Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2008-08-25 08-280 ORDER
COUNCIL AMON nem No, O8. 28.0 Date: August 25, 2008 Item/Subject• Order, Granting Willy Location Permit to Bangor Gas, LLC for Installation of Gas Main Unes on Texas Avenue. Responsible Department: Engineering Commentary: The attached Order will grant a Whirr Location Permit to Bangor Gas for Installation of a 2" natural gas Ilne and 1" service line beginning In the shoulder area on Texas Avenue and continuing across Texas Avenue to Bangor Savings Bank located at 203 Maine Avenue for a distance of 310 feet. All work is to be done In accordance with applicable CM Code, Ordinances, and any additional regulremems of the City Engineer. NOTE: No separate public notice of this application Is to be made. n V Department Head Managees Comments: Recommend approval City Manager Associated Intormation: Order and location Permit Application. Finance OVector Legal Approval: CM1lidtor A— Passage _ First Readin Page—of— Radial aIP:_of_Referral CITY OF BANGOtR �� ar 08 280 August 25, 2008 (TITLE.) Order, Granting Utility Location Pent to Bangor Gas, LLC for Installation of Gas Main Lines on Texas Avenue. By the Oty Cwml of the Co of&ngor nanx�aa THAT, a Utility Location Permit is hereby granted to Bangor Gas for the Installation of 2" PE gas main and 1" service line beginning in the shoulder are on Texas Avenue and continuing across Texas Avenue to side of Bangor Savings Bank located at 203 Texas Avenue for a distance of 310 feet as described in the attached permit application; and BE IT FURTHER ORDERED THAT all work be done in accordance with the City's Street Opening Regulations and other requirements of the City Engineer. NOTE: No separate public notice of this application to be made. m cin wwcu saga g zs. zcoe cine ©e 6ren[iag O[y Laca[iw Yermi[ [o Bmgar�Ta c Eor Im{ a u a£ Qs !lain Lines on Teras Avenue .. F IF ,>M0•=— �/ 8 QRO Bangor _ Gas The Natural Choice LOCATION. PERMIT APPLICATION FOR BURIED NATURAL GAS PIPELINE To the Bangor City Council Bangor Gas Company, LLC respectively requests pernissrom to place and maintain buried pipes, valves, raps, valve boxes, manholes, tracer wires, warring tapes other fixtures in, along, under and access potlions of the Furfxe of the public shnets and highways as father describe l in the attached table titled "Location penult Request''. The above referenced pipes and other fixtures will be placed in accordance with the enclosed plan sheets. The plans are prepared on Base Maps seasoned from aerial photography. The aerial photography was taken on November 18, 1998. In conjunction with this location application, Bangor Gas Company, LLC also request permission to place Ford maintain the previously described pipes and other fixtures in, along under and across the above intersecting public ways for the purpose of making connections with such other portions of the natural gas distribution system and buildings as may be desired for, the purpose of distributing natural gas. Respectively submitted by: ,o�ef/40f� Patrick Tubbs Bangor Gas Company, LLC August 5, 2008 City of Bangor Locatlon permit Approval Daze: Po Bra 980 Bsp Mar.OaON%BO. Phna 1201194IV595. rm; 120]194]0101 For mernw der r .21 Fo,";r a, Btler vow 04f01 08 280 Bangor Gas C The Nowrol Choice LOCATION PERMIT REQUEST FOR THE INSTALLATION OF NATURAL GAS.DISTRUBUTION MAINS WITHIN THE ROAD AND STREET RIGHT-OF-WAYS OF THE CITY OF BANGOR As an integral part of the development of the natural gas distribution System for the City of Bangor, Danger Gas proposes to install polyethylene lmtmal gas system piping within the road and street right-of-ways. The pipe material will be PE 2406, medium density polyethylene ges pipe. The pipe. color will be yellow, in compliance with the national color code standards for utilities. The pipe will be installed by trenchless and/or conventional open cut -ditch methods. Ali gas mains will be installed at a minimum depth of three feet bellow finished surface grade. Refer to the attached plans and table below for details of me proposed construction. Proposed Location Summary Table Location From To Liaear Fee[ Texas Avenue TM intagal Texas Mahn AnnueaMTevs Avwue 20l Mtir¢ Avewe 310 r Dm990. eygw,Mmm. O"029 80. Tell 120M9E1v595 rw'. 2011941c101 Fac,,GM&�ws 21 Ak, Sml. Ewgeo A ,,, N40I na 28O Banpo Gas TheNatural Choice 21 Main Stteel, Bangor, ME 04401 Phone: (207) 941 9595 Fax: (207) 942-0101 City of Bangor, Maine Application for Strect Opering Permit Location of Work: 203 Maine Avenue Description of Work: Install2" PE Main Line and I"PE Service Line Proposed Start Date: BoUnt Anticipated Completion Date: 9/8/08 - - Customer Name: Bangor Savings Bank Contact Person: Patrick Tubbs Fee:Annual Location Excavation Size Trench Length (FT) Pipe Size (INI Shoulder, Beginning in Attempt HDD 90ft 1"PEpipe street and shoulder area Bore or 12" private on Texas Trench Width property Avenue and continuing across Texas Avenue to side of building Shoulder, Beginning ba Attempt HDD 310ft 211 PE pipe street and shoulder area Bore or 12". private on Maine Trench Width property Avenue and -continuing - across Maine Avenue to the southeast side of Texas Avenue BangoroGas �R 'R°1yescurd Choice 21 Main Street, Bangor, ME 04401 Phony (207) 941-9595 Fax: (207) 942-0101 _ City of Bangor, Maine Apphoation for Street Opening Permit Location of Work: 30 Venture Way Description of Work: Install P' PE Service Line Proposed Start Date: 8/8/08 Anticipated Completion Date: 9/8/08 Customer Name: Challenger Learning Center Contact Person: Patrick Tubbs Fee: Anumd Location Excavation Size Trench Length (FT) Pipe Size (IN) Shoulder and Beginning in Attempt HDD 40 ft 1" PE pipe private shoulder area Bore or 12" property on Texas Trench Width Avenue and conbnuiugm side of building =" a WON1� — KI PNEONE NUMBER 15 510 -MBI _— N=I ,,M BI SMALL BE MNI �ANT ENE OFF OFF SAMOR MEL FIE 1,MT, Im MEN �_ a Emm ® F5" MES ® IMUM 7111,. zoa ,NUM"U,- 4 THE SAM S OFFEEN ME WE FEE MEN NUM USE AN EAMEMENT SPEECH SELFUL I THE KNEW, WMALLATISH 8F COMBINE m[[mma[[usxnx7,F SEEN' ✓I IBE 6' ElEEL FEE pNE11E m g 4 'w I MIL NN, MUNIMP FEE SUM MEN M No SELL I � `x� _ � xmuzwow¢euwWEEK C g g wwux mm xnx mne KENN OM MEN WE I OF I OGO I- EME "MME C--