Item No. 12-24
Date: 7uly 23, 2012
Item/Subject: ORDER, Authorizing Bid Award in the Amount of $327,719 to Gardner
Construction Enterprises for the Outer Hammond Street Resurfacing
Project
Responsible Department: Engineering
Commentary:
On July 3, 2012, the City received five (5) bids for the Outer Hammond Street Resurfacing Project.
The bid prices ranged from 327,719 to 389,889.50 (see attached bid tabulation).
On July 16, 2012, the Finance Committee approved staff recommendation to award the contract to
Gardner Construction Enterprises in the amount of $327,719.
The project will be funded 90% by the State and the City will provide the required 10% match.
The contract award recommendation must be reviewed approved by the City Council as it is over
$100,000.
Manager's Comments:
Associated Information:
Bid Tabulation
Budget Approval:
Legal Approval:
Introduced for
X Passage -Consent
First Reading
Referral
Department Head
City Manager
Finance Director
ity Solicitor
Page _ of _
Assigned to Councilor Baldacci
CITY OF BANGOR
12-243
JULY 23, 2012
(TITLE.) Order, Authorizing Bid Award in the Amount of $327,719 to Gardner
Construction Enterprises for the Outer Hammond Street Resurfacing
Project
By the City Council of the City of Bangor.•
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
with Gardner Construction Enterprises in the amount of $327,714 for the Outer
Hammond Street Resurfacing Project.
IN CITY COUNCIL
July 23, 2012
se
td
ac./
CI CLERK
aollounoo of peuBjssd
(`3-1lIJ0
City of Bangor
Bid Tabulation - Hammond Street Resurfacing
Bid Opening: 07/03/2012
Item Description
1 202.202 Removing Pavement Surface
2 202.203 Pavement Butt Joints
3 203.20 Common Excavation
4 203.210 Rock Excavation
5 203.240 Common Borrow
6 203.xx Flowable Fill
7 211.30 Ditch Excavation
8 304.10 Aggregate Base Course - Gravel
9 403.207 3/4" 19mm Hot Mix Asphalt
10 403.210 3/8" 9.5mm Hot Mix Asphalt
11 403.209 3/8" 9.5mm HMA Sidewalks etc.
12 409.15 Bituminous Tack Coat Applied
13 603.00 4" Storm Drain
14 603.159 12" Storm Drain
15 603.179 18" Storm Drain
16 604.092 4' Diameter Catch Basin
17 604.15 4' Diameter Drain Manhole
18 605.11 12" Type C Underdrain
19 605.12 15" TvDe C Underdrain
20 609.31 Curb Type 2 - Concrete
21 610.09 Rip Ra
22 615.07 Loam
23 618.13 Seedina Method No. 1
24 619.12 Mulch
25 627.7114" White or Yellow Pavement Line
26 629.05 Hand Labor
27 631.12 All Pur se Excavator
28 631.172 Truck - Large
29 645.00 Remove & Reset Sion
30 652.36 Maintenance of Traffic
31 652.38 Flagger
32 659.10 Mobilization (not to exceed 3%)
4
Hampden, Me
Unit
Price
Total
Price
Gardner Enterprises
Bangor, Me
Qty.
Unit
Unit
Price
Total
Price
0,170
Sy
3.00
30 510.00
180
SY
16.00
2,880.00
268
CY
14.00
3,752.00
10
CY
235.00
2,350.00
50
CY
9.00
450.00
24
CY
70.00
1680.00
530
LF
6.00
3180.00
468
CY
20.00
9,360.00
220
TON
82.00
18 040.00
1,200
TON
84.00
100 800.00
95
TON
158.00
15 010.00
500
GAL
8.00
4,000.00
40
LF
34.00
1360.00
108
LF
36.50
3 942.00
64
LF
47.00
3,008.00
45
VF
390.00
17 550.00
5
VF
600.00
3000.00
412
LF
44.00
18128.00
698
LF
48.00
j3,504.00
1,470
LF
9.00
13 230.00
4
CY
100.00
400.00
180
CY
26.00
41680 00
28 UNIT
21.00
588.00
28 UNIT
20.00
560.00
5,588
LF
0.25
1,647.00
10
MH
26.00
260.00
10
MH
100.00
1,000.00
10
MH
60.00
600.00
31
EA
150.00
450.00
11
LS 1
9.000.00
1 9.000.00
4
Hampden, Me
Unit
Price
Total
Price
2.25
22 882.50
15.00
2,700.00
17.00
4,556.00
150.00
1,500.0
12.00
600.00
86.00
2,064.00
8.00
4,240.0
24.00
11 232.00
88.00
19,360.00
90.00
_
108 000.00
170.00
16 150.00
7.00
3,500.00
40.00
1600.00
40.00
4,320.00
60.00
3,840.00
350.00
15 750.00
425.00
2125.00
50.00
20 600.00
50.00
34 900.00
10.00
14 700.00
75.00
300.00
30.00
5,400.00
33.00
924.00
22.00
616.00
0.26
1,712.88
25.00
250.00
105.00
1,050.00
66.00
660.00
50.00
150.00
7,500.00
7,500.00
15.00
11,250.00
12-243
July 23, 2012
Lane Construction
Bangor Me
Unit
Price
Total
Price
2.70
27 459.00
32.00
5,760.00
13.50
3,618.00
80.00
800.00
7.00
350.00
100.00
2,400.00
3.33
1,764.90
35.00
16 380.00
114.00
25 080.00
92.00
110 400.00
176.00
16 720.00
11.00
5,500.00
32.00
1,280.00
43.00
4,644.00
59.00
3,776.00
519.00
23 355.00
494.00
2,470.00
26.00
10 712.00
37.00
25 826.00
11.00
16 170.00
70.00
280.00
28.00
5,040.00
22.00
616.00
22.00
616.00
0.20
1,317.60
32.00
320.00
125.00
11250.00
76.00
760.00
120.00
360.00
3,500.00
3,500.00
16.00
12 000.00
8,200.00
8,200.00
338.724.50
12-243
July 23, 2012
Lou Silver, Inc.
Veazie, Me
Pike Industries
Fairfield, Me
Item
Description
Qty.
Unit
Unit
Price
Total
Price
Unit
Price
Total
Price
1
202.202 Removing Pavement Surface
10,170
SY
3.00
30 510.00
2.15
21 865.50
2
202.203 Pavement Butt Joints
180
SY
15.00
2,700.00
15.00
2,700.00
3
203.20 Common Excavation
268
CY
20.00
5,360.00
14.75
3,953.00
4
203.210 Rock Excavation
10
CY
200.00
2,000.00
260.00
2,600.00
5
203.240 Common Borrow
50
CY
15.00
750.00
9.00
450.00
6
203.xx Flowable Fill
24
CY
100.00
2,400.00
74.00
1,776.00
7
211.30 Ditch Excavation
5301
LF
7.00
3,710.00
6.25
3,312.50
8
304.10 Agaregate Base Course - Gravel
468
CY
27.00
12 636.00
22.00
10 296.00
9
403.207 3/4" 19mm Hot Mix Asphalt
220
TON
80.00
17 600.00
80.00
17 600.00
10
403.210 3/8" 9.5mm Hot Mix Asphalt
1,200
TON
82.00
98 400.00
82.00
98 400.00
11
403.209 3/8" 9.5mm HMA Sidewalks etc.
95
TON
155.00
14 725.00
155.00
14 725.00
12
409.15 Bituminous Tack Coat Applied
500
GAL
7.00
3,500.00
7.00
3,500.00
13
603.00 4" Storm Drain
40
LF
50.00
2,000.00
36.40
1456.00
14
603.159 12" Storm Drain
108
LF
65.00
7,020.00
39.75
4,293.00
15
603.179 18" Storm Drain
64
LF
80.00
5,120.00
50.00
3,200.00
16
604.092 4' Diameter Catch Basin
45
VF
325.00
14 625.00
400.00
18 000.00
17
604.15 4' Diameter Drain Manhole
5
VF
500.00
2500.00
600.00
3,000.00
18
605.11 12" Type C Underdrain
412
LF
43.00
17 716.00
45.00
18 540.00
19 1605.12
15" Type C Underdrain
698
LF
45.00
31410.00
50.00
34 900.00
20
609.31 Curb Type 2 - Concrete
1470
LF
12.50
18 375.00
16.25
23 887.50
21
610.09 Rip Rap
4
CY
100.00
400.00
102.00
408.00
22
615.07 Loam
180
CY
60.00
10 800.00
28.00
5,040.00
23
618.13 Seeding Method No. 1
28 UNIT
35.00
980.00
25.00
700.00
24
619.12 Mulch
281 UNIT
25.00
700.00
25.00
700.00
25
627.7114" White or Yellow Pavement Line
6,588
LF
0.25
1647.00
0.25
1647.00
26
629.05 Hand Labor
10
MH
25.00
250.00
28.00
280.00
27
631.12 All Purpose Excavator
10
MH
100.00
1000.00
108.00
1080.00
28
631.172 Truck - Large
10
MH
50.00
500.00
62.00
620.00
29
645.00 Remove & Reset Sin
31
EA
500.00
1,500.00
170.00
510.00
30
652.36 Maintenance of Traffic
11
LS
10 000.00
10,0 0.00
66 700.00
66 700.00
31
652.38 Flagger
750
MH
22.00
1650000
17.00
12 750.00
32 1659.10
Mobilization not to exceed 3%
1
LS
10 000.00
10 000.00
11000.00
11 000.00
Total Project Bid:
347 334.00
389 889.50