HomeMy WebLinkAbout2008-08-25 08-282 ORDERCOUNCIL ACIION
08 282
Item No_.
Date: August 25, 2008
Item/Subject Order, Granting UU14 Laatlon Penult to Bangor Gas, LLC for Installation a Gas Main
Unes on Essex Street
Responsible DeparDneat: Figinesdng
The attached Order will grant a Whiny Location Permit to Bangor Gas for installation of a 2" natural gas line
and 1" service line beginning at Essex Street and York Street intersection, continuing north on Essex Street
and crossing sidewalk area to provide service to 36 Essar Street for a distance of 115 feet
All work is m be done In accordance with applicable City Cade, Ordinances, and any additional requirements
of the City Engineer.
NOTE: No separate public notice of this application is m be made.
U �
Department Head
Manager's Comments:
Recommend approval.
City Manager
Associated Information: Order and Location Pem t Application.
Budget Approval
Finance Director
X Passage
Find Reading Page _ of _.
—Referral
08 282
Assiguea to Councilor stone Augost 25, 2008
CITY OF BANGOR
(TITLE.) Order, Granting Utility Location Permit to Bangor Gas, LLC for Installation of Gas Main
Lines on Essex Street.
By the Clly Council of the Oiy of Bangor:
THAT a Utility Location Permit is hereby granted to Bangor Gas for the installation
of 2" PE gas main and 1" service line beginning at the Essex Street and York
Street intersection, continuing north on Essen Street and crossing sidewalk area to
Provide service to 36 Essex Street for a distance of 115 feet as described in the
attached pennd application; and
BE IT FURTHER ORDERED THAT all work be done in accordance with the City's
Sheet Opening Regulations and other requirements of the City Engineer.
NOTE: No separate public notice of this application to be made.
IB GPxe GBBBGLL
August zs, zone
Pee to y nx—zaz
xz cLsO
CrME) ry uLiUl ➢ f i v Loutiob Permit
to Bangor Gas LLC for Installation of Gas
i = Street
A6eipWmCosxgsr SVY.Y'
Bang r��Gas 08 282
The Natural Choice
LOCATION PERMIT APPLICATION
FOR
BURLED NATURAL OAS PIPELINE
To the Bangor City Council
Bangor Gas Company, LLC respectively requests permission to place and maintain buried pipes, valves,
caps, valve boxes, manholes, tracer wires, warning tapes other fixtures in along, under and across
pornow of the surface of the public streets and highways as father described in the attached cable titled
"Locaron Permit Request".
The above ref ed pipes and other fixtures will be placed in accordance with the enclosed plan
shcets. The plans are prepared on Base Maps generated from aerial photography. The atrial
photography was taken on November 19, 1998.
In conjunction with this location application, Bangor Gas Company, LLC also request permission m
place and maintain the previously described pipes and other fixtures in, along under and across the
above intersecting public ways for the purpose of making connections with such other portions of the
rumral gas distribution system and buildings as may be desired for the purpose of distributing natural
gas.
Respectively submitted by:
Z6�/ g?
Patrick Tubbs
Bangor Gas Company, LLC
August 15, 2008
City of Bangor Location permit Approval
Date:
Y08m980 8,na alre 0 0](800 rm:IMJIWmlo1
Fvw qhr&. T Num Srery-sucrsM ea0dd01
OR 29.2
Bangort_Aas
The Natural Choice
LOCATION PERMIT REQUEST
FOR THE
INSTALLATION OF NATURAL GAS DISTRU13UTION MAINS
WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OF THE
CITY OF BANGOR
As an integral part of the development of the natural gas distribution system for the
City of Bangor, Bangor Gas proposes to install polyethylene natural gas system
piping within the road and street right-of-ways. Um pipe material will be l E 2406,
medium density polyethylene gas pipe. The pipe color will be yellow, in
compliance with the mtional color code standards for utilities. The pipe will be
installed by treauddess and/or conventional open cut ditch methods. All gas maim
will be installed a a minimum depth of three feet bellow finished surface grade.
Ref to the attached plans and table below for details oftbe proposed construction.
Proposed Location Summary Table
Location
From
ToLinear
Feet
Edex S"d
Theutd&=dwofE=xmd
Yoh Str t
36Essex Sneel
115
Sm 990, B,p,, N.w OUO2WaO-PM :120719419595. rm'. ]0]194Ic101
rwm,Gndlre 21h.rS r. o,W,, MVIm. 04401
BangnrOGas
The Natural Choice
21 Main Street, Bangor, ME 04401
Phone: (207) 941-9595 Fax: (209) 942-0101
City of Bangor, Maine
Application for Street Opening Permit
Location of Work: 36 Essex Street
Description of Work:
Install 1" PE Service Line and 2" PE Main Line
Proposed Start Date: 8/20/08
Anticipated Completion Date: 9/20/08
Customer Name: Robert Verrill
Contact Person: Patrick Tubbs
Fee: Annual
Location
Excavation
Size
Trench
Length
(FT)
Pipe Size
(IN)
Streak
Workivg tram
Attempt HDD
35a
1"PE pipe
shoulders
Esses anti
Bore or ]8'
sidewalk mtl
York Street
Trench Width
private
Ivtemor on,
Property
covanofag
115B
2"PE pipe
north on
Essex Street
and crossing
sidewalk area
onto private
'b
N
N
RESSOVE) FILE RISE LED FILE MoT
Sol—
OF
FALL OF SIDE WUME FILE
PROPI AN g RED DEE OLD TREE
OFFER, 1I FILE! 1111 11
DEC
ESEFORE DELI IF CI THE
go
mm ory n[ CARRIERS
5'i
R,
logo LI
RXERCH OF WE SI FLOOR
N
FEE OR oconcoolom
PURI"
\ �
t..itSOLIELE'll-
a
n m« e
J
Do SLY DRIVE RO L
��
"D FFELELL
�woana
61 GONER
SEES 11
IS
1 Vow
75 , ve iu mo
3
e
i .�lev ti
�
L -c '- o
OP
SEER
11 � m
vv :e^dXL
59—
ED
EDGE SM' tY S'\aG e
/ 1 2 FELLER,
'Ell'Pommw
OD tem�eu,wx
H!VE OYU GaH
.�
EO0 SM' GEN
g
ue xort z ua
q N 50
E3
RR
RE
'b
N
N