Loading...
HomeMy WebLinkAbout2011-06-13 11-183 ORDERRem No. 'I .I 183 Date: June 13, 2011 Item/Subject: ORDER, Authorizing ad Award In the Amoumd $390,610 m Lou Slver, Inc. for Me Gate 2A Trench Drain Replacement Project Responsible Department: Airport Commentary: On April 20, 2011 the City received three (3) bids for the Gate 2A Trench Drain Replacement Pri The prices ranged from $390,610 - $411,987 (see attached bid tabulation). Funding for this project Is as follows: 95% Federal, 2.5% State and 2.5% local. Jacobs, the Airports engineering consultaniiand City staff have reviewed the bids received and recommend the contract be awarded to Lou Silver Inc. On June 6, 2011, the Finance Committee approved staff recommendation for the award of the contract to Lou Silver Inc. of Veazle in the amount of $390,610. The contract award recommendation must be reviewed approved by the Our Council as It is over $100,000. Associated Information: Order, ad Tabulation Budget Approval: mance Director Gty Solicitor Introduced for ]3_ Passage _ First Reading page _ of _ Referral Assigned to Wuncilox Palmer. June 13. 2011 x CITY OF BANGOR (TITLE.) Order, Authorizing Bid Award in the Amount of $390,610 to Lou Silver Inc. for the Gate 2A Trench Drain Replacement Project By the City Council of Me oty ofBangor: ORDERED, THAT, Deborah Ovr, finance Director is hereby authorized to execute a contract and purchase order to Lou Silver Inc. in the amount of $390,610 for the Gate 2A Trench Drain Replacement Project. IB cm COB m II Ju 13. 2011 Passed 11-193 y ��— i u (Js onm �thotiti Bid B9atd!in the Bmosst. of $390.610 to Im Silvev. Ive., Fov the Gate 2A Re ucemevt Project ,wro��m mlmww. �n�MPni (w.:i 1 '83 CtYM8amor Be Tabulai Gate 2NTs i Drain Replacement BN'n : 092011 I Lou ANar Inc Van W. ME Saepmttoryorsmtl Manahan, MF Item DmiOtion Qry, unit Unk Penn Total PAM Unk Prior Topa) Pace MCOI-1 Mokllsstlon 1 L$ 1 15000.00 15000.00 18.600.0) 18600.00 MOOI-2 A Ik Kara I F 31 3000.00 3000.00 3000.W M002-1 MWminme ConaHe Sawed C Jed 1100 LF 4.50 5220.00 3.00 4408.W M002-2 FCC Pavanat Saw OXnM Jold 100 LF 12.50 2000.00 l0.]II 1712.00 IFIU1 UndaaifiM BxdaUan 1050 CY 16.5D 17325.00 22.00 23100.00 P152-2 Bari Cerent CnnaINe ParaneM RemovaI CmNow Low SM Malercl BY 5&00 13920.00 3300 ]920.00 P352-3 tench Drain Rernrial LF 85.00 19 .W 2600 5 29.00 iii CanpleR Removal 18000.0) LF 35.00 Y.CO 46.00 736.30 P1534 Canrolkel Low Strm M Messnal Eituminom PPorert Ba¢Cnurse a 108.0 1.080.0) 99.00 990,00 P159-1 SWtase Course U 31.W 23095.00 28.03 20000.00 P209-1 D,inhetl Batt Course 19[0.00 n 56.W 11230,00 72M 19900.00 PoOI-1 Stump CmwNe Porement 5uaaceTON 18: ReiMortttl Oar d K 135 1]4.00 23990.00 210.00 28350.W Po03-1 Bitumirous Uncrrete Parisi Base CourseTON LF 320.00 145.00 43 .W 161.00 48300.00 P501 -I Patlare Cement CorureR Pavement Sn4000 BY 125.00 500.00 116.W 3010.00 FW3-] Bbumlmus Tank Cost Under Drain Cleanout GAL 12.W 120000 14.50 340.00 P631-1 Refines Cod Tar Emulsion w MPPowSY EA 2500.00 ].00 4690.00 6.00 9020.00 DMIA 18: Reinf HCrn B 88000.00 LF 102.00 13,M.00 96.00 12960,00 DMI -2 14'DurdklmnR _ Total Project li LF 245.00 299000 2R.W 3269.00 DI01-3 14' Flap Varve EA 36W.W ]20000 5100.00 10,201 D705-1 WMr Diln (F An.) LF 69.W V2W.00 32.00 8640.00 DTI5-2 Wrier Dain Oeamut FA 1500.00 5500,00 W.W 2500.00 D]51 -t TtlarnsiM Mle FA 21000.00 9 CW.00 16000.00 32000.00 io/ A Tren[b Drain LF 900.00 8910000 496.00 1091ID.00 Trial Pnosect BM: I I I 300610.00 391960.00 IanMMtu�m IWr al mancepumn Qqk . Un Una Pa® PnPai MOK)I-I MOCl 1P�120M .W 31000.00 MWI-2 Mn As-&iMt%ons 1 3000.00 BLumlmus Con acre 1MmI NtiM L1W2.00 .W 9690.30 NM002-1OW2 M]52 -I 0.YPsremm[Saxetl GMralJdn[ Oolwal SW12.00 1920.00 P152-1 UndaBafi� E ve0m I 33 NO P152-2 PoMaM Cement Corcreh PavembR Renxrrtl DO32.00 290 BY69.00 3600 15360.00 60% P152-3 Trench Dein Rarwal 224MON 6,720,00 P152-4 COMRM pi Remora 16122.00 203200 PlS l CmNow Low SM Malercl 30119.00 1140.00 P1541 'wdrese Douse 29530.00 22350.00 P209-1 Cludetl Batt Course 20090.00 18000.0) Po01-I BNmimme Come@ Pmanent Surface 135 190.00 256`0.00 Po 1 Eituminom PPorert Ba¢Cnurse 300 145.00 43,500.0) P301 -t Portant GmeM Cm to Povenmt 200120.00 31 .00 100 14.00 19[0.00 F631-1 R>fimtl Coal Tar bnulsknw PDdtivtS 670 SY 5.00 3350.00 D201-1 18: ReiMortttl Oar d K 135 LF 66.00 8910.00 D201-2 14'DeGk Iron% 12 LF 320.00 9990.00 DMI -3 14' Rap Valve 2 EA 2520.00 Sn4000 D205-1 Under Dien B' can.) 2]0 tF 3].00 900000 D205-2 Under Drain Cleanout 1 FA 245.00 795.00 0051-1 TUiamder Mani 2 EA 2500.00 5000,00 D751h1 TraWi Drain 220 lF 4W.W 88000.00 _ Total Project li 411,9111