HomeMy WebLinkAbout2011-06-13 11-186 ORDERItem No. 11 18 6
Date: June 13 2011
Item/Subject: ORDER, Authorising Bid Award in the Amount of $124,186 to Gardner
Construction for the Odlin Road -1395 Pedestrian Improvements Project
Respornsible Deparb hill: Engineering
Cammenfary:
On May 15, 2011 Me City received two (2) bids for the Odlin Road -1395 Fedesidan
Improvements Project. The prices were $124,186 and $137,541 (see attached bid tabulation).
On lune 6, 2011, the Finance Committee approved staff recommendation for the award of the
contract to Gartner Construction of Bangor in the amount of $124,186.
This is an MDOT project that is locally administered. The project will be funded 80% by the
State and the Gry will provide the reiuiret 20% match.
The caMrad award recommendation must be reviewed approved by the Clry Council as it is over
$100,000.
artment Mead
Manager's Comments:
City Manager
Associated lMormation: Order, Bid Tabulation
BudgM Approval
ance Director
Legal Approval:/»4�y
City Wicker
X Passage
_ First Reading
Referral
Page _ of
11 186
June 13, 2011
Assigned to Councilor Weston
CITY OF BANGOR
(TITLE.) Order, Authorizing Ed Award in the Amount of $124,186 to Gardner Construction for
the Odlin Road -I395 Pedestrian Improvements Project
6y the City Count/ of the O'ty of Rin ya':
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
and purchase order to Gardner Construction in the amount of $124,186 for the
Odin Road -1395 Pedestrian Improvements Project.
IN = c00N
Tuve 13. 2011
Passed
ciw
p�
nano¢
�)6NIp xis Bid I d 1n the d t of
3126.186 to Gat or the Od tv
Nvad I. 395 YedsstrL Ivpxoemvte R*jcct
Oty M Bangor
Bid TMffiWmbn -Win 1 d 95 P clesnlan
Bid OMning: 05/18/11
Is 186
Gardiner Cantu n
Bonvor, ME
Maine Earth
Hemom ME
Hem
Oewiptwn
Qty.
Unit
Unit
prim
Total
prim
Unit
Prim
Total
price
1
201.12 Tree Removal and TrImminq
1
IS
500.00
500.00
1,000.00
1000.00
2
202.203 pavement Bull Joints
160
SY
10.00
1600.00
tO.W
1600.00
3
203.20 CMnmmE abon
420
CY
16.00
680.00
35.00
19700.00
4
309.08 Adnnaoate Base Course - Gravel
425
C
30.00
12750.00
45.00
19125.00
5
403.2093&' 9.5mm HMP sMeaalls
150
TON
130.00
19500.00
150.00
22500.00
6
600.260ft Ne Waming FleM S mm
W
SF
40.00
2400.00
38.00
2280.00
7
609.11 Vert. Qrld TyW 1-Gtanne
390
tF
30.00
11700.00
35.00
13650.00
8
609.31 Nb 2 -Cone
910
tF
11.00
10010.00
9.00
819D,W
9
609.38 VM. NN Re Rests
04
LF
22.00
1898.00
20.00
1 .00
10
610.08 Kip Rad
5
u
100.00
500.00
70.00
350.00
11
615.07 Loam
80
GY
25.00
2,000.00
60.00
4.800.00
12
618.13 Saeclim MemOd No. l
12
UNIT
50.00
600.00
45.00
540.00
13
619.12 Multln
12 UNIT
20.00
240.00 1
15.00
180.00
14
626.11 Proms[ 3uncdm Bou
3
EA
400.00
1200.00
400.00
1200.00
15
626.223"Conduit
330
00
40.00
13200.0
5.00
1650.00
16
626.34 p0]WNran Sinal P eFoundagan
2
EP
700.00
14W.00
70D.00
1400.00
17627.407
Mite or Yellow M. Nib larMng
608
SF
11.00
6688.00
2.00
1216.00
18
629.05 Hath labor
SO
MH
25.00
250.00
35.00
350.00
19
606.55 GuaMmil Remova Resel
60
IF
40.00
2400.00
25.00
1500.00
20
645.00 Relieve o Reset San
3
EA
150.00
450.00
300.00
900.00
21
643.80P1 Sgnals at Wll 13951Merse<tlou
1
LS
9500.00
9500.00
21000.00
21000.00
22
645.25 Roadside Sign
31
SF
30.00
930.00
30.00
930.00
23
645.28 Slon Po
3
EA
150.00
450.00
100.00
300.00
24
652.36 Maintenance 0 Trxffp
1
B
6000.00
6000.00
50W.00
5000.OD
25
652.38 Haqw
250
MH
23.00
57W.00
18.00
4500.00
26
659.10 Mabilimo9n NM W Exeecl S%
1
B
5 00.00
5600.00
7 000.00
7000.00
Total P BW:
i
1ml1 oo
13) 541.00