HomeMy WebLinkAbout2011-06-13 11-183 ORDERRem No. 'I .I 183
Date: June 13, 2011
Item/Subject: ORDER, Authorizing ad Award In the Amoumd $390,610 m Lou Slver, Inc. for
Me Gate 2A Trench Drain Replacement Project
Responsible Department: Airport
Commentary:
On April 20, 2011 the City received three (3) bids for the Gate 2A Trench Drain Replacement
Pri The prices ranged from $390,610 - $411,987 (see attached bid tabulation). Funding for
this project Is as follows: 95% Federal, 2.5% State and 2.5% local.
Jacobs, the Airports engineering consultaniiand City staff have reviewed the bids received and
recommend the contract be awarded to Lou Silver Inc.
On June 6, 2011, the Finance Committee approved staff recommendation for the award of the
contract to Lou Silver Inc. of Veazle in the amount of $390,610.
The contract award recommendation must be reviewed approved by the Our Council as It is over
$100,000.
Associated Information: Order, ad Tabulation
Budget Approval:
mance Director
Gty Solicitor
Introduced for
]3_ Passage
_ First Reading page _ of _
Referral
Assigned to Wuncilox Palmer.
June 13. 2011
x CITY OF BANGOR
(TITLE.) Order, Authorizing Bid Award in the Amount of $390,610 to Lou Silver Inc. for the
Gate 2A Trench Drain Replacement Project
By the City Council of Me oty ofBangor:
ORDERED,
THAT, Deborah Ovr, finance Director is hereby authorized to execute a contract
and purchase order to Lou Silver Inc. in the amount of $390,610 for the Gate 2A
Trench Drain Replacement Project.
IB cm COB m II
Ju 13. 2011
Passed
11-193
y ��— i
u (Js onm
�thotiti Bid B9atd!in the Bmosst. of
$390.610 to Im Silvev. Ive., Fov the Gate 2A
Re ucemevt Project
,wro��m mlmww. �n�MPni (w.:i
1 '83
CtYM8amor
Be Tabulai Gate 2NTs i Drain Replacement
BN'n : 092011
I
Lou ANar Inc
Van W. ME
Saepmttoryorsmtl
Manahan, MF
Item
DmiOtion
Qry,
unit
Unk
Penn
Total
PAM
Unk
Prior
Topa)
Pace
MCOI-1
Mokllsstlon
1
L$ 1
15000.00
15000.00
18.600.0)
18600.00
MOOI-2
A Ik Kara
I
F
31
3000.00
3000.00
3000.W
M002-1
MWminme ConaHe Sawed C Jed
1100
LF
4.50
5220.00
3.00
4408.W
M002-2
FCC Pavanat Saw OXnM Jold
100
LF
12.50
2000.00
l0.]II
1712.00
IFIU1
UndaaifiM BxdaUan
1050
CY
16.5D
17325.00
22.00
23100.00
P152-2
Bari Cerent CnnaINe ParaneM RemovaI
CmNow Low SM Malercl
BY
5&00
13920.00
3300
]920.00
P352-3
tench Drain Rernrial
LF
85.00
19 .W
2600
5 29.00
iii
CanpleR Removal
18000.0)
LF
35.00
Y.CO
46.00
736.30
P1534
Canrolkel Low Strm M Messnal
Eituminom PPorert Ba¢Cnurse
a
108.0
1.080.0)
99.00
990,00
P159-1
SWtase Course
U
31.W
23095.00
28.03
20000.00
P209-1
D,inhetl Batt Course
19[0.00
n
56.W
11230,00
72M
19900.00
PoOI-1
Stump CmwNe Porement 5uaaceTON
18: ReiMortttl Oar d K
135
1]4.00
23990.00
210.00
28350.W
Po03-1
Bitumirous Uncrrete Parisi Base CourseTON
LF
320.00
145.00
43 .W
161.00
48300.00
P501 -I
Patlare Cement CorureR Pavement
Sn4000
BY
125.00
500.00
116.W
3010.00
FW3-]
Bbumlmus Tank Cost
Under Drain Cleanout
GAL
12.W
120000
14.50
340.00
P631-1
Refines Cod Tar Emulsion w MPPowSY
EA
2500.00
].00
4690.00
6.00
9020.00
DMIA
18: Reinf HCrn B
88000.00
LF
102.00
13,M.00
96.00
12960,00
DMI -2
14'DurdklmnR
_ Total Project li
LF
245.00
299000
2R.W
3269.00
DI01-3
14' Flap Varve
EA
36W.W
]20000
5100.00
10,201
D705-1
WMr Diln (F An.)
LF
69.W
V2W.00
32.00
8640.00
DTI5-2
Wrier Dain Oeamut
FA
1500.00
5500,00
W.W
2500.00
D]51 -t
TtlarnsiM Mle
FA
21000.00
9 CW.00
16000.00
32000.00
io/ A
Tren[b Drain
LF
900.00
8910000
496.00
1091ID.00
Trial Pnosect BM:
I
I I
300610.00
391960.00
IanMMtu�m
IWr al
mancepumn Qqk . Un
Una Pa®
PnPai
MOK)I-I
MOCl
1P�120M
.W
31000.00
MWI-2
Mn
As-&iMt%ons
1
3000.00
BLumlmus Con acre 1MmI NtiM
L1W2.00
.W
9690.30
NM002-1OW2
M]52 -I
0.YPsremm[Saxetl GMralJdn[
Oolwal
SW12.00
1920.00
P152-1
UndaBafi� E ve0m
I
33 NO
P152-2
PoMaM Cement Corcreh PavembR Renxrrtl
DO32.00
290
BY69.00
3600
15360.00
60%
P152-3
Trench Dein Rarwal
224MON
6,720,00
P152-4
COMRM pi Remora
16122.00
203200
PlS l
CmNow Low SM Malercl
30119.00
1140.00
P1541
'wdrese Douse
29530.00
22350.00
P209-1
Cludetl Batt Course
20090.00
18000.0)
Po01-I
BNmimme Come@ Pmanent Surface
135
190.00
256`0.00
Po 1
Eituminom PPorert Ba¢Cnurse
300
145.00
43,500.0)
P301 -t
Portant GmeM Cm to Povenmt
200120.00
31 .00
100
14.00
19[0.00
F631-1
R>fimtl Coal Tar bnulsknw PDdtivtS
670
SY
5.00
3350.00
D201-1
18: ReiMortttl Oar d K
135
LF
66.00
8910.00
D201-2
14'DeGk Iron%
12
LF
320.00
9990.00
DMI -3
14' Rap Valve
2
EA
2520.00
Sn4000
D205-1
Under Dien B' can.)
2]0
tF
3].00
900000
D205-2
Under Drain Cleanout
1
FA
245.00
795.00
0051-1
TUiamder Mani
2
EA
2500.00
5000,00
D751h1
TraWi Drain
220
lF
4W.W
88000.00
_ Total Project li
411,9111