Item/Subject ORDER, Authorizing Implementation of Certain Fare Increases for
MT/Community Connector
Responsible Department: E ecutloe BAT/Community Connector
For the past several months, transit consultant Tom Crikelair Associates, has been
reviewing various operational Issues regarding the BAT/Community Connector transit
system. To address significant problems identified on the Capehart Route, the
Consultant has recommended adding a third bus during peak demand times. To assist
with offsetting the cost of making this route improvement, Crikelair also proposed
revising the System's fare schedule. The last genal fare increase occurred four years
ago in October 2003, and the revised fare structure will assist in offsetting overall
operating costs. The required Federal Transit Administration notification and comment
period regarding the proposed increases has been completed with no concerns nor
opposition expressed. Both the addition of the third bus and the revised fare schedule
were discussed and included in the approved FY08 budget. The Order would adopt the
revised fare schedule with an effective data of September 1, 2007,
Department Head
Managers Comments: This revised fare schedule has been reviewed and recommended far
approval by the Government Operations Committee at is August 14m meeting.
Oty Manager
Associated Information: Order, Related background Information
Budget Approval:
/
Finance Director
Legal Approval:
dtor
Intmtluced far
x Passage
_ First Reading Page _ of _
Refamal
47 282
r
AsstpedroCovnamr Bavea eveoac 27. 2007
CITY OF BANGOR
(TITLE.) ORDER, Authoriring Implementation of Certain Fare Increases for BAT/Community,
connector
WHEREAS, the last general fare increase for RAT/Community Connector occurred four
years ago in October of 2003; and
WHEREAS, the Transit Consultant, Crikiiar and Associates, that was retained to
evaluate overall system operations, including the fare structure, has
recommended Increasing rates; and
WHEREAS, the proposed rate revisions will help offset increased operating costs and
the cost of adding a needed third bus to the established Capehart route;
and
WHEREAS, the required Federal Transit Administration (FTA) notification and
comment period regarding the proposed increases has been completed
with no concerns nor opposition expressed.
NOW, THEREFORE, BE IT ORDERED BY THE CITY COUNCIL OF THE CITY OF
BANGOR THAT
the following pricing schedule is hereby adopted:
• Full cash fare: $1.00 (from .80)
• One-half (1/2) price cash fare: $.50 (from .40)
• 5 -ride strip of tickets: $4.00 (from $3.00)
• Monthly pass: $40.00 (from $30)
• Student monthly pass: $20.00 (from $17)
BE IT FURTHER ORDERED THAT
the effective date of these increases shall be September 1, 2007.
ka�t 27, 2007
for Passne
r- a
g W-zez
ORDER
(UTLEJ AutfiotYalve I�lesmtaefun of
Certain Pale Intr¢aes for enx/
AssigedtoCoundior
07 292
MEMO
To: oararmwot op«e tom
From Jce McNeil
oma July 24, 200]
$ubJeet: Froposed Pare Increase
It was remmmeMed by Tom Cr elav Aamcistes to mtu>ier a fare increase in May
200 in belp of mit the ma of adding a Simil bus to the Capehart Rome(see mmchnrent).
We tM with the Finance Commiace which gave us duration to Monet with the
nmmeazyrequhanmterc WWmoveforwardwithtitsaideavor. on Juno26,200]
we the mmmmt period atW on July 26, 2007 we will have completed the 60
day notice requrtenwm. We have fulfillW the vecawyragnueaiems pursuant to lTA
Cumlar 90301A evd palling Fmmce Committee and Council Approval, weareredy
W implement the foMwingf increases on$gdemba 1, 2001:
• The ful6caah 6mwR1'vrmeau from.85 [o $1.00
• The5lpriceipeft willincremetiomm$3m00
• The S-rrnlilyimwilkemw0efixim$fiem30.00 to $4.00
• ThetmmWYpasswillin wfli vm$34m $1
• The audm trov[h1Y Wss wRlmamse Som $1]to I20
07 282
BAT Community Connector
Impact of Fare and Route Adjustments
Fare Revalue: Tom Gikelair Associates has Proposed an across the board fare
Increase for the BAT Community Connecta (single ride, monthly passes, strips). R
is estimaretl that these proposed changes would generate $81,40D In system wide
revenue annually, with BangDrS share being approximately 70% or $57,000.
Add 3rd Bus: The CaPehart route has serous on-time Problems. Several possible
maladies were reviewed. The recommendation is to add a 3rd bus during the
busiest hours of the day. The annual cost m operate this 3rd bus is $88,500. The
total cost of which would be the responsibility of the City of Bangor.
The Proposed N 2008 budget Pm)eds a required subsidy to operate the BAT in
Bangor in the amount of $352,1DD, this represents a $79,000 or 29% inaaase
over FI 2007.
Recommendation: The issue with the Capehan route must be addressed in one
manner or mother. The choices being I) add a 3rd bus or 2) eliminate bus service
0 Certain off -mute to y ns.
See attached memorandum from Tom Cnkelar Associates for more detailed Info.
Sept IS
051A
Nov 1st
Dec 1st
3a 1st
Increase in Fare Revenue
47,500
42,750
36,000
33,250
28,500
Inc in Expenses to add 3rd Bus
73,750
66,375
59,000
51,625
44,750
Net Budgetary Impact
(26,250)
(23,625)
(21000)
(18,375)
(15,750)
Fare Revalue: Tom Gikelair Associates has Proposed an across the board fare
Increase for the BAT Community Connecta (single ride, monthly passes, strips). R
is estimaretl that these proposed changes would generate $81,40D In system wide
revenue annually, with BangDrS share being approximately 70% or $57,000.
Add 3rd Bus: The CaPehart route has serous on-time Problems. Several possible
maladies were reviewed. The recommendation is to add a 3rd bus during the
busiest hours of the day. The annual cost m operate this 3rd bus is $88,500. The
total cost of which would be the responsibility of the City of Bangor.
The Proposed N 2008 budget Pm)eds a required subsidy to operate the BAT in
Bangor in the amount of $352,1DD, this represents a $79,000 or 29% inaaase
over FI 2007.
Recommendation: The issue with the Capehan route must be addressed in one
manner or mother. The choices being I) add a 3rd bus or 2) eliminate bus service
0 Certain off -mute to y ns.
See attached memorandum from Tom Cnkelar Associates for more detailed Info.
�)I 292
May 1, 2()(17
MEMORANDUM
To: Ice Moffat
Flnm: Tong Isar
Subject: Propuai cbnnges to We Cspehan route, proposed BAT faze increase
CC Don Cooper,BA(7pS
This memmandum Mentifiu We mtiaipesed cost to the airy of Bangor for adding a Wird
bus to the Cepehmtrouss, ItmaiuduaWa ssimdapmposed BATCommunity
Connec[m fareinemnse duignetlin pattmogee[We canoffiting We Capehmf aervitt.
The Cepefan mute fa«s senoux oo-umeperfomavice problems, in pan bcauu of
ua diversions esweoff-rave tosarispeettutlifGwh, ifnotf thesside,a
upsets, Weaveren[ schedule within We legal serol Bosh inning man o[ We serviadey.
We identified three altemative strategies for We Capehat Route:
(1) Streamfine the route by discontinuing service to off -roods, locedons
(2)Sounmlwathe Capehmt room by saving moss butiom with oWa BAT routes
(3) Add a Wed bus to We Capehat mute dwing the busies and man congestetl hours
of Waday
We did on pumne We first approach, because we'fecogmiud Wm dm only aotl its naosit
panmux would not adept elimination of bus s W We sirpon, We Depardmwt of
Human Services. and! Important medical offices. We found no way in maintain reliable
30-minub serviro on We tome with only two buses without eliminating thus slops.
We spent ronsidmabk tune looking fmweya to remnfigom existing fwtu b avoid she
expwseof adding atMN bm mtha Cepehartroute. We fwnd vo waymacwmpliah Wu
wiNoot maosfeeingoo-time problems m oWa BAT roums.0urremmmendW solution is
ei add o Wird bus to We Cepehenrome, Waiting atldhionm service hoors b e single
inclughtding
ing Weur iv� shift, This u requireowntown B ngor. Mo with two buses up b and
ioaiudiog Neuld begin d10:15 fmmdowmowa Bangor. Mon minted three -bus
scbaWlu would begin at IOaS >m.
07 282
The resulting timetable is pmsentol in Figure 1. Shatlal tines show operation of the
dlird Capehart boa. Thu bus wouldppume 7.3 hours Mdsy, resahieg in 1,833
weekday hilum and 381 SaRWey pours. At $40 Wbaa, the pmleRed cess is $73.283
for weekday service and $15,232 for Saturday service. The cembja W tort for a spud bus
Nat opuetea am days a week "88515.
_.__...--- .. _. __... _.
Flgaae I 3°ropud Capahart Sapdar4
A intlin¢v asps®�qom au�vu upcmn wa.
>IiM
bryrt
Sage
fMXC
girywa
m
Cepa-
Cm»-
Sta
g1yaR
Ba or
Itll
NYI
TeplviY
wt
NI
TaaFal
Mal
ponot
6:06a
6:18a
6258
6:35a
6:152
6.23a
6.25a
R
-
6:$6a
GAO
655a
7:053
6:45 a
6:53 a
6:55 a
R
-
7A6 a
-
725 a
735 a
7:15 a
]:23 a
7:25 a
R
-
7M&
-
7:55 a
8:05 a
7N5
7:533
7:55a
R
Bm a
8:25a
8:35a
8:15a
$23a
8:25a
R
-
3:368
-
855a
9=a
8:45a
8:53a
BSSa
R
-
9:O6a
-
9:258
9:350
9:15a
9:23a
9.25a
R
-
9:368
-
Was
IUSa
9:458
9.53a
9:59a
R
-
10:06a
-
1Q25a
IWSa
I W 5 a
1023a
IWOa
10:358
10:5Da
10,558
11:108
11204
1125a
I Q45a
7 0:53 a
11:Ooa
11 05,
1120a
11:25a
11:40a
11:50a
1205
11:45¢
11:53a
12Mp
12Mp
12:20p
12,25p
12.40p
12:50p
1:0
12:15
12:23
1 WO
12:35
12:50
12:55
1:10
1:20
1:35
1:15p
1.23p
1:30p
1:35p
150p
1:55p
2:10p
2:20p
2:35p
1:45
1:53
2:W
2A5
220
2:25
2. 0 a
2:50 D
3:03
2:45p
2:53p
3UDp
3:05p
320p
3:25p
3:40p
3:50a
4:OSp
3:15
3:23
3:30
3:35
3:50
3:55
4:10
420
4:35
4:15p
423p
4:3Dp
4:35p
4:50p
4:55p
5:10p
5:20p
5:35p
L 9:45
4:53
5A0
SAS
5:20
5:25
5:40
5:50
6.-05
5:45
5:53
G.W
6:05
6:20
6:25p6,40
6:50
7p5
A intlin¢v asps®�qom au�vu upcmn wa.
fi7 282
Local partxm shmldmnsiw a modest admtment in BAT Covmmny Connor bxes
mhelP offxt inaeasM wd, rtpeb, mA msimenaocemrts. Afareimreuc will ileo Xeip
the MY ofBmgw PaY fw tde operadav o(aa eddiew,al Xus m Ne CepeYm emre.
The ben sholegy fw the BAT system appears m be to waeae bolb dm $.85 singbride
caAS fare mddk$34 b6mPoy pw by T8%. TIES wMldrtsuTfm a 6iogie-ride veh fart
of 81.o,0 gM a„mop.N, lY Pus the[ eeps fm$d0.. Five -tide 4cMssadd wemase by 33%,
from $3.00 to $4.U0. molting w a penridemrtof3.80 wskMofNe amen[ $.60..
The projukd impact of Nes pmpbM ioccroses is a 4% loss in ridership Sold a 17%gnin
w fare box ravipra. Theva inaeese iv fart baxrevmumwprojeoted mfioml $et,407
Pw Year.
If 70%of Nu ivaeSse w ellocmM b the city of B®gw, amans in roughly MAW
Ebfdoral doBm to help offset Ne IvojnYM MkSM con of adding a third Capehm buts.
Thu papa18b5 into a net ivaee6e of $31300 w teguirod Smoel subsidies flan Ne city of
Bang” fw Ne extra Cspehm bus.
Fare box pmjecdm6 im$nde Ne following mon glion®
The number ofpmpk prying 6ivglo-ride cash fare will drop by 4.4%.
• The SAE Of
dnUemwBltlmp
• The 6aleofrof M3114tly MAEsol wBldrop bydona
The mmbw of �mvNty puss bold m andel fiervim agencies wBl rameiv
unrBmgM
BAT Cwvmoviry Commmr fares ware Mryned won bhher1A03. The swf,,, $3 cash
fere wcreesMfmm $.75 to 585, aM Ne oxt ofa mmNlypuswcreased Bum S30b
534. The mei fw a five-nde dcknremawM umXavgM u 53.00. At thc sem dere, fec
fw talledWwereeromeed,the Anon] wuve'6Maim CSMPernawu
extrndM b Al BATroum, and asbmM tidbi wus inhodusN [mutt on all ml in
part duel)theseendoNwicufly nk iv BATM3lendnervicee, ndemhipaM fare
WS rc«ipm inareuW simificmdy following th 71103 fm increasd