HomeMy WebLinkAbout2011-04-11 11-118 ORDINANCEItem N% 1.1, 1 .1 8
Date: AonI11.I011
item/Subject: ORDINANCE, Amending the Street Code, Chapter 271, Article VII, Street
Openings and Utility Connections 4 271-32, Schedule of Charges
Responsible Department: Engineering
Under the existing Ordinance, Chapter 271, Article VII, ntlllty contractors such as those watdng for
Bangor Gas and the Wall District are required to pay the City an annual fee of $500 for street
opening permits. At the same time, contractors doing work far private residences are required to
pay $60 per permit. In an effort to bring falmess and Consistency to sheet openings and utility
connections, the City Is proposing that Chapter 271, Article VII 4271-32 be amended to eliminate
the ability of utilities to obtain a single permit for streetopenings and utility connections and require
individual permits for each street opening and utility connection. The proposed cost is $50 per
permit and would include review and inspection of each individual connection. Undertheproposal,
all contractors would Continue to be required to provide dig safe permit number before issuance of
permits, proof of insurance, finished pavement repair will be done by the contractor, and provisions
for denying permits to contractor's demonstrating unsatisfactory performance. The proposed
ordinance amendment would only apply to utility connections that are performed on existing roads
that have been accepted by the Oty and not required where the mad has yet to be accepted. The
Infrastructure Committee (IC) unanimously recommended to the full Council.
Arthur IsMmoan
Interim Department Head
Manager's Comments:
�
City t m- CAA 4e
Manager
Associated Irrformation: Ordinance, Revised Chapter 4271-32
Finance Director
rtroduced for
_ passage
-X First Reading page
— Referral
11 _t8
AssiguM to Councilor Dursio April Il, 2011
CITY OF BANGOR
21
(TITLE.) Ordinance, Amending the Street Code, Chapter 271, Article V11, Street
Openings and Utility Connections § 271-32
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BANGOR
THAT, the Street Code, Chapter 271, Article VII, § 271-32, be amended as follows:
By deleting § 271-32 in Its entirety end replaced with §271-32.
§ 271-32. Street openings; schedule of charges.
A. Openings by utility companies
(1) Utility companies will be required to obtain separate permits for each
street opening within accepted public riaht-of-ways. The utility company
shall be responsible for performing all backfill operations, including the
replacement of roadway gravel, temporary patching of the surface, and
the permanent surface pavement. jaloryearnpaRrels WmA Pay ananAtel
B. [Unchanged]
C. Schedule of charges for street openings and utility connections.
(1) The amount to be paid for a street opening/utility connection permit will
be based upon the following Inspection fee schedule:
Standard poll Fee $-6Bd16
Standard Permit Fee $ 50 00
Weekend Work Permit Fee $210.00
"After the Fact" Permit Fee $420.00
Additional Inspection Costs Actual Labor Expase pis established
City Overhead Rates
(2) The City
Engineer
may
waive Work" and "ARer the
cennit
fee for
ublibes
that open streets in f ernernencies without
fret obtaining
a oenn't
Note: additions are underlined; deletions are struck through.
IB.CIYY
.
. 2011L
11. 2X31
nrac evafae
nrst
CPiTLS.I ._ Code'
C61p
CISR Q.@H -
u
]tt Artf a Y11. street openlngs
andloeflity
1M MY CUGHCII
Gonaectioes 271-32
April 25. 2011
Motion We and seconded
for Passage
voce 8-0
Coumelars Votlag Yes:
Blanchette. RroeBm. Oargia
AW®fW'1e COORBq
Hewes. l.oaga. Heaney. Palmer d
Bestoo , I
Comacilus Voting Mo: Mone
C ilors Absent: CraMek
P*sseed