Loading...
HomeMy WebLinkAbout2011-06-27 11-212 ORDERDate: June 22 2011 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $911,999 to Lane Construction for the Hammond Street Resurfacing Improvemeres Project Responsible Department Engineering If approved, this order will award a bid to Lane Construction for $911,999 to resurface Hammontl Street. This project Is a locally administered MOOT project that will Involve the reclamation and repaving of Hammond Street from Its Intersection with Union Street to Norway Road. The project will be funded 90% by the State and the City will provide the required 10% match. On June 15, 2011 the City received two (2) bids for the Hammond Street Resurfacing Improvements Project. The prices were $911,999 and $982,998 (see attached bid tabulation). On June 20, 2011, the Finance Committee approved staff recommendation for the award of the contract to Lane Construction of Bangor in the amount of $911,999. The contract award recommendation must be reviewed approved by the City Council as It is over $100,000. Department Head City Manager Order, Bid on: Order, Bitl Tabulafion Approval: S��dce Director Legal Approval: City Solicitor maopwR mr X passage _ RM It"ding page _ &_ R rsl 11 212 C�sone 27,2011 'e / Assigned to Councilor - pealley CITY OF BANGOR tTiTLE.) Order, Authorizing Bid Award in the Amount of $911,999 to Lane Construction for the Hammond Street Resurfacing Improvements Project BY the City CMM/of the city Of Bangor. ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract and purchase order to Lane Construction in the amount of $911,999 for the Hammond Street Resurfacing Improvements Project. IH eI202011 ]we L 2011 P an S 0g ' the �Ouutof $911.999 to L Construction for the H nd Street Resurfacing l rwevents Project _ i CRY V Saw BM Tabulation: Hammond Street R wrfadng BM Owing: 06/15/11 Lane Construction Ban or Maine F5. ln9usBias Bangor, Maine Ib description Qry. Unit Unit Price Total Price Unit Price Total Price 1 202.2026emovl Pavement Surtace 28.303 W 3.00 89909.00 3.30 93399.90 2 202.203 PavemeM&M tons 390 SY 16.00 5490.00 12.00 9000.00 3 203.20 Cmrnon Fuaatlan 120 CV 78.00 9360.00 45.00 5900.00 4 309.08 ate Base Course -Gavel 96 a 80.50 3680.00 102.00 469100 - 5 903.20] 3/4' Perm Mot Mix halt £5 TON 160.00 12,000.W 200.00 IS 000 W 6 403.20738" 9.Smm Hot Mix As alt 3,050 TON 82.00 250100.00 95.50 291275.00 7 903.20930" 9.5mm Hot Mix Asphalt tlrbx 270 TON 150.00 40500.00 135.0) 36450.50 8 403.20 Hot Mix Asphalt-38'HMA Leveling800 TON 90.00 72000.00 90.00 £2000.00 9 909.15 Smarinous Tack Coat ied 2,125 GAL £.00 19075.00 6,75 19343.75 10 604.092 Catch Basin'T Bl{ 12 EA 7300.00 87650.50 7000.0) "Wood 11 604.164 Rebuild GtN Basin 2 EA 2500.00 5000.00 200000 9000.00 12 604.167 2 EA 1200.00 2,900.00 AL00 13 8AcluarnoABasin 609.18 Atl undo MH and CB Ig Gatle 28 145.00 21500.00 990.00 2322.W 12 14 JerUraln 608.26 100 LF LF 95.00 4500.00 I?WN 6200.00 15 Du Wami Field SW Ram 120 SF 9600 5520.00 0.00 44.00 5200.00 16 609.11 Euro Re W9.260etecle Cu IF 94.00 64020.00 38.00 55290.00 17 609.28 bT Cornx Curb D-Gran-ete 5SW SSW IF 19.00 83552.00 1600 95488.00 10 619.38 Vamcl Cwt 1-G2n RMH B6) LF 23.00 19780.00 15.70 13502.00 19 Loam 615.07 Loam 261 CI( 56.00 19560.00 70.00 1825000 20 619.12 n Me1Mtl Na. 1 30 UNIT 43.00 129000 35.00 1)50.0) 21 Mulch 619.32 MUICM1 3) UNIT 30.00 950.04 21.00 630.00 22 Wtrre or Pavement Martin 4 716 8F 0.35 165).61 0.35 1650.60 23 62717114" nvYellow Cm 62].75 White Or Yellow aro MaNJ 6539 SF 1.50 9898.50 1.50 9008.00 24 629.05 Hand Lothar to MH 36.00 360.00 W.00 600.00 25 631.12AIFPu se Excavator Pul Lo MH 125.do 1250.0 170.50 25 631,1Rll La a 10 MN 00.50 800.00 90.00 27 652.36 Maintenance of Traflk 1 LS 28593.90 28543.90 63£41.25 28 652.38 Fla er 1200 MH 1800 21600.00 1£.00 g1l 29 659.10 MOtllkon not to emeea 5% 1 LS 4500000 45000.00 49125.00 I it Total Pra eG &tl: 911999.00 98