conduit, primary cable, concrete encasement, originating from
Manhole 53 to the Courthouse at the intersection of Exchange and Washington,
and
BE IT FURTHER ORDERED THAT all work be done In accordance with the City's
Street Opening Regulations and other requirements of the City Engineer,
NOTE: No separate public notice of this application to be made.
SH CTTL COYRCIL
September 8, 2808
Posed
_ L1Y CL
08-292
RD RR
�.l hautlne Dtllitc tacatian Pe t
to Rugor to electric Coryauy foz
nnder2ry and Conduit - Rtcbsuee Sfteet
Courthouse
Mu dm Cssmibc
?r
Mc. Art Morgan Auga125, 2008
Amamnt Chief Engineer
]4 Harlow
CityofBangor
Bangor, Me. 04401
BE: d FaUmr Permit Request-Extlaevge Street CaurWouse Slots Prtmary
Undergrouurl rouFaeiliHea. ,
Dora Art, _
Bangor Hydro Electric is requesting approval for the iutallaboll ofcondnit,
canc,ete mcaeem nt end primary cable at 12,470 Volts to be installed8[ &a following
location:
• Primary Cable and conduits Qty (6)- 4" concrete encased originat'iM from BHB
Manhole 53 to One Cowthow" the ieansecdon ofExcha,ge and Wasbington St.
Binger ME.
A site plan and a detailed plot are pmvided indicating the approximate locntia, of the
w.nities to be installed at Hu intersection ofacl aige and Washingmn Strects.
Surveyed plane will be suhmitted to the City ofBeager Won completion ofthe
iwlallatim of said Urtlerground Facilities. Approval ofthle installation would be greatly
appraciateA and will allow the overall project m,emain on schedule.
Sincerer e I
-N®S.9altya-
. Evgweall
BaWvT Hydro MmUic Co.
P.O.11ox 932
Ea1ger,ME044o1
z1oma -ourl wsaazi �r
u.o..r fwm -vn nuce+ ,Mw. err
I
AAv
Alf t 1 "( fY ^j -
�1
t i j,Al
a y
1
1 Ir
4v �
�I
1
el
ry
I
p
Af
s
�
XVI
PillVD-zc
xme're
n
T
°y'y�—
y
c
c
A
Wr-
-Wil _.-
J
J1
U6'.
UG— V4
VG
Bill Alfp
14
.