Loading...
HomeMy WebLinkAbout2011-06-13 11-186 ORDERItem No. 11 18 6 Date: June 13 2011 Item/Subject: ORDER, Authorising Bid Award in the Amount of $124,186 to Gardner Construction for the Odlin Road -1395 Pedestrian Improvements Project Respornsible Deparb hill: Engineering Cammenfary: On May 15, 2011 Me City received two (2) bids for the Odlin Road -1395 Fedesidan Improvements Project. The prices were $124,186 and $137,541 (see attached bid tabulation). On lune 6, 2011, the Finance Committee approved staff recommendation for the award of the contract to Gartner Construction of Bangor in the amount of $124,186. This is an MDOT project that is locally administered. The project will be funded 80% by the State and the Gry will provide the reiuiret 20% match. The caMrad award recommendation must be reviewed approved by the Clry Council as it is over $100,000. artment Mead Manager's Comments: City Manager Associated lMormation: Order, Bid Tabulation BudgM Approval ance Director Legal Approval:/»4�y City Wicker X Passage _ First Reading Referral Page _ of 11 186 June 13, 2011 Assigned to Councilor Weston CITY OF BANGOR (TITLE.) Order, Authorizing Ed Award in the Amount of $124,186 to Gardner Construction for the Odlin Road -I395 Pedestrian Improvements Project 6y the City Count/ of the O'ty of Rin ya': ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract and purchase order to Gardner Construction in the amount of $124,186 for the Odin Road -1395 Pedestrian Improvements Project. IN = c00N Tuve 13. 2011 Passed ciw p� nano¢ �)6NIp xis Bid I d 1n the d t of 3126.186 to Gat or the Od tv Nvad I. 395 YedsstrL Ivpxoemvte R*jcct Oty M Bangor Bid TMffiWmbn -Win 1 d 95 P clesnlan Bid OMning: 05/18/11 Is 186 Gardiner Cantu n Bonvor, ME Maine Earth Hemom ME Hem Oewiptwn Qty. Unit Unit prim Total prim Unit Prim Total price 1 201.12 Tree Removal and TrImminq 1 IS 500.00 500.00 1,000.00 1000.00 2 202.203 pavement Bull Joints 160 SY 10.00 1600.00 tO.W 1600.00 3 203.20 CMnmmE abon 420 CY 16.00 680.00 35.00 19700.00 4 309.08 Adnnaoate Base Course - Gravel 425 C 30.00 12750.00 45.00 19125.00 5 403.2093&' 9.5mm HMP sMeaalls 150 TON 130.00 19500.00 150.00 22500.00 6 600.260ft Ne Waming FleM S mm W SF 40.00 2400.00 38.00 2280.00 7 609.11 Vert. Qrld TyW 1-Gtanne 390 tF 30.00 11700.00 35.00 13650.00 8 609.31 Nb 2 -Cone 910 tF 11.00 10010.00 9.00 819D,W 9 609.38 VM. NN Re Rests 04 LF 22.00 1898.00 20.00 1 .00 10 610.08 Kip Rad 5 u 100.00 500.00 70.00 350.00 11 615.07 Loam 80 GY 25.00 2,000.00 60.00 4.800.00 12 618.13 Saeclim MemOd No. l 12 UNIT 50.00 600.00 45.00 540.00 13 619.12 Multln 12 UNIT 20.00 240.00 1 15.00 180.00 14 626.11 Proms[ 3uncdm Bou 3 EA 400.00 1200.00 400.00 1200.00 15 626.223"Conduit 330 00 40.00 13200.0 5.00 1650.00 16 626.34 p0]WNran Sinal P eFoundagan 2 EP 700.00 14W.00 70D.00 1400.00 17627.407 Mite or Yellow M. Nib larMng 608 SF 11.00 6688.00 2.00 1216.00 18 629.05 Hath labor SO MH 25.00 250.00 35.00 350.00 19 606.55 GuaMmil Remova Resel 60 IF 40.00 2400.00 25.00 1500.00 20 645.00 Relieve o Reset San 3 EA 150.00 450.00 300.00 900.00 21 643.80P1 Sgnals at Wll 13951Merse<tlou 1 LS 9500.00 9500.00 21000.00 21000.00 22 645.25 Roadside Sign 31 SF 30.00 930.00 30.00 930.00 23 645.28 Slon Po 3 EA 150.00 450.00 100.00 300.00 24 652.36 Maintenance 0 Trxffp 1 B 6000.00 6000.00 50W.00 5000.OD 25 652.38 Haqw 250 MH 23.00 57W.00 18.00 4500.00 26 659.10 Mabilimo9n NM W Exeecl S% 1 B 5 00.00 5600.00 7 000.00 7000.00 Total P BW: i 1ml1 oo 13) 541.00