HomeMy WebLinkAbout2011-06-27 11-212 ORDERDate: June 22 2011
Item/Subject: ORDER, Authorizing Bid Award in the Amount of $911,999 to Lane Construction
for the Hammond Street Resurfacing Improvemeres Project
Responsible Department Engineering
If approved, this order will award a bid to Lane Construction for $911,999 to resurface
Hammontl Street. This project Is a locally administered MOOT project that will Involve the
reclamation and repaving of Hammond Street from Its Intersection with Union Street to Norway
Road. The project will be funded 90% by the State and the City will provide the required 10%
match.
On June 15, 2011 the City received two (2) bids for the Hammond Street Resurfacing
Improvements Project. The prices were $911,999 and $982,998 (see attached bid tabulation).
On June 20, 2011, the Finance Committee approved staff recommendation for the award of the
contract to Lane Construction of Bangor in the amount of $911,999. The contract award
recommendation must be reviewed approved by the City Council as It is over $100,000.
Department Head
City Manager
Order, Bid
on:
Order, Bitl Tabulafion
Approval:
S��dce Director
Legal Approval:
City Solicitor
maopwR mr
X passage
_ RM It"ding page _ &_
R rsl
11 212
C�sone 27,2011
'e / Assigned to Councilor - pealley
CITY OF BANGOR
tTiTLE.) Order, Authorizing Bid Award in the Amount of $911,999 to Lane Construction for the
Hammond Street Resurfacing Improvements Project
BY the City CMM/of the city Of Bangor.
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
and purchase order to Lane Construction in the amount of $911,999 for the
Hammond Street Resurfacing Improvements Project.
IH eI202011
]we L 2011
P
an S
0g '
the �Ouutof $911.999 to L Construction for the
H nd Street Resurfacing l rwevents
Project
_ i
CRY V Saw
BM Tabulation: Hammond Street R wrfadng
BM Owing: 06/15/11
Lane Construction
Ban or Maine
F5. ln9usBias
Bangor, Maine
Ib
description
Qry.
Unit
Unit
Price
Total
Price
Unit
Price
Total
Price
1
202.2026emovl Pavement Surtace
28.303
W
3.00
89909.00
3.30
93399.90
2
202.203 PavemeM&M tons
390
SY
16.00
5490.00
12.00
9000.00
3
203.20 Cmrnon Fuaatlan
120
CV
78.00
9360.00
45.00
5900.00
4
309.08 ate Base Course -Gavel
96
a
80.50
3680.00
102.00
469100
- 5
903.20] 3/4' Perm Mot Mix halt
£5
TON
160.00
12,000.W
200.00
IS 000 W
6
403.20738" 9.Smm Hot Mix As alt
3,050
TON
82.00
250100.00
95.50
291275.00
7
903.20930" 9.5mm Hot Mix Asphalt tlrbx
270
TON
150.00
40500.00
135.0)
36450.50
8
403.20 Hot Mix Asphalt-38'HMA Leveling800
TON
90.00
72000.00
90.00
£2000.00
9
909.15 Smarinous Tack Coat ied
2,125
GAL
£.00
19075.00
6,75
19343.75
10
604.092 Catch Basin'T Bl{
12
EA
7300.00
87650.50
7000.0)
"Wood
11
604.164 Rebuild GtN Basin
2
EA
2500.00
5000.00
200000
9000.00
12
604.167
2
EA
1200.00
2,900.00
AL00
13
8AcluarnoABasin
609.18 Atl undo MH and CB Ig Gatle
28
145.00
21500.00
990.00
2322.W
12
14
JerUraln
608.26
100
LF
LF
95.00
4500.00
I?WN
6200.00
15
Du Wami Field SW Ram
120
SF
9600
5520.00
0.00
44.00
5200.00
16
609.11 Euro Re
W9.260etecle Cu
IF
94.00
64020.00
38.00
55290.00
17
609.28 bT Cornx
Curb
D-Gran-ete
5SW
SSW
IF
19.00
83552.00
1600
95488.00
10
619.38 Vamcl Cwt 1-G2n RMH
B6)
LF
23.00
19780.00
15.70
13502.00
19
Loam
615.07 Loam
261
CI(
56.00
19560.00
70.00
1825000
20
619.12 n Me1Mtl Na. 1
30
UNIT
43.00
129000
35.00
1)50.0)
21
Mulch
619.32 MUICM1
3)
UNIT
30.00
950.04
21.00
630.00
22
Wtrre or Pavement Martin
4 716
8F
0.35
165).61
0.35
1650.60
23
62717114"
nvYellow
Cm
62].75 White Or Yellow aro MaNJ
6539
SF
1.50
9898.50
1.50
9008.00
24
629.05 Hand Lothar
to
MH
36.00
360.00
W.00
600.00
25
631.12AIFPu se Excavator
Pul
Lo
MH
125.do
1250.0
170.50
25
631,1Rll
La a
10
MN
00.50
800.00
90.00
27
652.36 Maintenance of Traflk
1
LS
28593.90
28543.90
63£41.25
28
652.38 Fla er
1200
MH
1800
21600.00
1£.00
g1l
29
659.10 MOtllkon not to emeea 5%
1
LS
4500000
45000.00
49125.00
I
it Total Pra eG &tl:
911999.00
98