HomeMy WebLinkAbout2011-05-09 11-145 ORDERItemNo, 'I" 445
Date' May 9. 2011
Item/Subject: ORDER, Authorizing Execu0on of an Easement to Mme Warner Cable -
Omer of Park Street and Harlow Street
Responsible Department: Engineering
Commentary:
Mme Warner Cable is requesting an easement for underground ounduit to be Installed on CIty
prapeny to provide cable/ internet service through the triangular park at the romer of Park
Street and Harlow Street.
This Order will authorize execution of the easement
Arthur B. Moraan
Interim Department Head
Managers Comments:
This has been Wiewed and recommendetl for approval by the
Infrastructure Committee on
May 3, 2011.
City Mancger
Associated Information:
Map, Council Order, Council Action
Rnance DirMor
Introduced for
X Passage
_ First Reading Page _ of _
Referral
;2011
Assigned to Councilor Yeetov My 9, 2011
r CITY OF BANGOR
* ".
(TITLE.) ORDER, Audwnzing Execution of an Easement to Time Warner Cable —
Corner of Park Street and Harlow street
WHEREAS, Time Warner Cable wishes to install underground conduit for cable
and internet service through the triangular mark looted at Park Street and Harlow
Street; and
WHEREAS, the conduit will be installed across lard owned by the City of Bangor,
thereby, requiring an easement.
Now, Therefoir Be R Ordered By the City CWm:11 of the City ofBarrgor That
The City Manager Is hereby allthodZed on behalf of the City of Bangor, to execute an
easement to Time Warner Cable to provide a service line across City property located in
the triangular park located at Park Street and Harlow street, said easement to be in a
final form as approved by the City Solicitor or Assistant City solicitor.
n cin c cm
1 y 9. 2011
FssS"
4-m
LOCATION EASEMENT PERMIT REQUEST
FOR THE
INSTALLATION OF CABLE TELECOMMUNICATIONS DISTRIBUTION
SYSTEMS WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OFTHE
CITY OF BANGOR
As an integral part of the development of the cable telecommunication distrbution
system for the City of Bangor, Time Warner Cable proposes to install cable
telecommunications system infrastructure conduits within the mad and street right-of-
ways according to the table included below. The conduit material will be PVC Schedule
80 and HDPE, high-censity polyethylene cable conduit. The PVC conduit moor will be
gray, the HDPE color will be orange and will be installed by trench -less and/or
conventional open -cut trenching methods as best suit each location. All of the cable
telecommunication infrastructure conduits will be installed to a depth specified by the
City of Bangor. Refer to the attached plan for details of the proposed construction.
PROPOSED LOCATION SUMMARYTABLE
Location
Prom
To
DraI Sheer
Lunar
Po
City [iaLL Sde
of Park Sr
3'o(fCurb
Edge
Down Peckro
iG
ry BellC
BG4
37&Asphiln
[meat
€4S
PAN
C
LEASE EXHIBIT
9�
�,. ri 4444
yaPi
0
D
LEASE EXHIBIT L�2