Loading...
HomeMy WebLinkAbout2000-01-10 00-71 ORDERCOUNCIL ACTION Date: Jammu 10. 2000 them No.: 00-0I Item/Subject Utility Location Permit for Underground Electrical Service -56 V Trillium Trail Responsible Department Engineering Commemmy: This is a routine action granting a utility location permit for installing an underground electrical service within the Trillium Trail right-of-way. The Maine Public Utilities Commission requires approval by the amenities governing body for such installations. A copy of the utility location permit application is attached. pv(men(Heod Mavagets Commrnts:Pit �n.wixy-e 9 CiryM Associated Information&i-dyy Budget Approval: Face Dbactw Legal Approval: a. rw Introduced For: sgr-may Passage First Reading El�.n . Page of ao-n Aaelen,d to Council... xm,mnn Senuou 10,'2000 CITY OF BANGOR (TITLE,) (®rber, Utility Location Permit for Underground Eledrical Service 56V Trillium __.... Tsuil Byt6r My Cmwwxoff cityofaanaar: ORDERED, TMT a utility location permit is hereby granted to the Arthur and Beth Kotredes for the purpose of installing arta maintaining an underground elechiral service within the Trillium Trull right-of-way, provided that all work to be done in full accordance with the City of Bangor Sheet Opening Regulations and any additional requirements of the City Engineer. A wpy of the utility location pemtit application is attached. I9 = WOBCD. Jammre 10, 4000 Peeaed 0071 ORDER Title, OHli[ l catiw eeimit For Wergro and Electrical Service - 56e Trillim Trail ...................................... .................................... Awed m FxtubA41 NNNICIPAL uNDERGROONO PERMIT DATE.0 t.oy 9716L9 To Bangor Hydro-Electtic COMp:any: 00-)I Being the Orly appointed, appropriate municipal officials of the agn cipality Of _ by our signature shown below, we gave no objection to the instal d electtiC service cable extending from utility pale #6JD�yt uG.% said pole being located within the bounds of the T %C' I I U taaa/atreet in the town of Said electric cable is installed to provide electric service at 22g, voltsr is ownedby and is to provide service to HRRI CIPAL OFFICIALS: Dear Municipal Officials: Th bove referenced underground installation to GAv�aswas completed on 12-9d5 i9 . Signed, Manager/nnsistant Manager aa. 61d R435(li� Bangor Hydro -Electric company SOC4 .rDivision Form #9-756