HomeMy WebLinkAbout2014-09-08 14-298 ORDERCOUNCIL ACTION Item No. 14-298 Date: September 8, 2014 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $286,305 to Gardner Construction for the Hogan Road Safety Improvements Project Responsible Department: Engineering Commentary: On September 5, 2014, the City received four (4) bids for the Hogan Road Safety Improvements Project. The bid prices ranged from $286,305 to $472,536 (see attached bid tabulation). This project will lengthen the right turn only lane on Bangor Mall Boulevard to Hogan Road, construct a sidewalk on the Stillwater side of Bangor Mall Boulevard from the Toys R Us entrance to Hogan as well as install a pedestrian signal. In addition, the project will add a right turn only lane on Stillwater for access to Hogan Road. This bid was reviewed and recommended for approval at a Special Finance Committee meeting earlier this evening. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. In order to ensure completion prior to winter conditions, this item is requested to be considered this evening under suspension of the rules. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage First Reading Referral Department Head IORION,I Finance Director City`$olicitor Page _of_ 14-298 SEPTEMBER 8, 2014 Assigned to Councilor Graham CI`T'Y OF BANGOR. (TITLE.) Order, Authorizing Bid Award in the Amount of $286,305 to Gardner Construction for the Hogan Road Safety Improvements Project By the City Council of the City of Bangor. ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with Gardner Construction in the amount of $286,305 for the Hogan Road Safety Improvements Project. IN CITY COUNCIL SEPTEMBER 8, 2014 MOTION MADE AND SECONDED TO SUSPEND THE RULES TO TAKE UP ORDER 14-298 PASSED MOTION MADE AND SECONDED FOR PASSAGE PASSED CITY CLERK City of Bangor Bid Tabulation RFP: Hogan Road Safety Improvements Project Rid A-nin- o_1Z_1n 14-298 SEPTEMBER 8, 2014 - Sargent Corp. Stillwater ME Maine Earth Hampden, ME Gardner Const., LLC Hermon ME Stetson & Watson Holden ME Item Description Qty. Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Remove Trees 1 EA $1,200.00 $1,200.00 $400.00 $400.00 $400.00 $400.00 $300.00 $300.00 2 Removing Pavement Surface 50 SY $32.00 $1,600.00 $10.00 $500.00 $10.00 $500.00 $12.00 $600.00 3 Removing Pavement - Butt Joint 20 SY $36.00 $720.00 $30.00 $600.00 $28.00 $560.00 $40.00 $800.00 4 Common Excavation 722 CY $74.00 $53,428.00 $28.00. $20,216.00 $22.00, $15,884.00 $32.00. $23,1G4.00 5 Rock Excavation 5 CY $250.00 $1,250.00 $600.001 $3,000.00 $1.001 $5.00 $200.001 $1,000.00 6 Aggregate Base Course - Gravel 734 CY $80.00 $58,720.00 $36.00 $26,424.00 $28.00 $20,552.00 $50.00 $36,700.00 7 3/4" 19.Omm Hot Mix Asphalt 112 TON $170.00 $19,040.00 $150.00 $16,800.00 $160.00 $17,920.00 $180.00 $20,160.00 8 3/8" 9.5mm Hot Mix Asphalt 372 TON $138.00 $51,336.00 $120.00 $44,640.00 $126.00 $46,872.00 $130.00 $48,360.00 9 Hot Mix Asphalt Leveling Coarse 130 TON $138.00 $17,940.00 $120.00 $15,600.00 $130.00 $16,900.00 $130.00 $16,900.00 10 3/8" 9.5 mm Hot Mix Asphalt 94 TON $196.00 $18,424.00 $170.00 $15,980.00 $180.00 $16,920.00 $180.00 $16,920.00 11 Bituminous Tack Coat Applied 244 GAL $12.00 $2,928.00 $10.00, $2,440.00 $11.00, $2,684.00 $12.00. $2,928.00 12 40" Stormdrain 6 LF $725.00 $4,350.00 $300.00 $1,800.00 $200.00 $1,200.00 $850.00 $5,100.00 13 4' Dia Catch Basin 17 VF $1,250.00 $21,250.00 $500.00 $8,500.00 $400.00 $6,800.00 $650.00 $11,050.00 14 6' Dia Drain Manhole 7 VF $1,400.00 $9,800.00 $850.00 $5,950.00 $750.00 $5,250.00 $1,500.00 $10,500.00 15 6" Underdrain 45 LF $72.00 $3,240.00, $35.00 $1,575.00 $35.00 $1,575.00 $75.00 $3,375.00 16 12" Type C Underdrain 62 LF $114.00 $7,068.00 $67.00 $4,154.00 $44.00 $2,728.00 $85.00 $5,270.00 17 15" Stormdrain 126 LF $94.00 $11,844.00 $60.00 $7,560.00 $40.00 $5,040.00 95.00 $11,970.00 18 Detectable Warning Field SW Rams 60 SF $130.00 $7,800.00 $50.001 $3,000.00 $55.00 $3,300.00 $60.00 $3,600.00 19 Vert. Granite Curb - Rem. & Reset 57 LF $45.00 $2,565.00 $19.001 $1,083.00 $21.00 $1,197.00 $35.00 $1,995.00 20 Curb T e 2 - Concrete 1567 LF $9.00 $14,103.00 $8.001 $12,536.00 $9.00 $14,103.00 $14.00 $21,938.00 21 Rip Rap 10 CY $125.00 $1,250.00 $90.001 $900.00 $100.00 $1,000.00 $75.00 $750.00 22 Loam 115 CY $80.00 $9,200.00 $60.001 $6,900.00 $40.00 $4,600.00 $60.00 $6,900.00 23 Seeding Method Number 1 14 Unit $65.00, $910.00 $20.00 $280.00 $40.00 $560.00 $75.00 $1,050.00 24 Mulch Fiber or Straw 14 Unit $40.00 $560.00 $20.00 $280.00 $30.00 $420.00 $25.001 $350.00 25 Precast Junction Box 3 EA $385.00 $1,155.00 $420.00 $1,260.00 $500.00 $1,500.00 $400.001 $1,200.00 26 2" PVC Conduit 230 LF $16.00 $3,680.00 $23.00 $5,290.00 $16.00 $3,680.00 $18.001 $4,140.00 27 Light Pole Concrete Base 24" dia x 7'd 2 EA $990.00 $1,980.00 $3,000.00 $6,000.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 28 Pedestrian Pole Concrete Base 36" dia x 9'd 1 EA $825.00 $825.00 $3,000.00 $3,000.00 $800.00, $800.00 $900.00 $900.00 29 Single Pole Concrete Base 36" cia x 9'd 1 EA $3,850.00 $3,850.00 $6,000.001 $6,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 30 4" White or Yellow Pavement Marking line 5136 LF $0.50 $2,568.00 $0.401 $2,054.40 $0.50 $2,568.00 $0.40 $2,054.40 31 lWhite or Yellow Pavement & Curb Marking 1976 SF $2.00 $3,952.00 $1.501 $2,964.00 $2.00 $3,952.00 $1.50 $2,964.00 32 Textured Pavement Islands 940 SF $8.00 $7,520.00 $6.001 $5,640.00 $6.00 $5,640.00 $5.50 $5,170.00 33 Hand Labor 10 MH $65.00 $650.00 $40.001 $400.00 $25.00 $250.00 $50.001 $500.001 34 All Purpose Excavator 10 MH 175.00 $1,750.00 $125.001 $1,250.00 $100.00 $1,000.00 $130.00 $1,300.00 35 Truck- Large 10 MH $95.00 $950.00 $84.00 $840.00 $65.00 $650.00 90.00 $900.00 36 New Street Light 2 EA $3,850.00 $7,700.00 $3,600.00 $7,200.00 $3,100.00 $6,200.00 3500.00 $7,000.00 37 Signal Im rovements at Hogan/Stillwater Int. 1 LS $16,600.00 $16,600.00 $18,000.00 $18,000.00 $12,500.00 $12,500.00 13 000.00 $13,000.00 38 ISiqnal Im rovements at Hogan/Bangor Mall Blvd Int. 1 LS $15,920.00 $15,920.00 $18,000.00 $18,000.00 $12,000.00 $12,000.00 12 000.00 $12,000.00 39 Pedestrian Signals at Intersection 1 LS $5,865.00 $5,865.00 $5,000.00 $5,000.00 $4,200.00 $4,200.00 $5,000.00 $5,000.00 40 Remove & Reset Sin 5 EA $275.00 $1,375.00 $100.00 $500.00 $200.00 $1,000.00$150.001 $750.00 41 Maintenance of Traffic 1 LS $35,470.00 $35,470.00 $30,000.00 $30,000.00 $11,995.00 $11,995.00, $10,000.00 $10,000.00 42 Fla er 800 MH 20.00 $16,000.00 20.00 $16,000.00 16.00 $12,800.00 15.00 $12,000.00 43 Mobilization Not to Exceed 5% 1 LS $24,200.00 $24,200.00 $16,000.00 $16,000.00 $13,600.00 $13,600.00 $17,657.00 $17,657.00 Total Bid Amount $472,536.00 $346,516.40 $286,305.00 $353,155.40