HomeMy WebLinkAbout2007-09-10 07-291 ORDERItem Ro. 07 291
Date: September 10, 2007
Item/Subject Granting Why I-ocetknn Permbto Oxford Netwoftfor Underground fiber Optic Service-
Odlin Road
Responsible Department Engineering
Orford Networks is developing a fiber optic system in the Bangor region
The attached Order will grana Utility Location Permit to Oxford Networks for the installation of 1500'offiber
optic between Pole 4 and Pole 52/12 on Win Rnad. Condult will be placed 3' deep and will start at Pole 4,
extend approximately 50'on same side of road, cross Wlin Road to approximately 3'aff pavement on other
side, continuing m Pole 52/12
All work isto be done in accordance with applicable CM Code, Ordinances, and any additional requirements
of Me pry Engineer.
NOTE: No separate public notice of this application is to be made.
9� T)
DeparMrent Head
Manager's Comments:
Recommend approval. Q
21 c�
qty Manager
Associated information: Order and location Permit Application.
ItudgM Approval
Hnance Director
Passage
_
First: Reading Page _ Pf _
Referral
nssiaoea to covaraior a•errsro 07 291
CITY OF BANGOR Sept er log 2007
�9
(TITLE.) Order, Granting Utility Location Permit to Oxford Networks for Underground Fiber Optic
Service — Odlin Road
By the City Council of the qty of Bangor
THAT a Utility Location Remelt Is hereby granted to Oxford Networks for the
installation of fiber optic between Pole 4 and Pole 52112 on Win Road for a
distance of 1500'; and
BE 1T FURTHER ORDERED THAT all work be done In accordance with the City's
Street Opening Regulations and other requirements of the City Engineer.
NOTE: No separate public notice of this application to be made.
ID CIW CODPCIL
sttptpter 10.2007
pool
p 0]-281
CITY Cf.®A ORDER
(FpILA LINK Ml I Iry]xezefmPne t,K9
Mford Netwr" foi Dudergrowd Fiber Optic
1
Assigned to Coundlnr� /yt��M1/LLQ
g 6
wmaw„n t WO#
aectim ua Wwand I BGP0701
Is]]e,1aa'k
521 Airport Runway
12
X 1500'
4' off edge
Oath Rd of pavement
3' deep
I
I_
70
5'
Wil�,+a
saws 'P pow w —' VZ
Ladd" Ra* 4
Install 1500' of 1.75" Innerduct and 144F between VZ Pole 4 and Pole
5V12 on Ochn Rd, Bangor(w/tracer wire). Conduit will be 3' deep and
will start @ Pole 4 go Approx 50' same side of rd then will push across
Oclin Rd to approx 3' off pavement on other side of road and then
mntlnue to pole 52112.