HomeMy WebLinkAbout2014-05-28 14-184 ORDERCOUNCIL ACTION Item No. 14-184 Date: May 28, 2014 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $686,836 to KOBO Utility for Runway Weather Information System Responsible Department: Airport Commentary: On May 5, 2014, the City received three (3) bids for a Runway Weather Information System (RWIS). The bid prices ranged from $412,125 to $598,447 (see attached bid tabulation). RWIS is used to monitor the surface conditions of airfield operational areas to ensure safe - conditions of the aircraft movements at areas of an airport, mainly runways and taxiways. The RWIS provides: (1) temperature and condition information of runway, taxiway, and ramp pavements and (2) atmospheric weather information conditions that assist airport personnel to maintain safer and more for efficient airport. operations and maintenance. It is used to aid Pilots on airfield conditions and for Airport personnel to obtain accurate and timely information on runway conditions. This is an Airport Improvement Plan (AIP) funded project. The project cost is funded 90% with Federal funds, 5% State funds and 5% Airport funds. In order to obtain the AIP grant funds, the City must bid the work and award the contract. This information is then submitted to the FAA for execution of the grant document. This item will be reviewed by the Finance Committee on May 27, 2014. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage First Reading Referral Department Head City Manager Finance Director Page _of_ Solicitor Assigned to Councilor Gallant CITY OF BANGOR 14-184 MAY 28, 2014 (TITLE.) Order, Authorizing Bid Award in the Amount of $412,125 to KOBO Utility for Runway Weather Information System By the City Council of the City of Bangor• ORDERED, THAT, Deborah Carr, Finance Director is hereby authorized to execute a contract with K0130 Utility in the amount of $412,125 for a Runway Weather Information System. IN CITY COUNCIL MAY 28, 2014 PASSED C Y CLERK City of Bangor Bid Tabulation RFP: New Runway Weather Information System (RWIS) 14-184 MAY 28, 2014 Bid Opening: 5/5/14 KOBO Utility Construction Corp. Sargent Corp. Moulison North Corp. Sandwich, MA Stillwater, ME Biddeford, ME Item Description Qty. Unit Unit Total Unit Total Unit Total Price Price Price Price Price Price M-001-1 Mobilization 1 LS $10,000.00 $10,000.00 $28,490.00 $28,490.00 $20,000.00 $20,000.00 M-001-2 Safety and Phasing 1 LS $5,500.00 $5,500.00 $29,277.00 $29,277.00 $5,000.00 $5,000.00 Contractors Safety Plan Compliance M-002-1 Document 1 LS $6,500.00 $6,500.00 $7,500.00 $7,500.00 $2,500.00 $2,500.00 M-004-1 Runway Down Time 1 AL $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 M-005-1 As -Built Plans 1 FLS $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 P-152-1 Rock Excavation 10 CY $710.00 $7,100.00 $170.00 $1,700.00 $200.00 $2,000.00 P-152-2 Remove Existing RPU Foundation 2 EA $550.00 $1,100.00 $1,500.00 $3,000.00 $500.00 $1,000.00 #6 AWG L -824C Cable, installed in L-108-1 duct bank or conduit 23,000 LF $1 .00 $23,000.00 $1.10 $25,300.00 $1.00 $23,000.00 Bare Counterpoise Wire, installed in L-108-2 trench, including ground rods and $1.00 $12,700.00 $1.10 $13,970.00 ground connectors 121700 LF $1.00 $12,700.00 Bare #6 AWG equipment ground, L-108-3 installed in duct bank or conduit $1.00 $10,500.00 $1.10 $11,550.00 including ground connectors 10,500 LF $1.00 $10,500.00 L-108-4 Cable Removal 12,000 LF $0.30 $3,600.00 $1.10 $13,200.00 $1.00 $12,000.00 L-108-5 Reaming of Existing Ducts 1,500 LF $1.00 $1,500.00 $1.10 $1,650.00 $1.00 $1,500.00 L-109-1 Miscellaneous Work in Vault 1 LS 5 893.00 $5,893.00 $5,900.00 $5,900.00 $5,000.00 $5,000.00 Electrical Duct Bank, 2 Schedule 40 L-110-1 PVC, concrete encased 150 LF $15 .00 $2,250.00 $23.00 $3,450.00 $8.00 $1,200.00 Electrical Conduit, 2 Schedule 80 L-110-2 PVC, direct buried 12,600 LF $6 .70 $84,420.00 $7.50 $94,500.00 $6.00 $75,600.00 L-115-1 L -867D 16" Electrical Junction Can 27 EA $855.00 $23,085.00 $700.00 $18,900.00 $600.00 $16,200.00 L-115-2 Demolition of Existing Junction Can 14 EA 100.00 $1,400.00 $140.00 $1,960.00 $100.00 $1,400.00 L-140-1 Runway Weather Sensor 13 EA $5,349.00 $69,537.00 $10,000.00 $130,000.00 $8,500.00 $110,500.00 L-140-2 Runway Weather RPU 1 EA $21,133.00 $21,133.00 $50,000.00 $50,000.00 $40,000.00 $40,000.00 Runway Weather RPU wit L-140-3 Atmospheric Sensors 1 EA $36,525.00 $36,525.00 $52,000.00 $52,000.00 $45,000.00 $45,000.00 Runway Weather Sensor Extension L-140-4 Cable 20,000 LF $2.50 $50,000.00 $1.65 $33,000.00 $1.50 $30,000.00 L-140-5 Runway Weather Information System $19,376.00 $19,376.00 $52,000.00 $52,000.00 Installation and Commissioning 1 LS $45,000.00 $45,000.00 L-140-6 Demolition of Existing RPU 2 EA $650.00$1,300.00 $750.00 $1,500.00 $500.00 $1,000.00 L-140-7 New RPU Foundation 2 EA 1853 .00 3 7 06.00 3 800.00 $7,600.00 $2,500.00 $5,000.00 Bid Total 412 125.00 $S98,447.00 $478,100.00