HomeMy WebLinkAbout2000-02-07 00-95 ORDERCOORCM ACTION
Date: 02/07/00 Item No.: 00-95
ItaNSubjece Authorizing Award of Bid for Telford Aviation Aircraft Repair Facility Expansion
Responsible DepsrtmenL Engineering
Commentary:
As the Council is aware, Telford Aviation has recently announced a substantial espousing of their
aimmG repair operation at Bangor International Airport. The expansion will require a 15,000
square foot addition to the existing building Telford currently leases firm the Airport.
On January 26, bids were received for the building addition. The started council order
authorizes bid award for the project to the Sheridan Corporation in the sooner of $540,592, which
is the lowest cost proposal. -
Also agached is a rebalance of bids and a memorandum Gum the City Engineer, which
summarizes bid comparisons and recommends award to Sheridan.
war
Manager's Commeva:
C vMarmsv
Associated Information:
Budge Approval:
Filmme0irecrw
Legal Approval:
ciysouede
�� Passage
First Reading
Referral
Page of
00-95
4HAp, d to Counmlw Palmer February 7, 20M
�p CITY OF BANGOR
(TM.) �CA:FYa _. Audmorizing Award of Bid for Telford Avieaon Aircraft _
Repair FaCBRy Expansion—BJA
Bp the Cay Cowim't ofmr ltity afBasgw.
ORDERED.
PBAS
the award of bid is hereby made to The Sberidan Corporation of Fairfield, Maine
for the Telford Aviation Aircraft Repair Facility a Bangor International Airport in
the amount of $540,572.00.
IN CITY MMCIL
February I, 2e00
Notion for Passage made and seconded 00-95
Passed - 0 R 0 E R
Title, authorizing Award of aid for
Telford Aviation Aircraft Repair
Facility Expansion - B.I.A.
......................................
.. .............. 4.......................
�fQ
.......� '.Ie nn/
vtr�.tl ... ...... ....
Councilman
00-95
ICIIMIIII3:L\2113851
Febmmy, 3, 2000
TO: David N. Pellegrino, Purchasing Agent
FR: fames D. Ring, City Engineer
SMECT: Telford Expansion Bids
On January 26, 2000 bids were received for me proposed building expansion for Me
Telford Aviation Aircraft Repair Facility m BU. The expansion will consist of a 15,000 square
foot pre-engineered metal building system addition, which will be primarily used fon warehouse
distortions. Bids were requested for designlbuild services to constroct the building addition,
including basic lightinigidedukal, belong, and ventilation systems. A sprinkler fire protection
system will also be installed in the new addition as well as the entire existing facility A unit
price for ledge removal was also requested, although none is anticipated.
Attached is a tabulation of the nine bids received for this project ranging from $510,000
m $742,005. Stored completion times run from 70 to 180 calendar days. Since bids were for
design/build services, I have reviewed each in demil to Insure that I) basic project requirements
wouldbemetand 2)thatbi&wwewmpmed onan equal basis. Although all bids are generally
responsive, there are some differences in Ne proposals.
I requested additional information, clarification add pricing on several items from each
of the three lowest bidders. The additional information has been received and reviewed. 1 have
edeched it W the origittal bids, which have been returned to your office.
Based on my review of the initial proposals and supplemental information, the following
summarizes an equal comparison of the Muse lowest bids:
I SHEMAN CORPORATION—Fairfield, Isle
Metal Building System: BUTLER
Bid Snbmimd:
Building Blue Bid— $405,000
Sprinkler Syuem — $105.000
Toul As Iod: %510,000
Addiftonel Required Items not included in Best Bid
Nterior Well Liner Rawl (26 Oa) +6 29,574
Electric Ovmhatl Baor Opemtm +S 998
Sheriden Tnml Price —454
nsn
Compleddn Time: 70 CaL Days
00.95
2. STIFFLER CONSTRUCTION. INC. - St. Agree Me
Moral Building Starts:
INLAND
Bid Submided
Building Base Bid-
54)6,]11
SprinklerSystem-
S677$Q
Total AS Bid:
$5",501
Additional Required Items not included in Base Bid:
sprinkler System Bonner Pump
+S 17,910
sBmer ToolPrim
=$562AII
Completion Time:
180 Csl. Days
5. DURAFORM STEBL BUILDINGS, MC. -Lowed, W.
Metal Building System:
A&S
Bid Selected:
Building Base Bid-
5482,511
Spemklasynao
S 86700
TOW As Bid
$5",211
Additional Required Mars net included m Base Bid:
NONE
Duraform Tomd Price
=5568111
Complesion Time'.
QOCal. Days
The only significant difference (other than cast and completion time) in these three
proposals relates W the roof support system. Stiffier Construction indicates Mat it proposal is to
continued a clear span building with no interior support columns, which is claimed to be
approximately $20,000 more expensive. Clear span configuration was nm a requirement. The
bid specifications clearly sure Mat interior columns ere permitted, provided that they are spaced
o closer Men 20 feet apart Both Sheridan and Dumfotm propose minimum header column
spacing of 33'-4",which exceeds the minimum bid requirements.
Based on my review of Me proposals received for this project, I recommend Chet Me
contract be awarded M Me Sheridan Corpomban m Me amount of $540,572. Sheridan is very
experienced in Min type of commuction wit ample resources W undertake the project. The
Butler Building system that they have proposed is an excellent one. In addition to submitting Me
lowest price. Sheridan also bas Me shortest completion time by a substantial margin and has
indicated Met they can complete Me work (except for paving) within this very short timeframe.
Given Me need to have the building expansion available as some as possible, this is an added
benefit of tsir proposal.
If you have any questions or need further inMrmadon,ple le[me know.
MR
P.C. City Manager
Airport Manager
00-95
CITYOFBANGOR
AWARD RECOMMENDA
BID ITEM(S): Telford Av aton Building Addition
DEPARTMENT: Eno'neenno/A'raort
BUDGET REFERENCE: -
Requisition No.: N/A Account Number: 8599-91008700
Budgeted Amount $ 509.500.00 Available Balance: $ 589.500.00
Total Amount of Award Recommended: $ 511210100
Vendors Recommended: The Sheridan Comoation
Number of Bids Sento 23 Number of Bids Received: 9
Data Advertised: January 11 2000 Bid Opening Date: January 26 2000
Part Experience with Vendor lonellent X Good _ Fak_Poor_No Mar Experience
If no experience, references checked or other method of veralor reliability established
OTHERCOMMENTS:
Award the contact to The Sheridan Corporation of Fairfield, Maim, the low bidder at $510,000.00. (See
attached memo from Jim Ring).
This award recommendation most be approved by the City Council as it Is in excess of $IN,000.00.
Purcbash A
rt#rt#rt#####rt###rtY#####rtY####ii#ii#kix»x»»»ikkkk»i#rtrtrt##k#rtrtrt##rt#rt#####YYY
APPROVALS
QTY COUNCR FINANCE COMMITTEE:
grarononvwiwweuiwx6umnax
e'ie Or J'i 26,1999
Th, di Condition,
ftfip, Conti 11
01 From Support i
drop Alloclum, Im
unit
Trip
Urn
Topor
Unk
Unit
Toral
par
DESCRIPTION
07Y
MIT
ITC,
Food
Pop,
AYS
191
a
5,11,11 ME
Cort,
UNIT
Fir,
Pon,
I "i III no Cori
proton, 'roninriwo
L7f
vuFPro,